Tender Details
Particulars | Details |
---|---|
Title |
Preparatory Job For Carrying Out Hot Joints In Steel Cord Conveyor Belts And Replacement Of Steel Cord Belt In The Conveyors As And When Required For A Period Of 365days At New Silo, Bocp.
|
Description |
Preparatory Job For Carrying Out Hot Joints In Steel Cord Conveyor Belts And Replacement Of Steel Cord Belt In The Conveyors As And When Required For A Period Of 365days At New Silo, Bocp.
|
Organisation | Mahanadi Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_MCL_323326_1 |
Reference Number |
MCL/BA/EnM/e-Tender/242570 Dated 13.12.2024 |
Tender Fee | 0 |
EMD | 38600 |
Tender Value | |
Place | BHARATPUR OCP |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=335143 |
Start Date | December 14, 2024 15:30 |
End Date |
24/12/2024 ( Expired 117 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Annual rate contract for carrying out tube leakage rectification of service boiler of cpp, as and when required basis for a period of one year
Annual rate contract for carrying out tube leakage rectification of service
 boiler of cpp, as and when required basis for a period of one year
Read moreAnnual rate contract for attending hot insulation with fixing of new aluminium sheets in various positions of boiler, pipeworks, vessels, valves etc. as and when required basis for a period of one year
Annual rate contract for attending hot insulation with fixing of new aluminium sheets in various positions of
 boiler, pipeworks, vessels, valves etc. as and when required basis for a period of one year
Read moreCross jointing and 100 mtr longitudinal joint by hot vulcanizing process in steel cord belting st-630 or equivalent (1200 mm width) in c1,c2,c3,c4 and st 1000 or equivalent 1400 mm width c5, c6 conveyor for a period of 01 year (365 days) of chhal sil
Cross jointing and 100 mtr longitudinal joint by hot vulcanizing process in steel cord belting st-630 or equivalent (1200 mm width) in c1,c2,c3,c4 and st 1000 or equivalent 1400 mm width c5, c6 conveyor for a period of 01 year (365 days) of chhal sil
Read moreCarrying out the structural steel work in all sections of chp, bina project (ncl) on as and when required basis within 730 days.
Carrying out the structural steel work in all sections of chp, bina project (ncl) on as and when required basis within 730 days.
Read moreCarrying out supply and application of hot and cold insulation on pipelines and equipments as per standard specification by providing all required materials in connection with the composite work for utilities and offsites part b project of m/s iocl
Carrying out supply and application of hot and cold insulation on pipelines and equipments as per standard specification by providing all required materials in connection with the composite work for utilities and offsites part b project of m/s iocl
Read moreOutsourcing of services for hot and cold vulcanization of steel cord and epfr belts and rubber lagging of pulleys on conveyors working at rgoc2 on rate contract basis for a period of 2 years
Outsourcing of services for hot and cold vulcanization of steel cord and epfr belts and rubber lagging of pulleys on conveyors working at rgoc2 on rate contract basis for a period of 2 years
Read moreReplacement of damaged conveyor belting piece at different belt conveyors under section-v as and when required at moonidih coal washery.
Replacement of damaged conveyor belting piece at different belt conveyors under section-v as and when required at moonidih coal washery.
Read moreOutsourcing of the rubber lagging for conveyor drums and hot vulcanizing joints, patch works for steel cord belt working at pvk5 inc, kothagudem area for a period of 2 years
Outsourcing of the rubber lagging for conveyor drums and hot vulcanizing joints, patch works for steel cord belt working at pvk5 inc, kothagudem area for a period of 2 years
Read moreConveyor belt health monitoring using magnetic flux leakage scanner/equipment and physical auditing/inspection of one steel-cord conveyor on half yearly basis for a period of one year at chp of nigahi project
Conveyor belt health monitoring using magnetic flux leakage scanner/equipment and physical auditing/inspection of one steel-cord conveyor on half yearly basis for a period of one year at chp of nigahi project
Read moreRepairing of rubber lagging by 16mm diamond grooved and plain rubber sheet including materials, hot patch of steel cord conveyor belt of 1600mm and 1800mm using hot vulcanizing for a period of one year at new silo, bocp
Repairing of rubber lagging by 16mm diamond grooved and plain rubber sheet including materials, hot patch of steel cord conveyor belt of 1600mm and 1800mm using hot vulcanizing for a period of one year at new silo, bocp
Read moreof your Industry type