Tender Details

Particulars Details
Title
Surveying Soil Investigation Design And Supply Of All Materials Labour T And P Etc Complete Required For Completion Of Following Works Of Extension Of Pipe Line Of Ghatampur Water Scheme On Turn Key Basis Construction Of Tube Well Over Head Tank Pump
Description
Surveying Soil Investigation Design And Supply Of All Materials Labour T And P Etc Complete Required For Completion Of Following Works Of Extension Of Pipe Line Of Ghatampur Water Scheme On Turn Key Basis Construction Of Tube Well Over Head Tank Pump
Organisation Government of Uttar Pradesh
Tender Id 2023_UPJNM_860842_1
Reference
Number
625/AC-7/122 Dated 07.11.2023
Tender Fee 11800
EMD 10 Lakh
Tender Value
Place EE CD Second UPJN U Fazalganj Kanpur
Link https://etender.up.nic.in
Start Date November 09, 2023 14:30
End Date

07/12/2023 ( Expired 522 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Survey, soil investigation, planning, designing, construction and obtaining all relevant permissions and required completion certificate from competent authority on lump-sum turn-key basis for construction of 768 mig t s on plot no r-1,add.midc,latur

Survey, soil investigation, planning, designing, construction and obtaining all relevant permissions and required completion certificate from competent authority on lump-sum turn-key basis for construction of 768 mig t s on plot no r-1,add.midc,latur

Read more
Investigation and survey on gis basis of the project area including soil investigation engineering design hydraulic and structural as required procurement of all labour and material t and p etc and construction of various components complete

Construction of 0.6 mld stp pumping station conveyance system and other associated sewerage works and drain works in patelpuram gaytri shaktipeeth, gomti nagar vistar sector1 district lucknow up india

Read more
Shifting and laying of water supply under cm grid programme including supply of all labour materials t and p etc complete

Shifting and laying of water supply under cm grid programme including supply of all labour materials t and p etc complete

Read more
Construction of tube well pump house over head tank laying and jointing rising main and distribution systems of hdpe and di pipes providing domestic connection with amr water meter of nayagaon hathibarkala water supply scheme under sasci programme

Construction of tube well pump house over head tank laying and jointing rising main and distribution systems of hdpe and di pipes providing domestic connection with amr water meter of nayagaon hathibarkala water supply scheme under sasci programme

Read more
Shifting and laying of water supply under cm grid programme including supply of all labour materials t and p etc complete

Shifting and laying of water supply under cm grid programme including supply of all labour materials t and p etc complete

Read more
Operation and maintenance of servo voltage stabilizer including supply of all material labour. t and p etc required for proper completion of work which has been installed at different tubwells of water supply scheme under ujs haldwani

Operation and maintenance of servo voltage stabilizer including supply of all material labour. t and p etc required for proper completion of work which has been installed at different tubwells of water supply scheme under ujs haldwani

Read more
Shifting and tube well pump house boundary wall works other works in itaura buzurg water supply scheme including survey design site investigation planning supply of all materials labour t p complete in all respect on turn key basis after compl

Shifting and tube well pump house boundary wall works other works in itaura buzurg water supply scheme including survey design site investigation planning supply of all materials labour t p complete in all respect on turn key basis after compl

Read more
Supplying all materials, labour, t and p and sinking of (125x100)mm dia tube wells through combination (dth-cum-rotary) drilling method with fast drilling rigs at different villages of chitrakonda block in malkangiri district under setu programme

Supplying all materials, labour, t and p and sinking of (125x100)mm dia tube wells through combination (dth-cum-rotary) drilling method with fast drilling rigs at different villages of chitrakonda block in malkangiri district under setu programme

Read more
Survey design supply of all materials labour etc. required for shifting of 300 mm, 450 mm 500 mm dia di water carrier pipe lines under the railway tracks (by trenchless method) at km 1316/12-13 in between banda-khairar jn district banda.

Survey design supply of all materials labour etc. required for shifting of 300 mm, 450 mm 500 mm dia di water carrier pipe lines under the railway tracks (by trenchless method) at km 1316/12-13 in between banda-khairar jn district banda.

Read more
Shifting of tube well pump house boundary wall works other work in existing water supply scheme including survey design site investigation planning supply of all materials labour t p complete in all respect on turn key basis after completi

Shifting of tube well pump house boundary wall works other work in existing water supply scheme including survey design site investigation planning supply of all materials labour t p complete in all respect on turn key basis after completi

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise