Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚂 Procurement Opportunity: Earth Filling And Muffling Services For Rny Division 🛠️🌧️ The Ministry Of Railways, Specifically The Central Government Ministry/Department, Is Seeking Bids For The Provision Of Earth Filling, Muffing, And Construction Of Mast Foundations Using Dry Stone Boulders, Bamboo, And Sandbags At The Rny Division In Guwahati. 🏗️ 📅 Bid Submission Deadline: April 8, 2024, 3:00 Pm Tender Fee: Inr 3000 Emd: Inr 48700 This Project Is Particularly Focused On The Monsoon Season And Requires Bidders To Demonstrate Expertise In Handling Such Specialized Tasks. Interested Contractors Should Review The Tender Document For Complete Details And Submission Guidelines. Keywords: Earth Filling, Muffling, Mast Foundation, Dry Stone Boulder, Bamboo, Sand Bag, Ministry Of Railways, Rny Division, Guwahati, Government Tender, Procurement| Particulars | Details |
|---|---|
| Title |
At Rny Division: Provision Of Earth Filling, Muffing , And Dry Stone Boulder With Bamboo And Sand Bag For Mast Foundation Across Rny Division During Monsoon Season For 01 (One Year)
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 73853328 |
|
Reference Number |
EL-RNY-TRD-36-2023-24 |
| Tender Fee | 3000 |
| EMD | 48700 |
| Tender Value | - |
| Place | Guwahati |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/042024/73853328/viewNitPdf_4494470.pdf |
| Start Date | March 17, 2024 03:36 |
| End Date |
Expired
08/04/2024
Expired 918 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreEarth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Read moreSupply of boulder, gabion box, geo bags, empty cement bags and bamboo for recoupment of monsoon reserve stock under the jurisdiction of den/iii/rny in bg-iii section & supply of boulder, gabion box, geo bags, empty cement bags and bamboo for recoupment of monsoon reserve stock under the jurisdiction of sr. den/i/rny in bg-i section
For complete deion and other details, please refer to tender
Read moreSupplying of stone boulder as emergency material during monsoon in howrah division
For complete deion and other details, please refer to tender
Read moreSupplying of stone boulder as emergency material during monsoon in howrah division
For complete deion and other details, please refer to tender
Read moreConstruction of stone boulder bund across river brahmani down stream of intake pump house
Construction of stone boulder bund across river brahmani down stream of intake pump house
Read moreEarth work in foundation,aggregate 40mm,aggregate 20mm,coarse sand,stone boulder,brick,door window
Read more
Construction of stone boulder bund across river brahmani down stream of intake pump house (phase-ii)
Construction of stone boulder bund across river brahmani down stream of intake pump house (phase-ii)
Read moreOpen e-tender for the work of emergency work of spreading stone dust, gunny bag filled with railway materials, laying of stone boulder, boulder crating, ballah, earth filling etc at different locations for coming monsoon and other misc. works in malda division.
For complete deion and other details, please refer to tender
Read moreOpen e-tender for the work of emergency work of spreading stone dust, gunny bag filled with railway materials, laying of stone boulder, boulder crating, ballah, earth filling etc at different locations for coming monsoon and other misc. works in malda division.
For complete deion and other details, please refer to tender
Read moreof your Industry type