Tender Details
Particulars | Details |
---|---|
Title |
Rithal Narwal Link Drain (Out Falling In Dd 8) Bringing To Its Design Section From Rd 0 To 8350 (Including Constructing Pump House At Rd 8350 Of This Drain) And Laying Rcc Np 3 (1600 Mm Dia) Pipes From Rd 8350 To 11450 Of This Dr.
|
Description |
Rithal Narwal Link Drain (Out Falling In Dd 8) Bringing To Its Design Section From Rd 0 To 8350 (Including Constructing Pump House At Rd 8350 Of This Drain) And Laying Rcc Np 3 (1600 Mm Dia) Pipes From Rd 8350 To 11450 Of This Dr.
|
Organisation | Haryana Government | State Govt. and UT |
Tender Id | 2024_HRY_364130_1 |
Reference Number |
20249CA175FD 6274 4D23 B139 5AA3D321A461125IRR |
Tender Fee | 16180 |
EMD | 3.84 Lakh |
Tender Value | |
Place | RITHAL NARWAL RITHAL PHOGAT ANWALI GIWANA |
Link | https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=439703 |
Start Date | March 06, 2024 16:30 |
End Date |
11/03/2024 ( Expired 432 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Desilting hodi of gudhan link drain from rd 0 to 11450 outfalling at rd 13500-l bond disty.
Desilting hodi of gudhan link drain from rd 0 to 11450 outfalling at rd 13500-l bond disty.
Read moreBringing to design section ...
Estimate for bringing to design section of tributary drain no. 4 and reconstruction/construction of 7.5m wide vr bridge at rd 119200, rd 122870, rd 134500, and rd 146650 of try. drain no. 4 to protect the abadi from overflow of drain.
Read moreBringing to design section ...
Bringing to design section and making pucca lining of pathri drain from rd 20200 to 16000 to protect the abadi area from waste water in village pathri, pathri wali mata tirth and reconstruction/ construction of 02 no. bridge at rd 17900 and 18900 of
Read moreConstructing rcc box culvert from rd 5600 to 5860 of kheri sadh link drain crossing rohtak delhi road (near kainos hospital)
Constructing rcc box culvert from rd 5600 to 5860 of kheri sadh link drain crossing rohtak delhi road (near kainos hospital)
Read moreConstructing of rcc protection wall from rd 0 to 1265 right side of madina pump house link drain
Constructing of rcc protection wall from rd 0 to 1265 right side of madina pump house link drain
Read moreConstructing rcc trough from rd 19000 to 23400 of rithal-kiloi-mundhak link drain.
Constructing rcc trough from rd 19000 to 23400 of rithal-kiloi-mundhak link drain.
Read moreI/c of rithal kiloi mundhak link drain from rd 0 to 26000, i/c of mundhak sub link drain from rd 0 to 2200, i/c of rithal narwal sub link drain no. 1 from rd 0 to 2860, i/c of rithal narwal sub link drain no. 2 from rd 0 to 1100 and i/c of rithal pum
I/c of rithal kiloi mundhak link drain from rd 0 to 26000, i/c of mundhak sub link drain from rd 0 to 2200, i/c of rithal narwal sub link drain no. 1 from rd 0 to 2860, i/c of rithal narwal sub link drain no. 2 from rd 0 to 1100 and i/c of rithal pum
Read moreBringing to design section ...
Bringing to desigen section and strengthening of bank of main drain no 2 from rd 170000 and downwards.
Read moreConstructing underground rc...
Constructing underground rcc np2 pipe line drain for dewatering of flood/loged water in village shakar mandori from rd 6000 to 0 out falling at rd 40700/r gigorani disty.
Read moreConstructing underground rcc np2 pipeline drain for dewatering of flood water of village laluwal from rd 1560 to 0 linking with existing pipeline drain houdi at rd 6110 outfalling into rangoi nallah at rd 6.35 km left side
Constructing underground rcc np2 pipeline drain for dewatering of flood water of village laluwal from rd 1560 to 0 linking with existing pipeline drain houdi at rd 6110 outfalling into rangoi nallah at rd 6.35 km left side
Read moreof your Industry type