Tender Details

Particulars Details
Title
Construction Of Fpw Near The House Of Sh. Gh. Rasool (Bookseller At Halyan Nallah)
Description
Construction Of Fpw Near The House Of Sh. Gh. Rasool (Bookseller At Halyan Nallah)
Organisation Government of Jammu and Kashmir
Tender Id 2023_IFC_228474_7
Reference
Number
eNIT 08 of 2023-24 dated 02.09.2023
Tender Fee 500
EMD 3000
Tender Value -
Place Irrigation Division Bhaderwah
Link
View Original Tender Notice

https://jktenders.gov.in

Start Date September 02, 2023 22:30
End Date
Expired 16/09/2023

Expired 1122 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Providing road conductors to sh roads in mudigere and kalasa taluk

Providing road conductors to sh roads in mudigere and kalasa taluk

Read more
Design, supply, installation, testing, commissioning, configuration, system integration, operations and maintenance of etc system on near arwal-sahar bridge towards arwal, on sh-81 at gopalpur near chandi, on sh-81 at medinipur near nasriganj, on sh-102 near piro in the state of bihar, ara chapra bridge in the state of bihar.

Design, supply, installation, testing, commissioning, configuration, system integration, operations and maintenance of etc system on near arwal-sahar bridge towards arwal, on sh-81 at gopalpur near chandi, on sh-81 at medinipur near nasriganj, on sh-102 near piro in the state of bihar, ara chapra bridge in the state of bihar.

Read more
Selection of consultant for preparation of detailed project report (dpr) for construction, improvement and interlinking yogipur nallah, associated drainage and service drain network in patna, bihar

Selection of consultant for preparation of detailed project report (dpr) for construction, improvement and interlinking yogipur nallah, associated drainage and service drain network in patna, bihar

Read more
Providing road conductors for the maintenance of tarikere sh and mdr roads of tarikere sub division.

Providing road conductors for the maintenance of tarikere sh and mdr roads of tarikere sub division.

Read more
Selection of consultant for preparation of detailed project report (dpr) for construction, improvement and interlinking of badshahi nallah and associated drainage and service drain network in patna, bihar

Selection of consultant for preparation of detailed project report (dpr) for construction, improvement and interlinking of badshahi nallah and associated drainage and service drain network in patna, bihar

Read more
Selection of consultant for preparation of detailed project report (dpr) for construction, improvement and interlinking of khannua nallah and associated drainage and service drain network in patna, bihar

Selection of consultant for preparation of detailed project report (dpr) for construction, improvement and interlinking of khannua nallah and associated drainage and service drain network in patna, bihar

Read more
Selection of consultant for preparation of detailed project report (dpr) for construction, improvement and interlinking of pahari nallah and associated drainage and service drain network in patna, bihar

Selection of consultant for preparation of detailed project report (dpr) for construction, improvement and interlinking of pahari nallah and associated drainage and service drain network in patna, bihar

Read more
Repair and rehabilitation of rob sultanganj in 1st km of sultanganj tarapur road (sh-22) in the district of bhagalpur

Repair and rehabilitation of rob sultanganj in 1st km of sultanganj tarapur road (sh-22) in the district of bhagalpur

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.

Read more
Raising and improvements to major district road connecting arabhavi challakere sh 45 to shingalapur thakke lolasur basaligundi, nallanatti, balobal, biranagaddi, hunashyal p.g. to join sankeshwar sangam sh 44 near vaderahatti from km 1.45 to 5.00 (including krdcl approach) in gokak taluka of belagavi district under 5054-04-337-01-132 mdr road improvements for 2026-27

Raising and improvements to major district road connecting arabhavi challakere sh 45 to shingalapur thakke lolasur basaligundi, nallanatti, balobal, biranagaddi, hunashyal p.g. to join sankeshwar sangam sh 44 near vaderahatti from km 1.45 to 5.00 (including krdcl approach) in gokak taluka of belagavi district under 5054-04-337-01-132 mdr road improvements for 2026-27

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise