Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Balance Earthwork And Lining For Diversion Canal In Km 37, 48 And 49 Of I.R.B.C. Tq. Kalamnuri Dist. Hingoli
|
| Description |
Construction Of Balance Earthwork And Lining For Diversion Canal In Km 37, 48 And 49 Of I.R.B.C. Tq. Kalamnuri Dist. Hingoli
|
| Organisation | Government of Maharashtra |
| Tender Id | 2023_CCCA_961461_2 |
|
Reference Number |
E TENDER NOTICE NO.1 FOR 2023-24 |
| Tender Fee | 5900 |
| EMD | 4.12 Lakh |
| Tender Value | |
| Place | Executive Engineer, UPP Div. No.5, Hadgaon, Dist.N |
| Link |
View Original Tender Notice
https://mahatenders.gov.in |
| Start Date | November 08, 2023 22:30 |
| End Date |
Expired
28/11/2023
Expired 965 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Extension and new construction of staffs quarter and compound wall for p. h. sub-centre at mouza mangi, tq.- pandharkawada, dist.- yavatmal
Extension and new construction of staffs quarter and compound wall for p. h. sub-centre at mouza mangi, tq.- pandharkawada, dist.- yavatmal
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreConstruction of earthwork and lining for slip portion in km 40 and 41 of i.r.b.c. tq. kalamnuri dist. hingoli
Construction of earthwork and lining for slip portion in km 40 and 41 of i.r.b.c. tq. kalamnuri dist. hingoli
Read moreConstruction of excavation, earthwork, lining and structure for canal no 1, km 19 to 37 brahmagavan lift irrigation scheme, tq. paithan dist. chhatrapati sambhajinagar.
Construction of excavation, earthwork, lining and structure for canal no 1, km 19 to 37 brahmagavan lift irrigation scheme, tq. paithan dist. chhatrapati sambhajinagar.
Read moreof your Industry type