Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Atmtc O And M Of Sewerage Scheme At Ferozepur City And Basti Tankan Wali For The Period Of 12 Months
|
| Description |
Atmtc O And M Of Sewerage Scheme At Ferozepur City And Basti Tankan Wali For The Period Of 12 Months
|
| Organisation | Department of Local Government | State Govt. and UT |
| Tender Id | 2025_DLG_135943_1 |
|
Reference Number |
E Tender Notice No 49 |
| Tender Fee | 3360 |
| EMD | 1.76 Lakh |
| Tender Value | - |
| Place | Ferozepur |
| Link |
View Original Tender Notice
https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=274688 |
| Start Date | March 05, 2025 18:30 |
| End Date |
Expired
26/03/2025
Expired 565 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Laying of cc road from h.no: 20-005 to 22-017 at girinagar under giri nagar ward-283, chintal circle-54 ,qbz,cmc (item no.2) (completion period 1.5 months)
Laying of cc road from h.no: 20-005 to 22-017 at girinagar under giri nagar ward-283, chintal circle-54 ,qbz,cmc (item no.2) (completion period 1.5 months)
Read moreEngaging of security guards (12 nos) at bum rukn ud dowla lake in shastripuram, attapur, in rajendranagar zone, ghmc for the year 2026-27 for a period of 12 months
Engaging of security guards (12 nos) at bum rukn ud dowla lake in shastripuram, attapur, in rajendranagar zone, ghmc for the year 2026-27 for a period of 12 months
Read moreTransportation of coal from ktk oc-iii,bhp area to gdk ocp-1 chp of rg-iii area on weight basis for a period of two months under unit rate system
Transportation of coal from ktk oc-iii,bhp area to gdk ocp-1 chp of rg-iii area on weight basis for a period of two months under unit rate system
Read moreHiring of 2 nos. of 750kva, 3-phase, 440v diesel generator sets for a period of 12 months with 600hrs/month/generator for use at naini coal mine of sccl, chhendipada, odisha state.
Hiring of 2 nos. of 750kva, 3-phase, 440v diesel generator sets for a period of 12 months with 600hrs/month/generator for use at naini coal mine of sccl, chhendipada, odisha state.
Read moreWork descriptions: remaining work of rejuvenation of bhairva talab in bhagalpur, bihar including 5 years of defect liability period and operation & maintenance under bhagalpur smart city limited, on engineering, procurement & construction (epc) contract basis.
Work descriptions: remaining work of rejuvenation of bhairva talab in bhagalpur, bihar including 5 years of defect liability period and operation & maintenance under bhagalpur smart city limited, on engineering, procurement & construction (epc) contract basis.
Read moreExtension of services of the four (04) security guards deployed in parks for a period of seven (07) months, from september, 2026 to march, 2027 in the office of the deputy director,serilingampally zone,cmc (item-02)(2nd call)
Extension of services of the four (04) security guards deployed in parks for a period of seven (07) months, from september, 2026 to march, 2027 in the office of the deputy director,serilingampally zone,cmc (item-02)(2nd call)
Read moreTransportation of coal from srp groups of mines (srp-1 and srp-3 and 3a inclines) to srpchp on weight basis under unit rate basis for a period of six (6) months as per the scope of work, terms and conditions of nit.
Transportation of coal from srp groups of mines (srp-1 and srp-3 and 3a inclines) to srpchp on weight basis under unit rate basis for a period of six (6) months as per the scope of work, terms and conditions of nit.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreOperation and maintenance of sewerage system at ferozepur city and basti tankan wali for the period of 10 months (01.06.2026 to 31.03.2027)
Operation and maintenance of sewerage system at ferozepur city and basti tankan wali for the period of 10 months (01.06.2026 to 31.03.2027)
Read moreof your Industry type