Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Annual Plan Edappatta Gp Annual Plan2022 23 Puliyakkodu Neerittily Road Sideprotection Work
|
| Description |
Annual Plan Edappatta Gp Annual Plan2022 23 Puliyakkodu Neerittily Road Sideprotection Work
|
| Organisation | Government of Kerala |
| Tender Id | 2023_LSGD_598239_3 |
|
Reference Number |
TN/AE/LSGD/EDP/1/2023-24 |
| Tender Fee | 555 |
| EMD | 4220 |
| Tender Value | - |
| Place | LIDEWSectionEdappattagp |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in |
| Start Date | September 02, 2023 23:30 |
| End Date |
Expired
12/09/2023
Expired 1130 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tate plan2022-23
Supply&#x0d erection testing and commissioning of 40 hp&#x0d pump and renovation of 4 pole structure at&#x0d vaduthala pump house
Read moreGp office renovation ( aap no -130, main plan2022-23)
Gp office renovation ( aap no -130, main plan2022-23)
Read moreAnnual plan2022-23 pro.no.32/23-24 concreting of kalayatholi - meenadampadi -
Annual plan-2022-23 pro.no.32/23-24 concreting of kalayatholi - meenadampadi - tholanickal road in ward 3of kooroppada gp-kpda 32/23-24-general civil work
Read moreLandslide treatment work on nh 58 from kodiyala (km. 266.130) to devprayag (km. 296.925) at 10 locations under epc mode.(as per dpr submitted by thdc) under annual plan2022-23in the state of uttarakhand
Landslide treatment work on nh 58 from kodiyala (km. 266.130) to devprayag (km. 296.925) at 10 locations under epc mode.(as per dpr submitted by thdc) under annual plan2022-23in the state of uttarakhand
Read moreState plan-state plan2022-23 optimisation of production and transmission-cwss to kuttanadu-renovation of the existing 14 mld water treatment plant including changing the filter bed media to duel media at neerettupuram wtp-renovating civil structures
State plan-state plan2022-23 optimisation of production and transmission-cwss to kuttanadu-renovation of the existing 14 mld water treatment plant including changing the filter bed media to duel media at neerettupuram wtp-renovating civil structures
Read moreConstruction of bypass road to v.kota (km.333/400to340/900) and byreddypalli town (km315/900to318/250) to 2 lane with paved shoulder of nh-42 (palamaneru krishnagiri boarder) in chittoor district of andhra pradesh on epc mode under annual plan2022-23
Construction of bypass road to v.kota (km.333/400to340/900) and byreddypalli town (km315/900to318/250) to 2 lane with paved shoulder of nh-42 (palamaneru krishnagiri boarder) in chittoor district of andhra pradesh on epc mode under annual plan2022-23
Read moreof your Industry type