Tender Details
Particulars | Details |
---|---|
Title |
Supply Of 75 Hp Three Phase Summer Submersible Pump Controller (With Single Phase Prer) (Line 05)
|
Description |
Supply Of 75 Hp Three Phase Summer Submersible Pump Controller (With Single Phase Prer)
|
Organisation | Directorate of Local Bos UP | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 472 |
EMD | 34000 |
Tender Value | |
Place | Chandausi |
Link |
AAAAAAAAAA Login to view |
Start Date | April 22, 2025 22:00 |
End Date |
12/05/2025 ( 19 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgradation of 219 hp sel water pump with 410 hp sel engine couple with rkb 200/37, 4 stage at garacharma treatment plant
Upgradation of 219 hp sel water pump with 410 hp sel engine couple with rkb 200/37, 4 stage at garacharma treatment plant
Read moreSitc of 127 hp sel engine with kirloskar rkb 125/27 pump
Sitc of 127 hp sel engine with kirloskar rkb 125/27 pump at chouldari dam
Read moreDesign, manufacture, supply, installation, testing and commissioning of automatic fare collection system (sle, sc and ccs) for phase-2a and 2b and integration with existing afc system
Design, manufacture, supply, installation, testing and commissioning of automatic fare collection system (sle, sc and ccs) for phase-2a and 2b and integration with existing afc system
Read moreManning for operation and maintenance of 185 mld narmada water supply project comprising intake well at hirani, water treatment plant at khatpura, bpt, ahmadpur pump house, mbsr and pipe line from hirani to mbsr.
Manning for operation and maintenance of 185 mld narmada water supply project comprising intake well at hirani, water treatment plant at khatpura, bpt, ahmadpur pump house, mbsr and pipe line from hirani to mbsr.
Read moreReplacement of panther conductor with htls conductor of 132 kv sitarganj pgcil eldeco sitarganj single circuit line and 132 kv sitarganj kichha single circuit line
Replacement of panther conductor with htls conductor of 132 kv sitarganj pgcil eldeco sitarganj single circuit line and 132 kv sitarganj kichha single circuit line
Read moreRepair replacement of old unsv rusted pipe line, pump, motor, cleaning of overhead tank and connected works of external water supply at borarupak i , ii and along mil stn and repair, maint, servicing to dg sets, lt panels and earthing at bora
Repair replacement of old unsv rusted pipe line, pump, motor, 
 cleaning of overhead tank and connected works of external water supply 
 at borarupak i , ii and along mil stn and repair, maint, servicing to dg sets, 
 lt panels and earthing at bora
Read moreSupply of 01 no 58.5 kva 3 phase diesel generator for samni terminal of dahej region.,supply of 05
Read more
Drilling of bore hole by dth combination rig of 200 mm dia supply and installation of energy efficient submersible pump sets panels cables and other allied works including comm and testing of tw in sub division todaraisingh under malpura
Drilling of bore hole by dth combination rig of 200 mm dia supply and installation of energy efficient submersible pump sets panels cables and other allied works including comm and testing of tw in sub division todaraisingh under malpura
Read moreDrilling of bore hole by dth combination rig of 200 mm dia supply and installation of energy efficient submersible pump sets panels cables and other allied works including comm and testing of tw in sub div malpura under jurisdiction malpura
Drilling of bore hole by dth combination rig of 200 mm dia supply and installation of energy efficient submersible pump sets panels cables and other allied works including comm and testing of tw in sub div malpura under jurisdiction malpura
Read moreConstruction of borewell with one number 35 hp submersible pump and 150 kl underground sump well for ntcda at btc itbp bhanu
Construction of borewell with one number 35 hp submersible pump and 150 kl
 underground sump well for ntcda at btc itbp bhanu
Read moreof your Industry type