Tender Details

Particulars Details
Title
Day To Day Shifting / Repairing/ Replacement Of Broken Hdpe And/Or M.S Pipes Of Delivery Pipeline (I.E. Dismantling, Loading, Laying And Joint Making) For A Period Of One Year At Nmoc Ii (A) Exp Mine.
Description
Day To Day Shifting / Repairing/ Replacement Of Broken Hdpe And/Or M.S Pipes Of Delivery Pipeline (I.E. Dismantling, Loading, Laying And Joint Making) For A Period Of One Year At Nmoc Ii (A) Exp Mine.
Organisation Western Coalfields Limited | Public Sector Undertakings
Tender Id 2024_WCL_300835_1
Reference
Number
ma9511-enm-072-2023-24
Tender Fee 0
EMD 21400
Tender Value
Place Majri
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=311632
Start Date February 09, 2024 23:30
End Date

19/02/2024 ( Expired 455 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Shifting installation commissioning pump as well as laying fitting dismantling of different size pipeline extension shortenging of delivery pipes as per requirement depending water level up and down of sump water of bharatpur ocp for one year

Shifting installation commissioning pump as well as laying fitting dismantling of different size pipeline extension shortenging of delivery pipes as per requirement depending water level up and down of sump water of bharatpur ocp for one year

Read more
Annual contract for dismantling, shifting and re-commissioning etc and day to day running maintenance of 3 nos 500gpm pump-motor at phase ii colony and 4 nos 500 gpm pump-motor at kmp colony at akk ocp bnk area for a period of one years.

Annual contract for dismantling, shifting and re-commissioning etc and day to day running maintenance of 3 nos 500gpm pump-motor at phase ii colony and 4 nos 500 gpm pump-motor at kmp colony at akk ocp bnk area for a period of one years.

Read more
Dismantling, repairing and laying of the 8 inch dia m.s. pipes of the delivery pipeline of the 2000 g.p.m. pump motor set, in operation at the h patch in mine, w.r.t. karo ocp, under bnk area

Dismantling, repairing and laying of the 8 inch dia m.s. pipes of the delivery pipeline of the 2000 g.p.m. pump motor set, in operation at the h patch in mine, w.r.t. karo ocp, under bnk area

Read more
Di / shifting and extension 6 inch dia existing and old dismantling 6 inch dia ms pipes 1000 mtrs (166 nos) 34 nos. bend 34 nos tepper /short piece dismantling from old rout ob dump and loading crrying laying and joining of 6 inch dia m.s. pip

Di / shifting and extension 6 inch dia existing and old dismantling 6 inch dia ms pipes 1000 mtrs (166 nos) 34 nos. bend 34 nos tepper /short piece dismantling from old rout ob dump and loading crrying laying and joining of 6 inch dia m.s. pip

Read more
Di and shifting of the digital flowmeter installed at the delivery pipeline of the 2000 gpm pump by dismantling, cutting and laying of 8 inch dia m.s. pipeline, in mine w.r.t. karo ocp, under bnk area

Di and shifting of the digital flowmeter installed at the delivery pipeline of the 2000 gpm pump by dismantling, cutting and laying of 8 inch dia m.s. pipeline, in mine w.r.t. karo ocp, under bnk area

Read more
Day to day shifting of 4 inch dia pipeline by dismantling, laying, cutting, jointing (welding) etc as per advancement of mine for firefighting at jamun dohar and repairing of existing pipeline as and when required for a period of one year under kdh

Day to day shifting of 4 inch dia pipeline by dismantling, laying, cutting, jointing (welding) etc as per advancement of mine for firefighting at jamun dohar and repairing of existing pipeline as and when required for a period of one year under kdh

Read more
Day to day works related to dismantling,shifting, laying,fitting, commissioning, installation of pipelines/pumps in the mines for dewatering,tanker loading etc.as and when required basis for the period of365 days as per the direction ofeic of locp,la

Day to day works related to dismantling,shifting, laying,fitting, commissioning, installation of pipelines/pumps in the mines for dewatering,tanker loading etc.as and when required basis for the period of365 days as per the direction ofeic of locp,la

Read more
Laying and dismantling of 6dia hdpe and 8dia ms/gi pipeline to deal with spontaneous heating of coal in mine 2) laying of 8pipeline and preparation/repairing of filling point at quarry 2 sump and near inpit crusher under ashok project, ppr area..

Laying and dismantling of 6dia hdpe and 8dia ms/gi pipeline to deal with spontaneous heating of coal in mine 2) laying of 8pipeline and preparation/repairing of filling point at quarry 2 sump and near inpit crusher under ashok project, ppr area.

Read more
Work of maintenance of hand pump labour only repairing work of india mark ii hand pump including replacement of unserviceable parts i.e. chain, handle, axle, washer, cylinder, riser pipe, link rod either one or more parts in block banda distt. sagar

Work of maintenance of hand pump labour only repairing work of india mark ii hand pump including replacement of unserviceable parts i.e. chain, handle, axle, washer, cylinder, riser pipe, link rod either one or more parts in block banda distt. sagar

Read more
Work of maintenance of hand pump labour only repairing work of india mark ii hand pump including replacement of unserviceable parts i.e. chain, handle, axle, washer, cylinder, riser pipe, link rod either one or more parts in block shahgarh dt. sagar

Work of maintenance of hand pump labour only repairing work of india mark ii hand pump including replacement of unserviceable parts i.e. chain, handle, axle, washer, cylinder, riser pipe, link rod either one or more parts in block shahgarh dt. sagar

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise