Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Custom Bid For Services Round The Clock Manning And Operation Of Panel Operated Cabin Level Cross
|
| Description |
|
| Organisation | Contracts and Materials | Ministry of Power |
| Tender Id | GEM/2025/R/433380 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | 2 Crore |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | January 11, 2025 22:30 |
| End Date |
Expired
13/01/2025
Expired 637 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
NIYURA TECHNOLOGIES PRIVATE LIMITEDNEXTGENT T TRADING COMPANYGLOBAL LINK TRADERS...
Ordered Items & Contract Pricing
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| BPE 650VA | BPE | BPE 650VA | 2 | ₹ 3216.000 |
| DLINK SWITCH 8 PORT | D-Link | DES-1008C 10/100 Mbps Unmanaged Switch Network Switch | 6 | ₹ 4974.000 |
| RICOH Toner type 1230D Black | RICOH | RICOH Toner type 1230D Black | 5 | ₹ 21905.000 |
| HP 12A Black Original LaserJet Toner Cartridge Q2612AC | hp | HP 12A Black Original LaserJet Toner Cartridge Q2612AC | 10 | ₹ 42650.000 |
| FEVICOL SQUEEZY BOTTLE 200 gm | Fevicol | NAT-FEVICOL SQUEEZY BOTTLE 200 gm -A-I | 300 | ₹ 20250.000 |
| Luminous PC 18042 - 150AH Tubular Battery | LUMINOUS | Luminous PC 18042 - 150AH Tubular Battery with 42* months warrenty | 1 | ₹ 13850.000 |
| Nanochecker 710 | NANOCHECKER 710 | Nanochecker 710 | 1 | ₹ 349000.000 |
| JK | J K | Jk Easy Copier | 300 | ₹ 48897.000 |
| Lotus Eazy Ruled Register Hard Bound 96 Page 180 x 295 mm | LOTUS | Lotus Eazy 96 PAGES | 30 | ₹ 1080.000 |
| jungle boot direct moulded pu sole in pairs | Sk | SK | 13 | ₹ 4550.000 |
| Samsungtonercartridge MLT-D101S | SAMSUNG | MLT-D101S | 20 | ₹ 35900.000 |
| Notebook Computers-Laptop | Lenovo | Lenovo Notebook V110-i3 6th gen processor, 4GB RAM, 1TB HDD, 15.6" ,Win10pro,3 yrs | 5 | ₹ 165000.000 |
| Electronic Weighing Scale - Capacity 20 kg, Accuracy 5 g | PHOENIX | SMART-20 | 9 | ₹ 31500.000 |
| VIM SOAP | Vim | VIM SOAP | 50 | ₹ 1000.000 |
| spectra FS paper | Trident Paper FS | spectra FS 75 gsm | 100 | ₹ 21000.000 |
| COPIER PAPER A4 75 GSM CT | Trident | TRIDENT SPECTRA | 100 | ₹ 17550.000 |
| Bajaj Faratta 500mm Grey Pedestal Fan | BAJAJ | Bajaj Faratta 500mm Grey Pedestal Fan | 2 | ₹ 6599.980 |
| WONDER TAPE 2" 35 MTR TRASPARENT TAPE | wonder | WONDER TAPE 2" 35 MTR TRASPARENT TAPE | 100 | ₹ 2200.000 |
| HP LaserJet Pro P1108 Printer | hp | HP LaserJet Pro P1108 | 2 | ₹ 17600.000 |
| Rubber Gloves | NA | Rubber Gloves | 100 | ₹ 5900.000 |
Manning,operation and maintenance of ph-iii 150 mld water treatment plant at peddapur for the period of one year under peddapur section, sd-ii peddapur, transmission division-ii, patancheru.
Manning,operation and maintenance of ph-iii 150 mld water treatment plant at peddapur for the period of one year under peddapur section, sd-ii peddapur, transmission division-ii, patancheru.
Read moreOperation & maintenance of part i: fixed operation of i.) rural piped water supply scheme (pws), ii.) single village piped water supply schemes (svs), iii.) ward level piped water supply schemes in quality affected wards (wls_quality), iii.) ward level piped water supply schemes in non quality affected wards (wls_non quality) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive operation & maintenance of i.) rural piped water supply scheme (pws)
Operation & maintenance of part i: fixed operation of i.) rural piped water supply scheme (pws), ii.) single village piped water supply schemes (svs), iii.) ward level piped water supply schemes in quality affected wards (wls_quality), iii.) ward level piped water supply schemes in non quality affected wards (wls_non quality) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive operation & maintenance of i.) rural piped water supply scheme (pws), ii.) single village piped water supply schemes (svs), iii.) ward level piped water supply schemes in quality affected wards (wls_quality) iv.) ward level piped water supply schemes in non quality affected wards (wls_non quality) , i.e. the cost of chemicals, overhauling of filter media and related appurtenances, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, boundary wall, repair of leakages in distribution line, repair and provision of new fhtcs, repair and maintenance of pumps and other electromechanical components etc. all complete as per the directions of engineer-in-charge. in blocks:- 08 total no. of schemes: 280 wls(non quality): 226 wls(quality): 05 pws (non quality): 35 svs (non quality): 14
Read moreSitc of transformer (750 kva), ht & lt panel and cable, apfc (capacitor) panel, wiring and shifting of existing 320 kva dg at new s/s beside the cm secretariat, along with operation & maintenance for five years in the campus of 4 no. deshratan marg (4 kga), patna, bihar
Sitc of transformer (750 kva), ht & lt panel and cable, apfc (capacitor) panel, wiring and shifting of existing 320 kva dg at new s/s beside the cm secretariat, along with operation & maintenance for five years in the campus of 4 no. deshratan marg (4 kga), patna, bihar
Read moreConducting detailed survey including preliminary investigation, net level survey, taking longitudinal sections and cross sections along the alignment and detailed final survey including preparation of designs, drawings and estimates of distributory network including minors or sub-minors or field channels by conducting detailed block level survey for an extent 35,220 acres to identify a minimum net ayacut of 29,937 acres by proposing a ph at pragallapalli village, dummugudem mandal of bhadradri
Conducting detailed survey including preliminary investigation, net level survey, taking longitudinal sections and cross sections along the alignment and detailed final survey including preparation of designs, drawings and estimates of distributory network including minors or sub-minors or field channels by conducting detailed block level survey for an extent 35,220 acres to identify a minimum net ayacut of 29,937 acres by proposing a ph at pragallapalli village, dummugudem mandal of bhadradri kothagudem district on left bank of sitamma sagar multi purpose project.(2nd call)
Read moreGr no-01 comprehensive operation and maintenance, routine repairs and special repairs of i.) rural piped water supply scheme (pws-10 schemes), ii.) ward level piped water supply schemes in quality affected wards (wls_quality-70 schemes) and iii.) ward level piped water supply schemes in non quality affected wards(wls_non quality-359 schemes) based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bills for five years.
Gr no-01 comprehensive operation and maintenance, routine repairs and special repairs of i.) rural piped water supply scheme (pws-10 schemes), ii.) ward level piped water supply schemes in quality affected wards (wls_quality-70 schemes) and iii.) ward level piped water supply schemes in non quality affected wards(wls_non quality-359 schemes) based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bills for five years.
Read moreOperation of piped water supply schemes by deploying pump operators and payment of electricity charges and comprehensive operation and maintenance, routine repairs and special repairs of rural piped water supply scheme (pws) and ward level piped water supply schemes in non quality affected wards (wls_non quality) i/c the cost of chemicals, overhauling of filter media and related appurtenances, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, staff quarters, boundary
Operation of piped water supply schemes by deploying pump operators and payment of electricity charges and comprehensive operation and maintenance, routine repairs and special repairs of rural piped water supply scheme (pws) and ward level piped water supply schemes in non quality affected wards (wls_non quality) i/c the cost of chemicals, overhauling of filter media and related appurtenances, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, staff quarters, boundary wall, repair of leakages in distribution line, repair and provision of new fhtcs, repair and maintenance of pumps and other electromechanical components etc. all complete as per the directions of engineer-in-charge.
Read morePart i: fixed operation of ward level piped water supply schemes (nq/ q affected/pws) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive maintenance of ward level water supply schemes (nq/ q affected/pws), i/c the cost of chemicals, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, boundary wall, repair of leakages in distribution line, repair and provision of new fhtcs, repair and maintenance of pumps and other electr
Part i: fixed operation of ward level piped water supply schemes (nq/ q affected/pws) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive maintenance of ward level water supply schemes (nq/ q affected/pws), i/c the cost of chemicals, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, boundary wall, repair of leakages in distribution line, repair and provision of new fhtcs, repair and maintenance of pumps and other electromechanical components etc. all complete as per the directions of engineer-in-charge. in different block in darbhanga. fy-26-27 no. of schemes: -60 wls(non quality):- 26 wls(quality): - 16 pws : -18
Read moreComprehensive operation and maintenance and special repair of 110 nos ward level piped water supply schemes (non quality) & 16 nos pws scheme based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bill for five years. no. of schemes: wls(non quality): 110 pws(non quality): 16 p h division jhanjharpur
Comprehensive operation and maintenance and special repair of 110 nos ward level piped water supply schemes (non quality) & 16 nos pws scheme based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bill for five years. no. of schemes: wls(non quality): 110 pws(non quality): 16 p h division jhanjharpur
Read moreCustom bid for services - round the clock manning and operation of panel operated cabin level cross
Read more
Annual contract for round the clock operation of panel cabin at bktpp in plant yard for 2 years
Annual contract for round the clock operation of panel cabin at bktpp in plant yard for 2 years
Read moreof your Industry type