Tender Details
Particulars | Details |
---|---|
Title |
Non Comprehensive Maintenance Contract For 4nos. Of Rapid Loading System At New Silo, Bocp For A Period Of 365days As Per The Instruction Of Engineer In Charge.
|
Description |
Non Comprehensive Maintenance Contract For 4nos. Of Rapid Loading System At New Silo, Bocp For A Period Of 365days As Per The Instruction Of Engineer In Charge.
|
Organisation | Mahanadi Coalfields Limited | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 35400 |
Tender Value | |
Place | NEW SILO, BHARATPUR OCP |
Link |
AAAAAAAAAA Login to view |
Start Date | April 23, 2025 15:30 |
End Date |
05/05/2025 ( 11 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
All inclusive comprehensive maintenance contract aicmc of zero b make ro systems installed in new atc tower cum technical block at s.v. airport, raipur, for 03 years.
All inclusive comprehensive maintenance contract aicmc of zero b make ro systems installed in new atc tower cum technical block at s.v. airport, raipur, for 03 years.
Read moreProcurement of 3.3kv, 750kva stationery diesel generator complete for 300kw motor of main mechanical ventilator as per statute at kpug mine, manuguru area with comprehensive maintenance contract (cmc) for a period of 2 years commencing after the initial warranty period
Procurement of 3.3kv, 750kva stationery diesel generator complete for 300kw motor of main mechanical ventilator as per statute at kpug mine, manuguru area with comprehensive maintenance contract (cmc) for a period of 2 years commencing after the initial warranty period
Read moreAwarding contract for deployment of 7.5 kva mobile lighting generators with light fitting and bulbs for illumination as per dgms standards on hire basis at pkoc, manugurur area for a period of 2 years - reg.
Awarding contract for deployment of 28 nos. of 7.5 kva mobile lighting generators with light fitting and bulbs for illumination as per dgms standards on hire basis at pkoc, manugurur area for a period of 2 years - reg.
Read moreDesign, engineering, sitc of 6.0 mw wind farm on epc mode at vocpa, tuticorin along with civil works and power evacuation system to be connected with grid as per discom norms including comprehensive o and m for 11yrs with 02 yrs guarantee period
Design, engineering, sitc of 6.0 mw wind farm on epc mode at vocpa, tuticorin along with civil works and power evacuation system to be connected with grid as per discom tnpdcl norms including comprehensive oand m for 11yrs with 02yrs guarantee period
Read moreBiennial rate contract for outsourcing of removal refitment fabrication repair and cold insulation of ventilation ducting trunking for the hvac system at naval dockyard vizag and hindustan shipyard ltd vizag as per scope of work
Biennial rate contract for outsourcing of removal refitment fabrication repair and cold insulation of ventilation ducting trunking for the hvac system at naval dockyard vizag and hindustan shipyard ltd vizag as per scope of work
Read moreDesign, supply, installation, commissioning, operation and maintenance of medical gas pipeline system at new covid building in coochbehar mjnmch of west bengal for 3 years
Design, supply, installation, commissioning, operation and maintenance of medical gas pipeline system at new covid building in coochbehar mjnmch of west bengal for 3 years
Read moreNon comprehensive maintenance contract for 4nos. of rapid loading system at new silo, bocp for a period of 365days as per the instruction of engineer in-charge.
Non comprehensive maintenance contract for 4nos. of rapid loading system at new silo, bocp for a period of 365days as per the instruction of engineer in-charge.
Read moreNon-comprehensive maintenance of water mist type automatic fire fighting system 2 bays installed at nimkar marg rss for the period of 3 years
Non-comprehensive maintenance of water mist type automatic fire fighting system 2 bays installed at nimkar marg rss for the period of 3 years
Read moreWork contract for comprehensive annual maintenance contract for micro controller based digital axle er (oem- eldyne) installed in sandt system at sstpp, mppgcl, khandwa (m.p.)
Work contract for comprehensive annual maintenance contract for micro controller based digital axle er (oem- eldyne) installed in sandt system at sstpp, mppgcl, khandwa (m.p.)
Read moreArc for the services of 1 no. hydra for carrying out loading, unloading, shifting, stacking of material in stores for 900 hours as per requirement for a period of 02 year.
Arc for the services of 1 no. hydra for carrying out loading, unloading, shifting,&#x0d stacking of material in stores for 900 hours as per requirement for a period of 02 year.
Read moreof your Industry type