Tender Details

Particulars Details
Title
Non Comprehensive Maintenance Contract For 4nos. Of Rapid Loading System At New Silo, Bocp For A Period Of 365days As Per The Instruction Of Engineer In Charge.
Description
Non Comprehensive Maintenance Contract For 4nos. Of Rapid Loading System At New Silo, Bocp For A Period Of 365days As Per The Instruction Of Engineer In Charge.
Organisation Mahanadi Coalfields Limited | Public Sector Undertakings
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 0
EMD 35400
Tender Value
Place NEW SILO, BHARATPUR OCP
Link

AAAAAAAAAA

Login to view
Start Date April 23, 2025 15:30
End Date

05/05/2025 ( 11 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
All inclusive comprehensive maintenance contract aicmc of zero b make ro systems installed in new atc tower cum technical block at s.v. airport, raipur, for 03 years.

All inclusive comprehensive maintenance contract aicmc of zero b make ro systems installed in new atc tower cum technical block at s.v. airport, raipur, for 03 years.

Read more
Procurement of 3.3kv, 750kva stationery diesel generator complete for 300kw motor of main mechanical ventilator as per statute at kpug mine, manuguru area with comprehensive maintenance contract (cmc) for a period of 2 years commencing after the initial warranty period

Procurement of 3.3kv, 750kva stationery diesel generator complete for 300kw motor of main mechanical ventilator as per statute at kpug mine, manuguru area with comprehensive maintenance contract (cmc) for a period of 2 years commencing after the initial warranty period

Read more
Awarding contract for deployment of 7.5 kva mobile lighting generators with light fitting and bulbs for illumination as per dgms standards on hire basis at pkoc, manugurur area for a period of 2 years - reg.

Awarding contract for deployment of 28 nos. of 7.5 kva mobile lighting generators with light fitting and bulbs for illumination as per dgms standards on hire basis at pkoc, manugurur area for a period of 2 years - reg.

Read more
Design, engineering, sitc of 6.0 mw wind farm on epc mode at vocpa, tuticorin along with civil works and power evacuation system to be connected with grid as per discom norms including comprehensive o and m for 11yrs with 02 yrs guarantee period

Design, engineering, sitc of 6.0 mw wind farm on epc mode at vocpa, tuticorin along with civil works and power evacuation system to be connected with grid as per discom tnpdcl norms including comprehensive oand m for 11yrs with 02yrs guarantee period

Read more
Biennial rate contract for outsourcing of removal refitment fabrication repair and cold insulation of ventilation ducting trunking for the hvac system at naval dockyard vizag and hindustan shipyard ltd vizag as per scope of work

Biennial rate contract for outsourcing of removal refitment fabrication repair and cold insulation of ventilation ducting trunking for the hvac system at naval dockyard vizag and hindustan shipyard ltd vizag as per scope of work

Read more
Design, supply, installation, commissioning, operation and maintenance of medical gas pipeline system at new covid building in coochbehar mjnmch of west bengal for 3 years

Design, supply, installation, commissioning, operation and maintenance of medical gas pipeline system at new covid building in coochbehar mjnmch of west bengal for 3 years

Read more
Non comprehensive maintenance contract for 4nos. of rapid loading system at new silo, bocp for a period of 365days as per the instruction of engineer in-charge.

Non comprehensive maintenance contract for 4nos. of rapid loading system at new silo, bocp for a period of 365days as per the instruction of engineer in-charge.

Read more
Non-comprehensive maintenance of water mist type automatic fire fighting system 2 bays installed at nimkar marg rss for the period of 3 years

Non-comprehensive maintenance of water mist type automatic fire fighting system 2 bays installed at nimkar marg rss for the period of 3 years

Read more
Work contract for comprehensive annual maintenance contract for micro controller based digital axle er (oem- eldyne) installed in sandt system at sstpp, mppgcl, khandwa (m.p.)

Work contract for comprehensive annual maintenance contract for micro controller based digital axle er (oem- eldyne) installed in sandt system at sstpp, mppgcl, khandwa (m.p.)

Read more
Arc for the services of 1 no. hydra for carrying out loading, unloading, shifting, stacking of material in stores for 900 hours as per requirement for a period of 02 year.

Arc for the services of 1 no. hydra for carrying out loading, unloading, shifting,&amp#x0d stacking of material in stores for 900 hours as per requirement for a period of 02 year.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise