Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Co2 Gas As Per Is 307/1966,Klem Valve Replacement Charges,Charges For Hydro Testing Including Purgi
|
| Description |
|
| Organisation | Department of Atomic Energy | PMO |
| Tender Id | GEM/2024/B/4546598 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | January 30, 2024 16:26 |
| End Date |
Expired
22/02/2024
Expired 967 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | AJAY AIR PRODUCTS PRIVATE LIMITED | Make : Helious Model : Refilling of CO2 gas in NPCIL Cylinders Purity 99% Title : Refilling of CO2 gas in NPCIL Cylinders Purity 99% | 22-02-2024 10:50:44 | N/A | Qualified |
| 2 | CARGO GEAR SERVICES (INDIA) PRIVATE LIMITED | Make : LINDE GAS Model : LINDE GAS Title : Co2 Gas as per IS 307/1966 | 21-02-2024 11:33:53 | N/A | Qualified |
| 3 | M2R CIVILINFRA PRIVATE LIMITED | Make : M2R GROUP Model : CHEMICAL Title : TITLE-1 | 16-02-2024 11:55:12 | N/A | Disqualified |
| 4 | SHRI PADMAVATI INDUSTRIAL GASES | Make : CO2 GAS IN CYLINDER Model : CO2 Gas As Per IS 307/1966 In NPCIL Cylinders Title : CO2 Gas As Per IS 307/1966 In NPCIL Cylinders | 21-02-2024 13:37:26 | MSE | Qualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | SHRI PADMAVATI INDUSTRIAL GASES(MSE)( MSE Social Category:General ) | Item Categories : CO2 gas as per IS 307/1966,Klem valve replacement charges,Charges for hydro testing including purgi | 213462.00 | L1 |
| 2 | CARGO GEAR SERVICES (INDIA) PRIVATE LIMITED | Item Categories : CO2 gas as per IS 307/1966,Klem valve replacement charges,Charges for hydro testing including purgi | 611712.00 | L2 |
| 3 | AJAY AIR PRODUCTS PRIVATE LIMITED | Item Categories : CO2 gas as per IS 307/1966,Klem valve replacement charges,Charges for hydro testing including purgi | 641979.00 | L3 |
Standard dry nitrogen gas,valve spindle replacement,total valve replacement,cylinder cap or valve guard,gland nut replacement,neck ring replacement,oil trace removable,painting for cylinder,valve fitting,hydro static testing
Standard dry nitrogen gas,valve spindle replacement,total valve replacement,cylinder cap or valve guard,gland nut replacement,neck ring replacement,oil trace removable,painting for cylinder,valve fitting,hydro static testing
Read moreReplacement of existing opening and closing oil pipelines of hydraulically operated gate valve installed in draft tube drain pipeline, from turbine floor to valve location along with its testing and successful commissioning at 3x42mw larji powerhouse
Replacement of existing opening and closing oil pipelines of hydraulically operated gate valve installed in draft tube drain pipeline, from turbine floor to valve location along with its testing and successful commissioning at 3x42mw larji powerhouse
Read moreM1060320255 co2,m1060501005 argon,m1060950096 zero air gas,m1060101007 oxygen,m1060150054 nitrogen gas,trip charge maintenance of cylinder cylinder valve,trip charge maintenance of cylinder spindle key,trip charge maintenance of cylinderwasher,trip charge maintenance of cylinderneck ring,trip charge maintenance of cylinderbottom ring,trip charge maintenance of cylindergland nut,trip charge maintenance of cylindersafety cap,trip charge maintenance of cylinder drilling out broken spindle,trip charge maintenance of cylinder drilling out broken valve,trip charge maintenance of cylinder hydrotest charges,trip charge maintenance of cylinder cylinder paiting charges,trip charge maintenance of cylinder transportation charges per trip
M1060320255 co2,m1060501005 argon,m1060950096 zero air gas,m1060101007 oxygen,m1060150054 nitrogen gas,trip charge maintenance of cylinder cylinder valve,trip charge maintenance of cylinder spindle key,trip charge maintenance of cylinderwasher,trip charge maintenance of cylinderneck ring,trip charge maintenance of cylinderbottom ring,trip charge maintenance of cylindergland nut,trip charge maintenance of cylindersafety cap,trip charge maintenance of cylinder drilling out broken spindle,trip charge maintenance of cylinder drilling out broken valve,trip charge maintenance of cylinder hydrotest charges,trip charge maintenance of cylinder cylinder paiting charges,trip charge maintenance of cylinder transportation charges per trip
Read moreProviding and replacement of glycol motor seal and bearing per direction of engineer incharge, including deduction of cost of old unserviceable motor seal,servicing and rewinding of 7.50 hp monoblock motor including providing,providing and replacement of fan coil unit connection pipe nipple size 1inch as per direction of engineer incharge,rewinding of fan coil unit motor with neccessory repair whichever will required during the servicing, labour charges and proper testing of functioning of motor,providing and servicing of f.cu air filter as per direction of engineer incharge,servicing of burner including required deep cleaning up to satisfactory mark as per direction of engineer incharge,providing and replacement of burner nozzle as per direction of engineer incharge,,providing and replacement of burner on off switch as per direction of engineer incharge,,supplying of filling of glycol as per direction of engineer incharge,providing and replacement pressure gauge as per direction of engineer incharge, includi
Providing and replacement of glycol motor seal and bearing per direction of engineer incharge, including deduction of cost of old unserviceable motor seal,servicing and rewinding of 7.50 hp monoblock motor including providing,providing and replacement of fan coil unit connection pipe nipple size 1inch as per direction of engineer incharge,rewinding of fan coil unit motor with neccessory repair whichever will required during the servicing, labour charges and proper testing of functioning of motor,providing and servicing of f.cu air filter as per direction of engineer incharge,servicing of burner including required deep cleaning up to satisfactory mark as per direction of engineer incharge,providing and replacement of burner nozzle as per direction of engineer incharge,,providing and replacement of burner on off switch as per direction of engineer incharge,,supplying of filling of glycol as per direction of engineer incharge,providing and replacement pressure gauge as per direction of engineer incharge, includi
Read moreCo2 gas as per is 307/1966 in npcil cylinders cylinder,klem valve replacement charges,charges for h
Read more
Carbonoxide gas ( co2 ) to is:307/1966.
For complete deion and other details, please refer to tender
Read moreCarbonoxide gas ( co2 ) to is:307/1966.
For complete deion and other details, please refer to tender
Read moreof your Industry type