Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚂 Invitation For Bids: Rob 1051/2 Approach Road Construction 🛠️ The Ministry Of Railways, Central Government, Invites Bids From Experienced Contractors For The Completion Of The Balance Work Of Rob 1051/2 Approach Road, Including The Supply, Fabrication, Erection, And Launching Of Steel Girders And Retaining Walls In The Sagar Makronia Section In Connection With The Bina Kte 3rd Line Project. 📅 Bid Submission Deadline: July 10, 2024, 3:00 Pm A Tender Fee Of Inr 417,500 Is Applicable As An Earnest Money Deposit (Emd). Interested Bidders Should Review The Complete Tender Documents For Detailed Specifications And Submission Guidelines. Keywords: Ministry Of Railways, Rob Construction, Approach Road, Steel Girder, Retaining Wall, Bina Kte 3rd Line Project, Government Tender, Emd, Tender Submission| Particulars | Details |
|---|---|
| Title |
Balance Work Of Rob 1051/2 Approach Road, Supply, Fabrication, Erection And Lunching Of Steel Girder, Retaining Wall In Sagar Makronia Section In Connection With Bina Kte 3rd Line Project.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 75750276 |
|
Reference Number |
BPL-C-II-BINA-KTE-05-2024 |
| Tender Fee | 0 |
| EMD | 4.18 Lakh |
| Tender Value | - |
| Place | Jabalpur |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/072024/75750276/viewNitPdf_4609814.pdf |
| Start Date | June 18, 2024 22:18 |
| End Date |
Expired
10/07/2024
Expired 829 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Read moreConstruction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Read moreBalance work of rob 1051/2 approach road, supply, fabrication, erection and lunching of steel girder, retaining wall in sagar makronia section in connection with bina-kte 3rd line project.
For complete deion and other details, please refer to tender
Read moreBalance work of rob 1051/2 approach road, supply, fabrication, erection and lunching of steel girder, retaining wall in sagar makronia section in connection with bina-kte 3rd line project.
For complete deion and other details, please refer to tender
Read moreTrd/ohe work for gw rob at km.1074 in connection with 3rd line in bina-kte section.
For complete deion and other details, please refer to tender
Read moreTrd/ohe work for gw rob at km.1074 in connection with 3rd line in bina-kte section.
For complete deion and other details, please refer to tender
Read moreStrengthening of bridge retaining wall embankment, toe wall etc. in between smrr-ish section in connection with bina-kte 3rd line project.
For complete deion and other details, please refer to tender
Read moreS&t work in connection with construction of rob in lieu of lc no. 21, 27 ,32,65,67,310a (kte-bina section) of jabalpur division. (telecom work)
For complete deion and other details, please refer to tender
Read moreLonda-vasco section: proposed construction of rob 1 x30 composite girder (railway portion) and 12x18.7m psc girder & retaining wall (approach portion), service road on both side of rob km.80/500-600 in lieu of lc no.19 between chandra goa and madgoa stations (composite work).
For complete deion and other details, please refer to tender
Read moreLonda-vasco section: proposed construction of rob 1 x30 composite girder (railway portion) and 12x18.7m psc girder & retaining wall (approach portion), service road on both side of rob km.80/500-600 in lieu of lc no.19 between chandra goa and madgoa stations (composite work).
For complete deion and other details, please refer to tender
Read moreof your Industry type