Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Aden(works)bvp: Construction Of Precast Wall For Prion Of Encroachment At Mddti Hostel. (740.0 Rm)
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 79077584 |
|
Reference Number |
172-2024-25 |
| Tender Fee | 0 |
| EMD | 1.84 Lakh |
| Tender Value | - |
| Place | Mumbai |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/012025/79077584/viewNitPdf_4809374.pdf |
| Start Date | December 27, 2024 00:55 |
| End Date |
Expired
17/01/2025
Expired 638 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Sw-i-construction of new side drains by replacing damaged unserviceable drains- under aden/awb s jurisdiction(total qty=3200 rm) ).(irpsm id11.04.31.25.4.53.006)sw-ii-construction of new side drains by replacing damaged unserviceable drains- under aden/j s jurisdiction.(total qty=4800 rm).( irpsm id 11.04.31.25.4.53.003)sw-iii- construction of new side drains by replacing damaged unserviceable drains- under sse/pway /hnl under aden/pau s jurisdiction.( total qty=4800 rm).( irpsm
Sw-i-construction of new side drains by replacing damaged unserviceable drains- under aden/awb s jurisdiction(total qty=3200 rm) ).(irpsm id11.04.31.25.4.53.006)sw-ii-construction of new side drains by replacing damaged unserviceable drains- under aden/j s jurisdiction.(total qty=4800 rm).( irpsm id 11.04.31.25.4.53.003)sw-iii- construction of new side drains by replacing damaged unserviceable drains- under sse/pway /hnl under aden/pau s jurisdiction.( total qty=4800 rm).( irpsm
Read moreOhe modification work in connection with replacement of existing steel girder by precast psc slab under aden (an) jurisdiction (total 70 spans) in udhna-jalgaon section of mumbai division.
Ohe modification work in connection with replacement of existing steel girder by precast psc slab under aden (an) jurisdiction (total 70 spans) in udhna-jalgaon section of mumbai division.
Read moreCreating openings at the corridor ends of gargi hostel blocks with precast concrete jali, providing drainage system for water coolers with repair of base, installation of collapsible gates in the basement of hostel blocks, replacement of damaged wood
As per tender document
Read moreWork-a provision of changing rooms, tiffin rooms and separate toilets for women employees in various offices at pa-lnl section under aden/lnl(pw-id-01046425353010). work b-shivajinagar improvement of hostel at svjr under pa-lnl section under aden/lnl(pw-id 01046425353009). work c-khadki improvement to road, circulating area, watering facility at khadki track machine depot under aden(s) lnl pw-id 01.04.64.25.3.53.012.
Work-a provision of changing rooms, tiffin rooms and separate toilets for women employees in various offices at pa-lnl section under aden/lnl(pw-id-01046425353010). work b-shivajinagar improvement of hostel at svjr under pa-lnl section under aden/lnl(pw-id 01046425353009). work c-khadki improvement to road, circulating area, watering facility at khadki track machine depot under aden(s) lnl pw-id 01.04.64.25.3.53.012.
Read moreSw-i:-secunderabad division - bpq-kzj sections: widening/repair of cess ,filling up of low lying areas near toe of bank , providing toe bank, & precast / cast insitu rcc central drain & cross drain hdpe pipe through the railway formation at a required depth to the required slope etc. for a total length of 7.93kms. in sse/p.way/magh&mci section under aden/bpa & aden/rdm sub-division. sw-ii:-bpq - kzj section: cutting the slopes to avoid loose earth filling inside drains and bloc
Sw-i:-secunderabad division - bpq-kzj sections: widening/repair of cess ,filling up of low lying areas near toe of bank , providing toe bank, & precast / cast insitu rcc central drain & cross drain hdpe pipe through the railway formation at a required depth to the required slope etc. for a total length of 7.93kms. in sse/p.way/magh&mci section under aden/bpa & aden/rdm sub-division. sw-ii:-bpq - kzj section: cutting the slopes to avoid loose earth filling inside drains and bloc
Read moreConstruction of boundary wall for prion of encroachment and cro at nno & ghe in the section of aden/rok.
For complete deion and other details, please refer to tender
Read moreKanpur-central: - construction of new hostel building of 100 bed capacity at mddti/cnb under aden/hq/ii/cnb.
For complete deion and other details, please refer to tender
Read moreRm to training hostel
R/m to training hostel at&#x0d power house colony,&#x0d ukhep, bariniput and&#x0d electrical re-installation&#x0d to the training hostel&#x0d quarter no. f-54/1, f-&#x0d 54/2, f-54/3, f-54/4, f-&#x0d 55/1, f-55/2, f-55/3, f-&#x0d 55/4 at power house&#x0d colony, ukhep,&#x0d bariniput
Read more(1) at kir (mddti) construction of new hostel building 50 bedded capacity for boys and construction of model room. (2) at katihar (mddti):- construction of new hostel building 25 bedded capacity for girls and construction of model room.
For complete deion and other details, please refer to tender
Read moreof your Industry type