Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Sr Of Bokariya Kevtan Link Road (Construction Cost For 05 Years Maintenance Including 15 Percent For Pc Work And 2.50 Pecent For Cc Work)
|
| Description |
Special Repair Work
|
| Organisation | Chief Engineer Mirzapur Zone PWD Mirzapur | State Govt. and UT |
| Tender Id | 2024_CEMRZ_977914_7 |
|
Reference Number |
4315/Nivida/2024-25 Dt. 25-11-2024 |
| Tender Fee | 950 |
| EMD | 68000 |
| Tender Value | - |
| Place | Mirzapur |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1718619 |
| Start Date | November 30, 2024 14:30 |
| End Date |
Expired
05/12/2024
Expired 679 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repair and maintenance contract for gps pc based oms machine for two years under sr den/ratnagiri section.
Repair and maintenance contract for gps pc based oms machine for two years under sr den/ratnagiri section.
Read moreConstruction of cc road for diversion of khaperkheda to parseoni sh no. 346 (ch. 9/560 to ch. 11/100) and stone pitching on embankment along with toe wall at singhori deep ocm under bssa(incl. maintenance of 05 years without any cost implications)
Construction of cc road for diversion of khaperkheda to parseoni sh no. 346 (ch. 9/560 to ch. 11/100) and stone pitching on embankment along with toe wall at singhori deep ocm under bssa(incl. maintenance of 05 years without any cost implications)
Read moreTrihexyphenidyl hcl 2 mg tab,tranexamic acid 500 mg per 5ml inj,diltiazem 60 mg tab,fenofibrate 200 mg tab,dobutamine hcl 250 mg 5 ml inj,prazosin 5 mg sustained release or slow release tab,bisoprolol 5 mg tab,metoprolol 12 point 5 mg tab,chlorhex mou zero point12per sugaalcohol free bott of 450 500ml bott,adapalene zero point 1 percent tube of 15 gm,tacrolimus oint zero point 03 percent 20g tube,clotrimazole cream 1 percent tube of 15 gm,desonide zero point 05 percent bott of 30 ml,minoxidil 5 percent lotion bott of 60 ml,silver sulphadiazine 1 percent cream wt by vol jar of 500 gms,dutasteride zero point 5mg tab,ursodeoxycholic acid 150mg tab,ademetionine 400mg tab,5 amino salicylic acid sr 1 point 2 g tab,bisacodyl 5 mg tab,ornidazole 500 mg plus ofloxacin 200 mg tab,thyroxine 50mcg tab,glycopyrrolate zero point 2 mg per ml 1ml inj,neostigmine zero point 5 mg 1 ml inj,betahistine dihydro chloride 8mg tab,ironpaedidroppointmlferrfumaconta 10 12 point 5 mgfolicacid vitb12bott15ml,alprazolam zero point 25 mg
Trihexyphenidyl hcl 2 mg tab,tranexamic acid 500 mg per 5ml inj,diltiazem 60 mg tab,fenofibrate 200 mg tab,dobutamine hcl 250 mg 5 ml inj,prazosin 5 mg sustained release or slow release tab,bisoprolol 5 mg tab,metoprolol 12 point 5 mg tab,chlorhex mou zero point12per sugaalcohol free bott of 450 500ml bott,adapalene zero point 1 percent tube of 15 gm,tacrolimus oint zero point 03 percent 20g tube,clotrimazole cream 1 percent tube of 15 gm,desonide zero point 05 percent bott of 30 ml,minoxidil 5 percent lotion bott of 60 ml,silver sulphadiazine 1 percent cream wt by vol jar of 500 gms,dutasteride zero point 5mg tab,ursodeoxycholic acid 150mg tab,ademetionine 400mg tab,5 amino salicylic acid sr 1 point 2 g tab,bisacodyl 5 mg tab,ornidazole 500 mg plus ofloxacin 200 mg tab,thyroxine 50mcg tab,glycopyrrolate zero point 2 mg per ml 1ml inj,neostigmine zero point 5 mg 1 ml inj,betahistine dihydro chloride 8mg tab,ironpaedidroppointmlferrfumaconta 10 12 point 5 mgfolicacid vitb12bott15ml,alprazolam zero point 25 mg
Read moreSr of devipur link road (construction cost for 05 years maintenance including 15 percent for pc work and 2.50 pecent for cc work)
Special repair work
Read moreSr of kharihat kala to pater link road (construction cost for 05 years maintenance including 15 percent for pc work and 2.50 pecent for cc work)
Special repair work
Read moreSr of kharahara to madhopur link road. (construction cost for 05 years maintenance including 15 percent for pc work and 2.50 percent for cc work)
Special repair work
Read moreSr of gadbad bagahiya kol basti link road (construction cost for 05 years maintenance including 15 percent for pc work)
Special repair work
Read moreSr of maharajganj to mahanandpur gegrawn matiyari link road. (construction cost for 05 years maintenance including 15 percent for pc work)
Special repair work
Read moreWidening and strengthening badi baghghanala vs road sh 5a to panchudih kajarahat via ammatola road (including 5 years maintenance upto 2.50 pecent of construction cost)
Widening and strengthening badi baghghanala vs road sh 5a to panchudih kajarahat via ammatola road (including 5 years maintenance upto 2.50 pecent of construction cost)
Read moreof your Industry type