Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Core Switch With 40 Ports Of 100 M 1 2.5 5 10 Gb E Ports 8 X Sfp Ports And 4 Qsfp28 40 Gb E 100 Gb E Port
|
Description |
|
Organisation | Department of Higher Education | Ministry of Education |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | June 27, 2025 01:46 |
End Date |
17/07/2025 ( 20 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Aoh kit ep contactor filter on/off. each consist of 7 items 8 nos. (1) cartridge body assly, aal part no. 2220007100/04 - 01 nos (2) rubber o ring valve housing, aal part no. 2220007100/06 - 02 nos (3) rubber o ring piston sm, aal part no. 2220007100/07 - 01 no (4) rubber o ring cylinder sm, aal part no. 2220007100/05 - 01 no. (5) rubber o ring air conn, aal part no. 2220007100/08 - 01 no. (6) seal piston sm, aal partno. 2220007100/09 - 01 no. (7) rubber cap, aal part no. 2220007100/10 - 0
For complete deion and other details, please refer to tender
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreDesign, supply, install, test and commission innovative and immersive 3d projection mapping s at ooty lake and yercaud lake (package-1) with operations and maintenance for a period of 10 years on ppp basis
Design, supply, install, test and commission innovative and immersive 3d projection mapping s at ooty lake and yercaud lake (package-1) with operations and maintenance for a period of 10 years on ppp basis
Read moreDraft global tender enquiry with pre-bid meeting for supply and erection and commissioning of 10 nos. 9-11 cu.m hydraulic excavators derated to 8-9 cu.m for bacheli and kirandul complexes
Draft global tender enquiry with pre-bid meeting for supply and erection and commissioning of 10 nos. 9-11 cu.m hydraulic excavators derated to 8-9 cu.m for bacheli and kirandul complexes
Read moreHiring the services of a brand new bolero camper di,4wd with double cabin base model or an equivalent model vehicle with standard fittings including 1 no. driver and 2 nos. helpers for providing pigging assistance services e.g. cleaning, handling and transportation of crude oil or wax or sludge or pig in duliajan digboi cod line for a periof of 4 years.
Hiring the services of a brand new bolero camper di,4wd with double cabin base model or an equivalent model vehicle with standard fittings including 1 no. driver and 2 nos. helpers for providing pigging assistance services e.g. cleaning, handling and transportation of crude oil or wax or sludge or pig in duliajan digboi cod line for a periof of 4 years.
Read more8" id, 4.5 metre long delivery hoses of,10 in id 4.5 metre long delivery rubber hoses,12inch id x 4
Read more
Item 1,item 2,item 3,item 4,item 5,item 6,item 7,item 8,item 9,item 10,item 11,item 12,item 13,item
Read more
Item-1,item-2,item-3,item-4,item-5,item-6,item-7,item-8,item-9,item-10,item-11,item-12,item-13,item
Read more
Core switch with 40 ports of 100m 1 2.5 5 10 gbe ports 8 x sfp ports and 4 qsfp28 40gbe 100gbe port
Read more
Upgradation of bathinda dabwali road nh 64 to refinery phullokhari rd 16 point 80 to 17 point 88 km with maintenance of road for 5 years in which 1 year defect liabillity period and 4 years maintenance period
Upgradation of bathinda dabwali road nh 64 to refinery phullokhari rd 16 point 80 to 17 point 88 km with maintenance of road for 5 years in which 1 year defect liabillity period and 4 years maintenance period
Read moreof your Industry type