Tender Details
Particulars | Details |
---|---|
Title |
Day To Day Shifting / Repairing/ Replacement Of Broken Hdpe And/Or M.S Pipes Of Delivery Pipeline (I.E. Dismantling, Loading, Laying And Joint Making) For A Period Of One Year At Nmoc Ii (A) Exp Mine.
|
Description |
Day To Day Shifting / Repairing/ Replacement Of Broken Hdpe And/Or M.S Pipes Of Delivery Pipeline (I.E. Dismantling, Loading, Laying And Joint Making) For A Period Of One Year At Nmoc Ii (A) Exp Mine.
|
Organisation | Western Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_WCL_300835_1 |
Reference Number |
ma9511-enm-072-2023-24 |
Tender Fee | 0 |
EMD | 21400 |
Tender Value | |
Place | Majri |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=311632 |
Start Date | February 09, 2024 23:30 |
End Date |
19/02/2024 ( Expired 455 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Shifting installation commissioning pump as well as laying fitting dismantling of different size pipeline extension shortenging of delivery pipes as per requirement depending water level up and down of sump water of bharatpur ocp for one year
Shifting installation commissioning pump as well as laying fitting dismantling of different size pipeline extension shortenging of delivery pipes as per requirement depending water level up and down of sump water of bharatpur ocp for one year
Read moreAnnual contract for dismantling, shifting and re-commissioning etc and day to day running maintenance of 3 nos 500gpm pump-motor at phase ii colony and 4 nos 500 gpm pump-motor at kmp colony at akk ocp bnk area for a period of one years.
Annual contract for dismantling, shifting and re-commissioning etc and day to day running maintenance of 3 nos 500gpm pump-motor at phase ii colony and 4 nos 500 gpm pump-motor at kmp colony at akk ocp bnk area for a period of one years.
Read moreDismantling, repairing and laying of the 8 inch dia m.s. pipes of the delivery pipeline of the 2000 g.p.m. pump motor set, in operation at the h patch in mine, w.r.t. karo ocp, under bnk area
Dismantling, repairing and laying of the 8 inch dia m.s. pipes of the delivery pipeline of the 2000 g.p.m. pump motor set, in operation at the h patch in mine, w.r.t. karo ocp, under bnk area
Read moreDi / shifting and extension 6 inch dia existing and old dismantling 6 inch dia ms pipes 1000 mtrs (166 nos) 34 nos. bend 34 nos tepper /short piece dismantling from old rout ob dump and loading crrying laying and joining of 6 inch dia m.s. pip
Di / shifting and extension 6 inch dia existing and old dismantling 6 inch dia ms pipes 1000 mtrs (166 nos) 34 nos. bend 34 nos tepper /short piece dismantling from old rout ob dump and loading crrying laying and joining of 6 inch dia m.s. pip
Read moreDi and shifting of the digital flowmeter installed at the delivery pipeline of the 2000 gpm pump by dismantling, cutting and laying of 8 inch dia m.s. pipeline, in mine w.r.t. karo ocp, under bnk area
Di and shifting of the digital flowmeter installed at the delivery pipeline of the 2000 gpm pump by dismantling, cutting and laying of 8 inch dia m.s. pipeline, in mine w.r.t. karo ocp, under bnk area
Read moreDay to day shifting of 4 inch dia pipeline by dismantling, laying, cutting, jointing (welding) etc as per advancement of mine for firefighting at jamun dohar and repairing of existing pipeline as and when required for a period of one year under kdh
Day to day shifting of 4 inch dia pipeline by dismantling, laying, cutting, jointing (welding) etc as per advancement of mine for firefighting at jamun dohar and repairing of existing pipeline as and when required for a period of one year under kdh
Read moreDay to day works related to dismantling,shifting, laying,fitting, commissioning, installation of pipelines/pumps in the mines for dewatering,tanker loading etc.as and when required basis for the period of365 days as per the direction ofeic of locp,la
Day to day works related to dismantling,shifting, laying,fitting, commissioning, installation of pipelines/pumps in the mines for dewatering,tanker loading etc.as and when required basis for the period of365 days as per the direction ofeic of locp,la
Read moreLaying and dismantling of 6dia hdpe and 8dia ms/gi pipeline to deal with spontaneous heating of coal in mine 2) laying of 8pipeline and preparation/repairing of filling point at quarry 2 sump and near inpit crusher under ashok project, ppr area..
Laying and dismantling of 6dia hdpe and 8dia ms/gi pipeline to deal with spontaneous heating of coal in mine 2) laying of 8pipeline and preparation/repairing of filling point at quarry 2 sump and near inpit crusher under ashok project, ppr area.
Read moreWork of maintenance of hand pump labour only repairing work of india mark ii hand pump including replacement of unserviceable parts i.e. chain, handle, axle, washer, cylinder, riser pipe, link rod either one or more parts in block banda distt. sagar
Work of maintenance of hand pump labour only repairing work of india mark ii hand pump including replacement of unserviceable parts i.e. chain, handle, axle, washer, cylinder, riser pipe, link rod either one or more parts in block banda distt. sagar
Read moreWork of maintenance of hand pump labour only repairing work of india mark ii hand pump including replacement of unserviceable parts i.e. chain, handle, axle, washer, cylinder, riser pipe, link rod either one or more parts in block shahgarh dt. sagar
Work of maintenance of hand pump labour only repairing work of india mark ii hand pump including replacement of unserviceable parts i.e. chain, handle, axle, washer, cylinder, riser pipe, link rod either one or more parts in block shahgarh dt. sagar
Read moreof your Industry type