Tender Details

About Tender

🚂 Invitation For Bids: Construction Of Low Cost Road Over Bridges (Ro Bs) 🛠️🌉 The Ministry Of Railways, Central Government, Invites Bids From Eligible Contractors For The Construction Of Low Cost Ro Bs At Hubli, Under The Has Majn Section, To Eliminate Level Crossings (L Cs) No. 59 At Km. 103/300 400 And No. 62 At Km. 104/300 400 Between Sbhr Ydm Station. 📅 Bid Submission Deadline: July 15, 2024, 11:00 Am Earnest Money Deposit (Emd): Inr 753100 Interested Bidders Should Review The Complete Tender Document For Detailed Specifications, Project Scope, And Submission Guidelines. Keywords: Ministry Of Railways, Low Cost Ro Bs, Hubli, Level Crossing Elimination, Construction Contract, Tender, Bid Submission
Particulars Details
Title
Has Majn Section Elimination Of Lc No.59 At Km.103/300 400 &Amp Lc No.62 At Km.104/300 400 Between Sbhr Ydm Station By Construction Of Low Cost Ro Bs.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 75780150
Reference
Number
12MYS24of20-6-24itemno1
Tender Fee 0
EMD 7.53 Lakh
Tender Value -
Place Hubli
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/works/pdfdocs/072024/75780150/viewNitPdf_4611941.pdf

Start Date June 20, 2024 23:29
End Date
Expired 15/07/2024

Expired 822 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Sw-i: has-sklr section: proposed closure of lc no. 39 at km. 35/300-400 by diverting traffic through lc no.38 at km. 34/900-35/000 duly constructing road parallel to the track between lc no. 39 to lc no 38.sw-ii: mys-has section: proposed closure of lc no. 65 at km. 70/385 by diverting traffic through rob no. 145b at km. 71/216 by construction of a road parallel to track between lc no.65 and rob no.145b

Sw-i: has-sklr section: proposed closure of lc no. 39 at km. 35/300-400 by diverting traffic through lc no.38 at km. 34/900-35/000 duly constructing road parallel to the track between lc no. 39 to lc no 38.sw-ii: mys-has section: proposed closure of lc no. 65 at km. 70/385 by diverting traffic through rob no. 145b at km. 71/216 by construction of a road parallel to track between lc no.65 and rob no.145b

Read more
Hyderabad division: sc-mue & jkm-bdhn section :proposed construction of 2 lane robs at (1) lc no.198 at km 482/900-483/000 between indalvai -sirnapalli stations (2) lc no.190a at km 455/200-300 between janakampet - nizamabad stations (3) lc no.18jb at km19/100-200 between janakampet-bodhan stations (4)lc no.209a at km 511/0-100 between uppalavai-kamareddy stations

Hyderabad division: sc-mue & jkm-bdhn section :proposed construction of 2 lane robs at (1) lc no.198 at km 482/900-483/000 between indalvai -sirnapalli stations (2) lc no.190a at km 455/200-300 between janakampet - nizamabad stations (3) lc no.18jb at km19/100-200 between janakampet-bodhan stations (4)lc no.209a at km 511/0-100 between uppalavai-kamareddy stations

Read more
Rob/st-34/assam/raha/balance work construction of rob at kakati gaon in replacement of railway lc gate no. st-34 at rly km 104/7-8 on raha kampur road under construction of robs on 50_50 cost sharing basis (balance work)

Rob/st-34/assam/raha/balance work construction of rob at kakati gaon in replacement of railway lc gate no. st-34 at rly km 104/7-8 on raha kampur road under construction of robs on 50_50 cost sharing basis (balance work)

Read more
Conducting feasibility study, investigation, detailed survey and detailed project report preparation and detailed design work in connection with elimination of level crossings by constructing 09 robs on following level crossings on jabalpur division of wcr.1) itarsi - jabalpur section 03 nos ( lc no. 285, 305 & 309) (2) jabalpur - manikpur section - 02 nos (lc no. 328 & 340) (3) katni - singrauli section - 02 nos (lc no. 67 & 88) (4) katni - satna section - 02 nos (one common ro

Conducting feasibility study, investigation, detailed survey and detailed project report preparation and detailed design work in connection with elimination of level crossings by constructing 09 robs on following level crossings on jabalpur division of wcr.1) itarsi - jabalpur section 03 nos ( lc no. 285, 305 & 309) (2) jabalpur - manikpur section - 02 nos (lc no. 328 & 340) (3) katni - singrauli section - 02 nos (lc no. 67 & 88) (4) katni - satna section - 02 nos (one common ro

Read more
1) proposed 1x3.0x2.75m rcc pre-cast box pedestrian subway in addition to rob in lieu of exg lc no.137 at km 457/300-400 by air pushing method between vanjipalaiyam and somanur stations. 2) proposed 1x3.0x2.75m rcc pre-cast box pedestrian subway in addition to rob in lieu of exg. lc no.141 at km 463/23-25 by air pushing method between somanur and sulur road stations. 3) proposed 1x7.0x3.60m rcc pre-cast box subway in addition to pro. rob in lieu of exg. lc no.142 at km 466/21-23 by air push

1) proposed 1x3.0x2.75m rcc pre-cast box pedestrian subway in addition to rob in lieu of exg lc no.137 at km 457/300-400 by air pushing method between vanjipalaiyam and somanur stations. 2) proposed 1x3.0x2.75m rcc pre-cast box pedestrian subway in addition to rob in lieu of exg. lc no.141 at km 463/23-25 by air pushing method between somanur and sulur road stations. 3) proposed 1x7.0x3.60m rcc pre-cast box subway in addition to pro. rob in lieu of exg. lc no.142 at km 466/21-23 by air push

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise