Tender Details
About Tender
🛣️ Invitation For Bids: Steel View Cutter Installation On Flyover 🛠️ The National Highways Authority Of India (Nhai) Is Seeking Bids From Experienced Contractors For The Installation Of A Steel View Cutter On A Flyover At Chainage 50.000 Km On The Patiala Bypass Section Of Nh64 (New Nh07) In The State Of Punjab. This Is The Second Call For Bids On This Project. 📅 Bid Submission Deadline: July 15, 2024, 11:00 Am Tender Fee: Inr 10,000 Earnest Money Deposit (Emd): Inr 6,50,000 Interested Bidders Must Have A Proven Track Record In Similar Infrastructure Projects And Should Submit Detailed Bids, Including Technical Specifications, Methodology, And Financial Proposals, By The Stipulated Deadline. Keywords: Nhai, Steel View Cutter, Flyover Installation, Infrastructure Project, Highway Construction, Punjab, Bid Submission, Tender, EmdParticulars | Details |
---|---|
Title |
Installation Of Steel View Cutter On Flyover At Chainage 50.000 Km On Patiala Bypass Section Of Nh64 (New Nh07) In The State Of Punjab (2nd Call)
|
Description |
Installation Of Steel View Cutter On Flyover At Chainage 50.000 Km On Patiala Bypass Section Of Nh64 (New Nh07) In The State Of Punjab (2nd Call)
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id | 2024_NHAI_199752_1 |
Reference Number |
NHAI/PIU/CHD/NH7/VIEWCUTTER/2 |
Tender Fee | 10000 |
EMD | 65000 |
Tender Value | |
Place | PATIALA |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=218662 |
Start Date | June 28, 2024 23:30 |
End Date |
15/07/2024 ( Expired 328 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreWidening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Read moreConstruction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreConsultancy services for preparation of dpr and land acquisition of gangakhed city bypass 4lane ps configuration road on nh361f connecting to nh361f km at 17.650 to km 33.400 and nh 752k in gangakhed taluka district parbhani in the state of maharas
Consultancy services for preparation of dpr and land acquisition of gangakhed city bypass 4lane ps configuration road on nh361f connecting to nh361f km at 17.650 to km 33.400 and nh 752k in gangakhed taluka district parbhani in the state of maharas
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreIe services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)
Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)
Read moreCs for supervision of 4 lane raniganj bypass of length 5.261 km on nh 60 (new nh 14) from km 275.20 of nh 60 to km 478.18 of nh 02 (new nh 19) in paschim bardhaman west bengal in epc mode
Cs for supervision of 4 lane raniganj bypass of length 5.261 km on nh 60 (new nh 14) from km 275.20 of nh 60 to km 478.18 of nh 02 (new nh 19) in paschim bardhaman west bengal in epc mode
Read moreCurve improvements at km 41.500 on nh-69 black spot id ka 05 37 and construction of rcc culvert at km 35.600 on honnasagar section in the state karnataka on epc mode
Curve improvements at km 41.500 on nh-69 black spot id ka 05 37 and construction of rcc culvert at km 35.600 on honnasagar section in the state karnataka on epc mode
Read moreof your Industry type