Tender Details
Particulars | Details |
---|---|
Title |
Surveying Soil Investigation Design And Supply Of All Materials Labour T And P Etc Complete Required For Completion Of Following Works Of Extension Of Pipe Line Of Ghatampur Water Scheme On Turn Key Basis Construction Of Tube Well Over Head Tank Pump
|
Description |
Surveying Soil Investigation Design And Supply Of All Materials Labour T And P Etc Complete Required For Completion Of Following Works Of Extension Of Pipe Line Of Ghatampur Water Scheme On Turn Key Basis Construction Of Tube Well Over Head Tank Pump
|
Organisation | Government of Uttar Pradesh |
Tender Id | 2023_UPJNM_860842_1 |
Reference Number |
625/AC-7/122 Dated 07.11.2023 |
Tender Fee | 11800 |
EMD | 10 Lakh |
Tender Value | |
Place | EE CD Second UPJN U Fazalganj Kanpur |
Link | https://etender.up.nic.in |
Start Date | November 09, 2023 14:30 |
End Date |
07/12/2023 ( Expired 522 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Survey, soil investigation, planning, designing, construction and obtaining all relevant permissions and required completion certificate from competent authority on lump-sum turn-key basis for construction of 768 mig t s on plot no r-1,add.midc,latur
Survey, soil investigation, planning, designing, construction and obtaining all relevant permissions and required completion certificate from competent authority on lump-sum turn-key basis for construction of 768 mig t s on plot no r-1,add.midc,latur
Read moreInvestigation and survey on gis basis of the project area including soil investigation engineering design hydraulic and structural as required procurement of all labour and material t and p etc and construction of various components complete
Construction of 0.6 mld stp pumping station conveyance system and other associated sewerage works and drain works in patelpuram gaytri shaktipeeth, gomti nagar vistar sector1 district lucknow up india
Read moreShifting and laying of water supply under cm grid programme including supply of all labour materials t and p etc complete
Shifting and laying of water supply under cm grid programme including supply of all labour materials t and p etc complete
Read moreConstruction of tube well pump house over head tank laying and jointing rising main and distribution systems of hdpe and di pipes providing domestic connection with amr water meter of nayagaon hathibarkala water supply scheme under sasci programme
Construction of tube well pump house over head tank laying and jointing rising main and distribution systems of hdpe and di pipes providing domestic connection with amr water meter of nayagaon hathibarkala water supply scheme under sasci programme
Read moreShifting and laying of water supply under cm grid programme including supply of all labour materials t and p etc complete
Shifting and laying of water supply under cm grid programme including supply of all labour materials t and p etc complete
Read moreOperation and maintenance of servo voltage stabilizer including supply of all material labour. t and p etc required for proper completion of work which has been installed at different tubwells of water supply scheme under ujs haldwani
Operation and maintenance of servo voltage stabilizer including supply of all material labour. t and p etc required for proper completion of work which has been installed at different tubwells of water supply scheme under ujs haldwani
Read moreShifting and tube well pump house boundary wall works other works in itaura buzurg water supply scheme including survey design site investigation planning supply of all materials labour t p complete in all respect on turn key basis after compl
Shifting and tube well pump house boundary wall works other works in itaura buzurg water supply scheme including survey design site investigation planning supply of all materials labour t p complete in all respect on turn key basis after compl
Read moreSupplying all materials, labour, t and p and sinking of (125x100)mm dia tube wells through combination (dth-cum-rotary) drilling method with fast drilling rigs at different villages of chitrakonda block in malkangiri district under setu programme
Supplying all materials, labour, t and p and sinking of (125x100)mm dia tube wells through combination (dth-cum-rotary) drilling method with fast drilling rigs at different villages of chitrakonda block in malkangiri district under setu programme
Read moreSurvey design supply of all materials labour etc. required for shifting of 300 mm, 450 mm 500 mm dia di water carrier pipe lines under the railway tracks (by trenchless method) at km 1316/12-13 in between banda-khairar jn district banda.
Survey design supply of all materials labour etc. required for shifting of 300 mm, 450 mm 500 mm dia di water carrier pipe lines under the railway tracks (by trenchless method) at km 1316/12-13 in between banda-khairar jn district banda.
Read moreShifting of tube well pump house boundary wall works other work in existing water supply scheme including survey design site investigation planning supply of all materials labour t p complete in all respect on turn key basis after completi
Shifting of tube well pump house boundary wall works other work in existing water supply scheme including survey design site investigation planning supply of all materials labour t p complete in all respect on turn key basis after completi
Read moreof your Industry type