Tender Details
Particulars | Details |
---|---|
Title |
I/C Of Rithal Kiloi Mundhak Link Drain From Rd 0 To 26000, I/C Of Mundhak Sub Link Drain From Rd 0 To 2200, I/C Of Rithal Narwal Sub Link Drain No. 1 From Rd 0 To 2860, I/C Of Rithal Narwal Sub Link Drain No. 2 From Rd 0 To 1100 And I/C Of Rithal Pum
|
Description |
I/C Of Rithal Kiloi Mundhak Link Drain From Rd 0 To 26000, I/C Of Mundhak Sub Link Drain From Rd 0 To 2200, I/C Of Rithal Narwal Sub Link Drain No. 1 From Rd 0 To 2860, I/C Of Rithal Narwal Sub Link Drain No. 2 From Rd 0 To 1100 And I/C Of Rithal Pum
|
Organisation | Haryana Government | State Govt. and UT |
Tender Id | 2025_HRY_434234_1 |
Reference Number |
2025E2CC224D 43F0 4A5F AB93 8DEEEF125273125IRR |
Tender Fee | 1680 |
EMD | 6880 |
Tender Value | |
Place | RITHAL NARWAL RITHAL PHOGAT |
Link | https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=511414 |
Start Date | March 18, 2025 18:30 |
End Date |
25/03/2025 ( Expired 75 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read moreSupply and etc of 2 nos. 132 kv grid sub-stations at japanese zone (kotputli-behror) and chhawsri (jhunjhunu) along with associated lines (02 km d c, 15 km s c approx.) 02 no. 132kv bays at 220kv gss neemrana) under bn-9015002502.
Supply and etc of 2 nos. 132 kv grid sub-stations at japanese zone (kotputli-behror) and chhawsri (jhunjhunu) along with associated lines (02 km d c, 15 km s c approx.) 02 no. 132kv bays at 220kv gss neemrana) under bn-9015002502
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreConstruction of cc road from gandhi chowk to the drain and from gandhi chowk via patel house to kalam house to bajrang mandirat ward no. 04, sirali
Construction of cc road from gandhi chowk to the drain and from gandhi chowk via patel house to kalam house to bajrang mandirat ward no. 04, sirali
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreCs for preparation of detailed project report of capacity augmentation (from 2 to 4 lane) of (i) manoharpur dausa section and lalsot kothun section of nh 148/23 and (ii) salasar nagaur section of nh 58 in the state of rajasthan
Cs for preparation of detailed project report of capacity augmentation (from 2 to 4 lane) of (i) manoharpur dausa section and lalsot kothun section of nh 148/23 and (ii) salasar nagaur section of nh 58 in the state of rajasthan
Read moreWidening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Widening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Read moreConstruction of cc road and rcc drain from kishora to deepak sonkar house at ward no.12 nagar parishad ajaygarh distt.panna
Construction of cc road and rcc drain from kishora to deepak sonkar house at ward no.12 nagar parishad ajaygarh distt.panna
Read moreShort term maintenance to kanaka durga flyover from km. 0/000( 269/900) to km. 5/122 (275/022), missing link of nh-9 (new nh-65) i.e ., connecting nh-5 and nh-9 in (randb) nh division, vijayawada in the state of andhra pradesh
Short term maintenance to kanaka durga lyover from km.0/000( 269/900) to km.5/122(275/022), missing link of nh-9 (new nh-65) i.e ., connecting nh-5 and nh-9 in (randb) nh division, vijayawada in the state of andhra pradesh
Read moreSpl rep wks to bldg no b ts 24 of 11 sikhli and b lt from 1 to 13 and 22 total 14 at 19 sikhli spl rep of bldg b tp 19 2 9 gr baisakhi under ge 859 ews
Spl rep wks to bldg no b ts 24 of 11 sikhli and b lt from 1 to 13 and 22 total 14 at 19 sikhli spl rep of bldg b tp 19 2 9 gr baisakhi under ge 859 ews
Read moreof your Industry type