Tender Details

Particulars Details
Title
Construction And Laying Of Foundation Blocks For Installation Of Horizontal Pumps In Newly Constructed Cgi Pump At Wss Pokhribal Stage 2nd Under Capex 2023 2024.
Description
Construction And Laying Of Foundation Blocks For Installation Of Horizontal Pumps In Newly Constructed Cgi Pump At Wss Pokhribal Stage 2nd Under Capex 2023 2024.
Organisation PHE | State Govt. and UT
Tender Id 2025_PHE_271579_1
Reference
Number
PHE/MECH/e-NIT-54 of 02/2025
Tender Fee 100
EMD 1600
Tender Value
Place Pokhribal
Link https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=841638
Start Date February 12, 2025 00:00
End Date

17/02/2025 ( Expired 116 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
2nd call for construction installation trial run and commissioning of three nos desiccant de humidification system for 200 mt capacity de humidified godown based on paddy at tepania under gomati district ad nagar under west tripura district and telia

2nd call for construction installation trial run and commissioning of three nos desiccant de humidification system for 200 mt capacity de humidified godown based on paddy at tepania under gomati district ad nagar under west tripura district and telia

Read more
Construction of innovative scheme with 2 nos sbdtw,1 no. raw water reservoir with pump house and iron removal plant at newly constructed dm office complex , dharmanagar (n) district during the year 2024-25. (deposit work)

Construction of innovative scheme with 2 nos sbdtw,1 no. raw water reservoir with pump house and iron removal plant at newly constructed dm office complex , dharmanagar (n) district during the year 2024-25. (deposit work)

Read more
Design and construction including ssi, proof checking from iit for 55 mtr span psc box girder bridge excluding approaches over gagrian nallah at km 0.300 on road gali-anganpathri under 79 rcc/31 brtf project sampark in jk ut 2nd call

Design and construction including ssi, proof checking from iit for 55 mtr span psc box girder bridge excluding approaches over gagrian nallah at km 0.300 on road gali-anganpathri under 79 rcc/31 brtf project sampark in jk ut 2nd call

Read more
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham

Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham

Read more
Annual rate contract for the work of construction and commissioning of 150/200 mm. tube wells with providing installation and commissioning of three phase/ single phase power pump set and other related civil and electrical works under for various wss

Annual rate contract for the work of construction and commissioning of 150/200 mm. tube wells with providing installation and commissioning of three phase/ single phase power pump set and other related civil and electrical works under for various wss

Read more
Special repair /replacement of ber and un serviceable submersible pump sets including allied works and provision of ups for selected medical eqpt installed in various location at mh jamnagar under ge (a) at inf lines jamnagar

Special repair /replacement of ber and unserviceable submersible pump sets including allied works and provision of ups for selected medical eqpt installed in various location at mh jamnagar under ge (a) at inf lines jamnagar

Read more
Construction of embankment, dredging of nayanjuli, walking pathway, plantation, bio diversity park along with fencing work at debi ghat at ch 0.50 of kazi nazrul islam avenue of v.i.p road under barasat highway division no.-i in the district of north

Construction of embankment, dredging of nayanjuli, walking pathway, plantation, bio diversity park fencing work at debi ghat at ch 0.50 of kazi nazrul islam avenue of v.i.p road under bhd no.-i in n 24pgs ei work for compound illu and beau.

Read more
Construction of new building for players and playing at atal khel parisar in ward no. 32 under zone no. 07

Construction of new building for players and playing at atal khel parisar in ward no. 32 under zone no. 07

Read more
Construction of 11 kv line using acsr raccoon for interlinking udma and thiruvakoli feeders and installation of transformer at kaniyan motta under electrical section, udma

Construction of 11 kv line using acsr raccoon for interlinking udma and thiruvakoli feeders and installation of transformer at kaniyan motta under electrical section, udma

Read more
Construction of rcc abutment with deck slab and wing wall along the breached road portion for connecting the road with the newly constructed structure in avalanche power house valve house road

Construction of rcc abutment with deck slab and wing wall along the breached road portion for connecting the road with the newly constructed structure in avalanche power house valve house road

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise