Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Providing And Installation Of 33/0.4 Kva 3 Phase Transformer At Sahibkhedi Raw Water Pump House.
|
Description |
Providing And Installation Of 33/0.4 Kva 3 Phase Transformer At Sahibkhedi Raw Water Pump House.
|
Organisation | Directorate Urban Administration and Development | State Govt. and UT |
Tender Id | 2025_UAD_427872_1 |
Reference Number |
PHE/E-TENDER 65/2025 |
Tender Fee | 2295 |
EMD | 15810 |
Tender Value | |
Place | Ujjain |
Link | https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=504452 |
Start Date | June 02, 2025 16:00 |
End Date |
23/06/2025 ( Expired 3 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Leasing of land for installation of a modern fueling station and allied facilities on malabar cements ltd (mcl) owned land at mcl cgu unit, pallipuram, cherthala, alapuzha district
Leasing of land for installation of a modern fueling station and allied facilities on malabar cements ltd (mcl) owned land at mcl cgu unit, pallipuram, cherthala, alapuzha district
Read moreDetailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Detailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Read moreSupply, installation and commissioning of 01 no. of fully automated free light chain analyzer at aiims, bhubaneswar
Supply, installation and commissioning of 01 no. of fully automated free light chain analyzer at aiims, bhubaneswar
Read moreDesign and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package a
Design and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package a
Read moreDesign and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package b
Design and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package b
Read moreSupply, fabrication, assembly and installation of stainless steel equipments in laundry area at wmp, frfcf
Supply, fabrication, assembly and installation of stainless steel equipments in laundry area at wmp, frfcf
Read moreSupply, installation commissioning of automatic cutting and sealing machine at aiims, bhubaneswar
Supply, installation commissioning of automatic cutting and sealing machine at aiims, bhubaneswar
Read moreReconstruction of narrow minor bridge 3 nos. to four lane configuration n.h.63 section kuslamb yedshi at ch. 4.113 and 9.748 and 10.203 on epc mode in the state of maharashtra
Reconstruction of narrow minor bridge 3 nos. to four lane configuration n.h.63 section kuslamb yedshi at ch. 4.113 and 9.748 and 10.203 on epc mode in the state of maharashtra
Read moreDemolition of existing rcc buildings such as painting hangar toilet block removal of existing old roof sheets acs and other structure bulows providing area for parking metro cars with covered roofing at eastern side of tatra hangar for parking area
Demolition of existing rcc buildings such as painting hangar toilet block removal of existing old roof sheets acs and other structure bulows providing area for parking metro cars
 with covered roofing at eastern side of tatra hangar for parking area
Read moreRejuvenation of sankat mochan lake with construction, installation and commissioning of 100 kld stp under amrut 2.0 scheme at chhatarpur
Rejuvenation of sankat mochan lake with construction, installation and commissioning of 100 kld stp under amrut 2.0 scheme at chhatarpur
Read moreof your Industry type