Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Wbmad/Bm/Pwd/Nit 66(e Sf)/2023 24/Sl 1
|
Description |
Construction Of Concrete Road From Sonali Cinema Hall To Bagjola Khal Bridge, Ward No 01, Baranagar Municipality
|
Organisation | Government of West Bengal |
Tender Id | 2023_MAD_556026_1 |
Reference Number |
WBMAD/BM/PWD/NIT- 66(eSF)/2023-24 |
Tender Fee | 0 |
EMD | 39018 |
Tender Value | |
Place | BARANAGAR MUNICIPALITY |
Link | https://wbtenders.gov.in |
Start Date | August 11, 2023 15:30 |
End Date |
28/08/2023 ( Expired 675 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for authoritys engineer for supervision of construction of damteng selungthi lungar chuna road (package 2) from km 7.40 to km 57.5 nhsl specifications (design chainage km 7.45 to km 56.29 and length 48.84 km)
Consultancy services for authoritys engineer for supervision of construction of damteng selungthi lungar chuna road (package 2) from km 7.40 to km 57.5 nhsl specifications (design chainage km 7.45 to km 56.29 and length 48.84 km)
Read moreConstruction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Read moreConsultancy services for ae for supervision of construction of missing link from birhu to lathiani into 4 lane from km 35.550 to km 42.800 on nh-503a including cable stayed bridge (0.860 km) in himachal pradesh on epc mode.
Consultancy services for ae for supervision of construction of missing link from birhu to lathiani into 4 lane from km 35.550 to km 42.800 on nh-503a including cable stayed bridge (0.860 km) in himachal pradesh on epc mode.
Read moreConstruction of road kibithu kundao from km 0.000 to km 52.000 design length 0.000 to 19.557 kms green field alignment to nhsl specifications under project udayak in anjaw district of arunachal pradesh state on epc mode
Construction of road kibithu kundao from km 0.000 to km 52.000
 design length 0.000 to 19.557 kms green field alignment to nhsl
 specifications under project udayak in anjaw district of arunachal
 pradesh state on epc mode
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of 4 lane elevated corridor from natesan nagar rob (km 38.220 of nh-45a) to ariyankuppam bridge (km 40.780 of nh-45a) and widening of existing road to 4 lane road
Consultancy services for preparation of detailed project report (dpr) for construction of 4 lane elevated corridor from natesan nagar rob (km 38.220 of nh-45a) to ariyankuppam bridge (km 40.780 of nh-45a) and widening of existing road to 4 lane road
Read moreConsultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Read moreConstruction of service road at katulboard from nehru nagar to urla of nh-53 from ch.309.940 to 312.250 on lhs and ch. 309.940 to 311.630 on rhs in the state of chhattisgarh
Construction of service road at katulboard from nehru nagar to urla of nh-53 from ch.309.940 to 312.250 on lhs and ch. 309.940 to 311.630 on rhs in the state of chhattisgarh
Read moreConstruction of road changlangshu village to yongkhao village from km 0.00 to km 24.900 ( net length 24.900 km) to nhsl specification under 100 rcc /15 brtf/ project sewak in nagaland state under epc mode
Construction of road changlangshu village to yongkhao village from km 0.00 to km 24.900 ( net length 24.900 km) to nhsl specification under 100 rcc /15 brtf/ project sewak in nagaland state under epc mode
Read moreConstruction of cc road at ward no 10 dulare ahirwar to guddibai and ramsevak to arjun and ghasiram to raju malvi house municipal council narmadapuram mp.
Construction of cc road at ward no 10 dulare ahirwar to guddibai and ramsevak to arjun and ghasiram to raju malvi house municipal council narmadapuram mp.
Read moreCs for preparation of dpr for (i) cons. of 6 lane prayagraj southern bypass phase2 (l 34.4 km) section from km 0.000 to 34.400 in uttar pradesh (ii) construction of new bridge at yamuna river parallel to naini cable stayed bridge in uttarpradesh
Cs for preparation of dpr for (i) cons. of 6 lane prayagraj southern bypass phase2 (l 34.4 km) section from km 0.000 to 34.400 in uttar pradesh (ii) construction of new bridge at yamuna river parallel to naini cable stayed bridge in uttarpradesh
Read moreof your Industry type