Tender Details

Particulars Details
Title
Appointment Of Third Party Inspection Agency(tpia) For Construction Of Left Link Channel And Left Distribution System For Cca Of 760ha And Right Distribution System For Cca Of 2000ha.Through Under Ground Pipe Line Irrigation System(pressure Flow)....
Description
Appointment Of Third Party Inspection Agency(tpia) For Construction Of Left Link Channel And Left Distribution System For Cca Of 760ha And Right Distribution System For Cca Of 2000ha Through Under Ground Pipe Line Irrigation System(pressure Flow)....
Organisation Government of Odisha
Tender Id 2023_CEBMB_93687_1
Reference
Number
CE and BM, RBVN-06/2023-24
Tender Fee 10000
EMD 91000
Tender Value
Place O/o the CE and BM , RBVN Basin, Berhampur
Link https://tendersodisha.gov.in
Start Date September 04, 2023 15:30
End Date

25/09/2023 ( Expired 646 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Repair/ maint of water supply ci / gi / pvc pipe line, complaint of leakage, gate valves fitting and distribution system in certain locations of 54 bde area, arty, armd units and certain md accomodation under age em i of ge (u) secunderabad.

Repair/ maint of water supply ci / gi / pvc pipe line, complaint of leakage, gate valves fitting and distribution system in certain locations of 54 bde area, arty, armd units and certain md accomodation under age em i of ge (u) secunderabad.

Read more
Work of electrical connection for operation of pressure irrigation system invillage bardhawa (kakarhawa) and village dharamoli (lotan) under depostie scheme year 2024-25 under edd siddharthanagar

Work of electrical connection for operation of pressure irrigation system invillage bardhawa (kakarhawa) and village dharamoli (lotan) under depostie scheme year 2024-25 under edd siddharthanagar

Read more
Renovation of delivery to 1st distribution chamber and extension of p.v.c. pipe line and construction of 1 spout chamber at natun boga-i

Renovation of delivery to 1st distribution chamber and extension of p.v.c. pipe line and construction of 1 spout chamber at natun boga-i rli scheme under balagarh (agri-mech.) sub-division under chinsurah (a-m) division under core sector programme

Read more
Construction execution of micro irrigation scheme for sonegaon stage i rd 20580 m on wadala branch of mokhabardi lift irrigation scheme for irrigation of 1718 ha. culturable command area (cca) with pipe distribution network and micro irrigation syste

Construction execution of micro irrigation scheme for sonegaon stage i rd 20580 m on wadala branch of mokhabardi lift irrigation scheme for irrigation of 1718 ha. culturable command area (cca) with pipe distribution network and micro irrigation syste

Read more
Amc for regular cleaning of impulse pipe line for accurate measurement and control of process parameters (line pressure and flow of producer gas) in different shops including gas plant in ffp

Amc for regular cleaning of impulse pipe line for accurate measurement and control of process parameters (line pressure and flow of producer gas) in different shops including gas plant in ffp

Read more
Appointment of third-party inspection agency (tpia) for construction of distribution system for 7171.77 ha. of cca including command area development (cad) of salandi left main canal from rd 40.927 km to 45.570 km through under ground pipe line irrig

Appointment of third-party inspection agency&amp#x0d (tpia) for&amp#x0d construction of distribution system for 7171.77 ha. of cca including command area development (cad) of salandi left main canal from rd 40.927 km to 45.570 km through ugpl

Read more
Construction of a staircase and periodical maintenance of muroli left and right canal

Construction of a staircase and periodical maintenance of muroli left and right canal for watering in kharif irrigation 2025 from month of july to november in block nayagram ps nayagram dist jhargram under jhargram fmp division during 2025 26

Read more
Third party audit of the bills produced by concessionaire m/s e-smart energy solution limited in the work of implementation of smart led street lights and centralized and monitoring system for ulbs under patiala region on esco model(pay from savings)

Third party audit of the bills produced by concessionaire m/s e-smart energy solution limited in the work of implementation of smart led street lights and centralized and monitoring system for ulbs under patiala region on esco model(pay from savings)

Read more
Work of construction of 02 nos. 132kv bays for making protection and metering system of 132kv maharajganj (220kv)-maharajganj (132kv) line bay and making of protection system of t.b.c. bay at 132kv s/s maharajganj under etd-ii, gorakhpur

Work of construction of 02 nos. 132kv bays for making protection and metering system of 132kv maharajganj (220kv)-maharajganj (132kv) line bay and making of protection system of t.b.c. bay at 132kv s/s maharajganj under etd-ii, gorakhpur

Read more
Providing services as third part inspection agency (tpia) by taking feedback, ensuring supervision for work of cleanliness and hygienic condition in toilets of 20 nos of sanitary complex at kawariya path, at kothia bus stand and at paritran bus stand

Providing services as third part inspection agency (tpia) by taking feedback, ensuring supervision for work of cleanliness and hygienic condition in toilets of 20 nos of sanitary complex at kawariya path, at kothia bus stand and at paritran bus stand

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise