Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Detailed Estimate For Utility Shifting Of Kurobaha Gaon Pwss
|
| Description |
Detailed Estimate For Utility Shifting Of Kurobaha Gaon Pwss
|
| Organisation | Public Health Engineering Department | State Govt. and UT |
| Tender Id | 2025_PHED_46214_1 |
|
Reference Number |
IFB NO 17 OF 2025-26 |
| Tender Fee | 2000 |
| EMD | 43380 |
| Tender Value | - |
| Place | Kurobaha Gaon PWSS |
| Link |
View Original Tender Notice
https://assamtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=73700 |
| Start Date | August 08, 2025 20:30 |
| End Date |
Expired
29/08/2025
Expired 408 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Detailed estimate of construction of delux sauchalaya near pappu paswan and raman chaudhary's boundary ward no.44 nagar nigam sasaram.
Detailed estimate of construction of delux sauchalaya near pappu paswan and raman chaudhary's boundary ward no.44 nagar nigam sasaram.
Read moreDetailed estimate of pcc road and rcc drain from daya sah house to nandu keshri house at ward no 44,nagar nigam, sasaram
Detailed estimate of pcc road and rcc drain from daya sah house to nandu keshri house at ward no 44,nagar nigam, sasaram
Read moreDetailed and abstract estimate for borewell for hindu graveyard at ranga reddy-281, chintal circle-54,qbz,cmc (item no.8) (completion period 1 month)
Detailed and abstract estimate for borewell for hindu graveyard at ranga reddy-281, chintal circle-54,qbz,cmc (item no.8) (completion period 1 month)
Read moreDetailed and abstract estimate for borewell for muslim graveyard at ranga reddy-281, chintal circle-54,qbz,cmc (item no.7) (completion period 1 month)
Detailed and abstract estimate for borewell for muslim graveyard at ranga reddy-281, chintal circle-54,qbz,cmc (item no.7) (completion period 1 month)
Read moreDetailed and abstract estimate for borewell for hindu graveyard at guburgutta under rangareddy-281 ,chintal circle-54,qbz,cmc. (item no.11) (completion period 1 month)
Detailed and abstract estimate for borewell for hindu graveyard at guburgutta under rangareddy-281 ,chintal circle-54,qbz,cmc. (item no.11) (completion period 1 month)
Read moreDetailed and abstract estimate for borewell for muslim graveyard graveyard at nehru nagar under ranga reddy-281, chintal circle-54,qbz,cmc (item no.9) (completion period 1 month)
Detailed and abstract estimate for borewell for muslim graveyard graveyard at nehru nagar under ranga reddy-281, chintal circle-54,qbz,cmc (item no.9) (completion period 1 month)
Read moreConstruction of high yield tube well at near samudayik bhawan khazpura gaon in ward no. 04
Construction of high yield tube well at near samudayik bhawan khazpura gaon in ward no. 04
Read moreConducting detailed survey including preliminary investigation, net level survey, taking longitudinal sections and cross sections along the alignment and detailed final survey including preparation of designs, drawings and estimates of distributory network including minors or sub-minors or field channels by conducting detailed block level survey for an extent 35,220 acres to identify a minimum net ayacut of 29,937 acres by proposing a ph at pragallapalli village, dummugudem mandal of bhadradri
Conducting detailed survey including preliminary investigation, net level survey, taking longitudinal sections and cross sections along the alignment and detailed final survey including preparation of designs, drawings and estimates of distributory network including minors or sub-minors or field channels by conducting detailed block level survey for an extent 35,220 acres to identify a minimum net ayacut of 29,937 acres by proposing a ph at pragallapalli village, dummugudem mandal of bhadradri kothagudem district on left bank of sitamma sagar multi purpose project.(2nd call)
Read moreShifting of transmission circle, gayajee office at 2nd floor of back up sldc (g+2) building, chandauti, gayajee.
Shifting of transmission circle, gayajee office at 2nd floor of back up sldc (g+2) building, chandauti, gayajee.
Read moreEstimate for jungle clearance of bund ramappa lake, palampet (v), venkatapur (m), mulugu district.
Estimate for jungle clearance of bund ramappa lake, palampet (v), venkatapur (m), mulugu district.
Read moreof your Industry type