Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Extension Of New Ht/Lt Line By 200 Kva And 100 Kva Sub Station With 11 Kv Covered Conductor 1 Cx70mm2 To Give Three Phase Service Connection To Water Innovative Source And A Water Boosting Station At Tapsa Para
|
Description |
Extension Of New Ht/Lt Line By 200 Kva And 100 Kva Sub Station With 11 Kv Covered Conductor 1 Cx70mm2 To Give Three Phase Service Connection To Water Innovative Source And A Water Boosting Station At Tapsa Para
|
Organisation | Chairman cum MD, TSECL | State Govt. and UT |
Tender Id | 2025_POWER_59874_1 |
Reference Number |
DGM/ED_AMP/2024-25/11 |
Tender Fee | 10000 |
EMD | 86638 |
Tender Value | |
Place | DGM ED Amarpur Gomati Tripura |
Link | https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=60897 |
Start Date | March 29, 2025 19:55 |
End Date |
05/04/2025 ( Expired 85 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ked/14 of 2025-26 dated 24.06.2025 for creation of 100kva sub stations alongwith ht and lt line at dhanu parole mohra bagh stage i and ii and dhanu parole mohra kalna stage ii under water supply scheme jjm
Creation of 100kva sub stations alongwith ht/lt line at dhanu parole mohra bagh stage-i and ii and dhanu parole mohra kalna stage-ii under water supply scheme jjm (phe) in respect of jpdcl electric sd ramkot of ed kathua on turnkey basis
Read moreDnit for laying of tower foundations,erection of towers,stringing and sagging of conductor for 220 kv line from 400 kv nakodar to railway traction sub station nakodar 2 phase railway supply (contributory work)
Dnit for laying of tower foundations,erection of towers,stringing and sagging of conductor for 220 kv line from 400 kv nakodar to railway traction sub station nakodar 2 phase railway supply (contributory work)
Read moreProviding new borewell (150mm dia) with three phase 3.0 hp submergible motor with necessary pipeline arrangements to meet out the water demand for earth pits, office usage etc., at narasingampatty 110/33-11 kv sub station
Providing new borewell (150mm dia) with three phase 3.0 hp submergible motor with necessary pipeline arrangements to meet out the water demand for earth pits, office usage etc., at narasingampatty 110/33-11 kv sub station
Read moreTender for electrification to loh of village powari by providing 1-phase lt extension from existing 22/0.4kv. 100kva s/stn. powari under electrical sub-division, hpsebl, reckong peo.
Tender for electrification to loh of village powari by providing 1-phase lt extension from existing 22/0.4kv. 100kva s/stn. powari under electrical sub-division, hpsebl, reckong peo.
Read moreConstruction of 33 kv line, construction of 33/11kv, 1x2.5 mva sub-station and lt line for new industrial estate at no two dhemajibari, dist. biswanath, assam
Construction of 33 kv line construction of 33/11kv 1x2.5 mva sub station and lt line for new industrial estate at no two dhemajibari dist biswanath assam
Read moreRefurbishment of 2000kva rated,11kv/6.6 transformer and pumping station equipment duly repairing, reconditioning and replacement of spares to the 6.6kv ht panels also to provide mandatory spares the intake well raw water pumping station in kalabgoor under mwss phase i and phase ii under transmission division no.ii patancheru
Refurbishment of 2000kva rated, 11kv/6.6 transformer and pumping station equipment duly repairing, reconditioning and replacement of spares to the 6.6kv ht panels also to provide mandatory spares to the intake well raw water pumping station at kalabgoor under mwss phase-i and ii under transmission division no.ii, patancheru
Read moreProviding sop to jsv by prov. 11/0.4kv, 100kva substation a/w ht, lt line in tauni devi ed hamirpur
Providing sop to jsv by prov. 11/0.4kv, 100kva substation a/w ht, lt line and ct-pt unit for water supply scheme to sc basti lambera in gp khiah lohakharian in (e) section kot under esd tauni devi. (ed hamirpur) (deposit scheme).
Read moreCivil works for construction of cable trench and pathway at sitalkuchi 33/11 kv sub-station for drawl of new 11kv ht oh line for 11kv sitai and lalbazar feeder bifurcation emanating from sitalkuchi 33/11kv sub station under mathabhanga division
Civil works for construction of cable trench and pathway at sitalkuchi 33/11 kv sub-station for drawl of&#x0d new 11kv ht oh line for 11kv sitai and lalbazar feeder bifurcation emanating from sitalkuchi 33/11kv sub station under mathabhanga&#x0d division
Read moreEstimate for construction of new 11 kv ht line and 3 - phase lt line and lt re-organization to proposed 25 kva ,11/0.4 kv s/stn thalehar in (e) section ahju under electrical sub- division, hpsebl, chauntra
Estimate for construction of new 11 kv ht line and 3 - phase lt line and lt re-organization to proposed 25 kva ,11/0.4 kv s/stn thalehar in (e) section ahju under electrical sub- division, hpsebl, chauntra
Read moreWork of construction of 11kv lt lines, installation of 11.04 kv s-s and other associated work for releasing new connection shifting of line against packages, to be passed from time to time in full deposit scheme under edd, sikandra, agra
Work of construction of 11kv lt lines, installation of 11.04 kv s-s and other associated work for releasing new connection shifting of line against packages, to be passed from time to time in full deposit scheme under edd, sikandra, agra
Read moreof your Industry type