Tender Details

Particulars Details
Title
Consultancy Work For Preparation Of Detailed Project Report For The Widening And Construction Of 4 Lane High Level Bridge In Place Of Existing 2 Lane Bridge Across Ayad River And Widening Of 2 Lane Road Under Bridge (Rub) As 4 Lane (Rub) Below Sh 32
Description
Consultancy Work For Preparation Of Detailed Project Report For The Widening And Construction Of 4 Lane High Level Bridge In Place Of Existing 2 Lane Bridge Across Ayad River And Widening Of 2 Lane Road Under Bridge (Rub) As 4 Lane (Rub) Below Sh 32
Organisation UIT Udaipur | State Govt. and UT
Tender Id 2025_UITUD_470726_1
Reference
Number
NIT_10_02
Tender Fee 1680
EMD 90000
Tender Value
Place Udaipur
Link https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=843033
Start Date May 20, 2025 20:30
End Date

28/05/2025 ( Expired 39 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Consultancy services for preparation of dpr for i. widening to 2l ps of balance reaches km 184.840 to km 190.00 and km 194.840 to 198.800, ii. construction of additional vent to existing major bridge at km 210.0 to 2 of nizamabad to jagdalpur nh 63

Consultancy services for preparation of dpr for i. widening to 2l ps of balance reaches km 184.840 to km 190.00 and km 194.840 to 198.800, ii. construction of additional vent to existing major bridge at km 210.0 to 2 of nizamabad to jagdalpur nh 63

Read more
Consultancy services for preparation of dpr for widening to 4 lane divided carriageway of chhapra gopalganj section of nh-85 in the state of bihar

Consultancy services for preparation of dpr for widening to 4 lane divided carriageway of chhapra gopalganj section of nh-85 in the state of bihar

Read more
Consultancy services for preparation of detailed project report (dpr) for construction of 4 lane elevated corridor from natesan nagar rob (km 38.220 of nh-45a) to ariyankuppam bridge (km 40.780 of nh-45a) and widening of existing road to 4 lane road

Consultancy services for preparation of detailed project report (dpr) for construction of 4 lane elevated corridor from natesan nagar rob (km 38.220 of nh-45a) to ariyankuppam bridge (km 40.780 of nh-45a) and widening of existing road to 4 lane road

Read more
Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap

Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap

Read more
Consultancy services for feasibility study and dpr preparation for a.upgradation to 4 lane of nh 42 old nh 219 from km 58 600 to 140 680 palamaneru to krishnagiri border section and b.formation of bypass to madanapalli town on nh42 in the state of ap

Consultancy services for feasibility study and dpr preparation for a.upgradation to 4 lane of nh 42 old nh 219 from km 58 600 to 140 680 palamaneru to krishnagiri border section and b.formation of bypass to madanapalli town on nh42 in the state of ap

Read more
Widening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m

Widening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m

Read more
Construction supervision cum design consultancy services for construction of 2 lane major bridge including approaches over brahmaputra between majuli on north bank and jorhat on south bank(job no 715/as/2020-21/213).

Construction supervision cum design consultancy services for construction of 2 lane major bridge including approaches over brahmaputra between majuli on north bank and jorhat on south bank(job no 715/as/2020-21/213).

Read more
Consultancy services for preparation of dpr for widening to 4 lane divided carriageway of chhapra rewaghat muzaffarpur section of nh-722 in the state of bihar

Consultancy services consultancy services for preparation of dpr for widening to 4 lane divided carriageway of chhapra rewaghat muzaffarpur section of nh-722 in the state of bihar

Read more
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)

Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise