Tender Details

Particulars Details
Title
Supply Of 9 Kg Dcp Fire Ex Store Pressure At Hpcl Mazgaon Plant,Supply Of 4.5 Kg Co2 Fire Extinguishe
Description
Organisation NA | Ministry of Petroleum and Natural Gas
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee
EMD
Tender Value
Place
Link

AAAAAAAAAA

Login to view
Start Date June 01, 2025 00:11
End Date

11/06/2025 ( 4 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Tender Result
Tender Status: Active
Additional Information: Average Turn Over of Last 3 Years: 2 Lakhs Experience with Gov. Required: Years
Buyer Details
Name: Atul Kumar
Address: Atul Kumar,[email protected],HINDUSTAN PETROLEUM CORPORATION LIMITED, MAZGAON LUBE TERMINAL, HAY BUNDER, MUMBAI 400033,Mumbai,MAHARASHTRA,400033,India,022-23713816-
Ministry: Ministry Of Petroleum And Natural Gas
Department: Na
Organisation: Hindustan Petroleum Corporation Ltd
Office Address: Petroleum House
Similar Tenders
Construction of sgr hall, fire wall, store room, turfing and security fencing at 33/11 kv substation-civil line, district- prayagraj

Construction of sgr hall, fire wall, store room,turfing and security fencing at 33/11 kv substation-civil line, district- prayagraj

Read more
Supply of life-saving appliances, fire fighting appliances, labs / workshops equipment at national inland navigation institute (nini), gaighat, patna, bihar

Supply of life-saving appliances, fire fighting appliances, labs / workshops equipment at national inland navigation institute (nini), gaighat, patna, bihar

Read more
Design, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode

Design, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode

Read more
Canal water based water supply project for construction of 11.0 mld water treatment plant wtp and other related works including 5 years operation and maintenance part-2 and construction of 2.0 lakh gallon ohsr part-2 at machhiwara sahib town district

Canal water based water supply project for construction of 11.0 mld water treatment plant wtp and other related works including 5 years operation and maintenance part-2 and construction of 2.0 lakh gallon ohsr part-2 at machhiwara sahib town district

Read more
Supply of collapsible plywood packing boxes on annual rate contract basis at bnpm plant, mysuru

Supply of collapsible plywood packing boxes on annual rate contract basis at bnpm plant, mysuru

Read more
8611 maint repair replacement of gi pipe lines, pumps, pressure filters electric motors external water supply installation di ci pipe lines connected items and filter media at fresh pump house at old mrs under age i r n d nstl visakhapatnam

8611 maint repair replacement of gi pipe lines, pumps, pressure filters electric motors external water supply installation di ci pipe lines connected items and filter media at fresh pump house at old mrs under age i r n d nstl visakhapatnam

Read more
Repair/ replacement of water supply valves, cleaning of oh tanks, ug sumps, filteration plant and swimming pool installations at mil stn dhana.

Repair/ replacement of water supply valves, cleaning of oh tanks, ug sumps, filteration plant and swimming pool installations at mil stn dhana.

Read more
Canal water based water supply project for construction of 3.0 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at mudki

Canal water based water supply project for construction of 3.0 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at mudki

Read more
Canal water based water supply project for construction of 4.3 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at talwandi bhai

Canal water based water supply project for construction of 4.3 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at talwandi bhai

Read more
Canal water based water supply project for construction of 5.0 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at mallanwala khass

Canal water based water supply project for construction of 5.0 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at mallanwala khass

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise