Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Rainwater Harvesting System (Recharge Shaft For Roof Top ) At Late Baburaoji Bobde School , Chinchbhuwan In Human Zone .No.3.
|
Description |
Construction Of Rainwater Harvesting System (Recharge Shaft For Roof Top ) At Late Baburaoji Bobde School , Chinchbhuwan In Human Zone .No.3.
|
Organisation | Nagpur Municipal Corporation Nagpur | State Govt. and UT |
Tender Id | 2025_NMCN_1185042_1 |
Reference Number |
ZN3 |
Tender Fee | 1090 |
EMD | 4187 |
Tender Value | |
Place | NMC WATER WORKS |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2056302 |
Start Date | May 29, 2025 18:30 |
End Date |
04/06/2025 ( Expired 4 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConstruction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278
Construction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278
Read moreConsultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Read moreProcurement of automated on-line crude blending system for cdu 2 and 3 at mtf area - cpcl, manali.
Procurement of automated on-line crude blending system for cdu 2 and 3 at mtf area - cpcl, manali.
Read moreConstruction of rrm protection wall at new tower no.: 04
Construction of rrm protection wall at new tower no.: 04 of 132 kv haflong-jiribam tl under powergrid haflong substation as per boq and instruction of engineer-in-charge
Read moreConstruction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode
Construction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode
Read moreConstruction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Read moreDesign and construction of flyover at sijwaha tiraha at ch 1377.750 on shivpuri jhansi section of nh27 for permanent rectification of morth identified blackspot location in the state of uttar pradesh on epc mode
Design and construction of flyover at sijwaha tiraha at ch 1377.750 on shivpuri jhansi section of nh27 for permanent rectification of morth identified blackspot location in the state of uttar pradesh on epc mode
Read moreConstruction of approach road and other misc. civil works for residences at 220 kv s/s farrukhabad. (p.r. no. 1300065621/2025)
Construction of approach road and other misc. civil works for residences at 220 kv s/s farrukhabad. (p.r. no. 1300065621/2025)
Read moreJal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Read moreof your Industry type