Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Cc Road And Nali From To Near Mps Puliya Tyagi Clinic To Charan Singh Parjapati For Vishvkarma Nagar At Ward No. 18
|
Description |
Construction Of Cc Road And Nali From To Near Mps Puliya Tyagi Clinic To Charan Singh Parjapati For Vishvkarma Nagar At Ward No. 18
|
Organisation | Saharanpur Municipal Corporation Saharanpur UP | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 590 |
EMD | 44044 |
Tender Value | |
Place | saharanpur |
Link |
AAAAAAAAAA Login to view |
Start Date | July 09, 2025 23:30 |
End Date |
25/07/2025 ( 14 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreRehabilitation and upgradation for kopargaon to savli vihir section from km. 354.000 to km.362.663 total length 8.663 of nh 752 g to 4l.ps in the state of maharashtra. repairs of bad patches and dis at the risk and cost of the contractor as p
Rehabilitation and upgradation for kopargaon to savli vihir section from km. 354.000 to km.362.663 total length 8.663 of nh 752 g to 4l.ps in the state of maharashtra. repairs of bad patches and dis at the risk and cost of the contractor as p
Read moreConsultancy services for authority engineer for supervision of construction of 2l ps aambikapur bypass and sitapur bypass and pathalgaon bypass on ambikapur pathalgaon katni gumla road nh43 and ambikapur bypass from sanjaynagar to rajpuri khurd
Consultancy services for authority engineer for supervision of construction of 2l ps aambikapur bypass and sitapur bypass and pathalgaon bypass on ambikapur pathalgaon katni gumla road nh43 and ambikapur bypass from sanjaynagar to rajpuri khurd
Read moreUpgradation of construction of six lane highway corridor from ch. 8/500 to 33/500 and upgradation of existing highway to six lanes from ch. 8/500 to 40/00 section at grade section of hadapsar yevat (nh-65) in the state of maharashtra
Upgradation of construction of six lane highway corridor &#x0d from ch. 8/500 to 33/500 and upgradation of existing &#x0d highway to six lanes from ch. 8/500 to 40/00 section at&#x0d grade section of hadapsar yevat (nh-65) in the state of &#x0d maharashtra
Read moreUp-gradation existing 2 lane highway to 4 lane with construction of elevated 4 lane fly over at section talegaon to chakan from ch. 0/00 to 28/300 and up gradation of 6 lane highway chakan to shikrapur at grade from ch.28/300 to 53/20
Up-gradation existing 2 lane highway to 4 lane with &#x0d construction of elevated 4 lane fly over at section &#x0d talegaon to chakan from ch. 0/00 to 28/300 and up&#x0d gradation of 6 lane highway chakan to shikrapur at grade &#x0d from ch.28/300 to 53/20
Read moreConstruction of vop near sadahalli gate at km.538.832 of ministry identified blackspot ka01 016bs for hyderabad bengaluru section of nh7 from km. 534.720 to km. 556.840 in the state of karnataka on epc mode
Construction of vop near sadahalli gate at km.538.832 of ministry identified blackspot ka01 016bs for hyderabad bengaluru section of nh7 from km. 534.720 to km. 556.840 in the state of karnataka on epc mode
Read moreConsultancy services for authoritys engineer for supervision of construction of damteng selungthi lungar chuna road (package 2) from km 7.40 to km 57.5 nhsl specifications (design chainage km 7.45 to km 56.29 and length 48.84 km)
Consultancy services for authoritys engineer for supervision of construction of damteng selungthi lungar chuna road (package 2) from km 7.40 to km 57.5 nhsl specifications (design chainage km 7.45 to km 56.29 and length 48.84 km)
Read moreDesign and constrn of 70 m major pmt br on open fdn with steel superstructure through type at km 91.42 and sub structure for 39.62 m span modular bridge at km 92.40 incl ssi and proof checking of design and dwg from iit incl approach rd on npd road
Design and constrn of 70 m major pmt br on open fdn with steel superstructure through type at km 91.42 and sub structure for 39.62 m span modular bridge at km 92.40 incl ssi and proof checking of design and dwg from iit incl approach rd on npd road
Read moreConsultancy services for authority engineer for supervision of construction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu through an engineering, procu
Consultancy services for authority engineer for supervision of construction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu through an engineering, procu
Read moreof your Industry type