Tender Details

Particulars Details
Title
Construction Of Retaining Wall And River Bank Piching Work At Bhusi South Pump Canal Including All Cost Of Material (Excluding Cement), Labour, Tand P Used Complete In All Respects As Per Drawing Provided By Department. As Directed By Engineer In C
Description
Construction Of Retaining Wall And River Bank Piching Work At Bhusi South Pump Canal Including All Cost Of Material (Excluding Cement), Labour, Tand P Used Complete In All Respects As Per Drawing Provided By Department. As Directed By Engineer In C
Organisation Government of Uttar Pradesh
Tender Id 2023_UPIDM_844870_14
Reference
Number
09/EE/MLCD/VNS/2023-24
Tender Fee 766
EMD 17000
Tender Value
Place Executive Engineer Minor lift canal division vns
Link https://etender.up.nic.in
Start Date October 03, 2023 17:30
End Date

10/10/2023 ( Expired 608 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
1st class brick for lining of canal with 100 percent new brick alongwith main canal bed from chainage (0.450 to 1.00) km with all cost of material, labour, tool and plant etc as required as per drawing and boq at phagoopur pump can

1st class brick for lining of canal with 100 percent new brick alongwith main canal bed from chainage (0.450 to 1.00) km with all cost of material, labour, tool and plant etc as required as per drawing and boq at phagoopur pump canal in raibareli

Read more
First class brick lining work 1 3 cm in mawai minor from chainage 0.725 to 1.075 at kundakala pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as direc

First class brick lining work 1 3 cm in mawai minor from chainage 0.725 to 1.075 at kundakala pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as direc

Read more
Bank protection work of river bank right side of barge from 0.00 to 22.50 m at balua pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed by e

Bank protection work of river bank right side of barge from 0.00 to 22.50 m at balua pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed by e

Read more
Strenthaning of uruwa minor by renovation of old brick lining 1 4 c.m. in between 0.000 km to 0.850 km at reruwa pump canal including all cost of material, (excluding cement and brick ) labour, t and p used, complete in all respect as per drawing p

Strenthaning of uruwa minor by renovation of old brick lining 1 4 c.m. in between 0.000 km to 0.850 km at reruwa pump canal including all cost of material, (excluding cement and brick ) labour, t and p used, complete in all respect as per drawing p

Read more
Strenthaning of main canal by stone boulder piching from 0.400 km to 0.564 km at dhankuwari pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed

Strenthaning of main canal by stone boulder piching from 0.400 km to 0.564 km at dhankuwari pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed

Read more
Strenthaning of sobandha left minor from 1.570 km to 2.070 km by brick lining work at sogai pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed

Strenthaning of sobandha left minor from 1.570 km to 2.070 km by brick lining work at sogai pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed

Read more
Bank protection work of river bank from 20.00 m to 40.00 m at sogai pump canal including all cost of material (excluding cement ), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge.

Bank protection work of river bank from 20.00 m to 40.00 m at sogai pump canal including all cost of material (excluding cement ), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge.

Read more
Strenthaning of main canal by stone boulder piching from 0.250 km to 0.400 km at dhankuwari pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed

Strenthaning of main canal by stone boulder piching from 0.250 km to 0.400 km at dhankuwari pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed

Read more
Construction of boundry wall at niyardih ii feeder pump canal including all cost of material (excluding cement), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge.

Construction of boundry wall at niyardih ii feeder pump canal including all cost of material (excluding cement), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge.

Read more
Providing and laying aluminium conductor p.v.c. sheathed cable 1100 volts grouting with m.s. clamps of 3.5x630 sqm. size complete in all respects at dhankuwari pump canal including all cost of material as directed by engineer in charge

Providing and laying aluminium conductor p.v.c. sheathed cable 1100 volts grouting with m.s. clamps of 3.5x630 sqm. size complete in all respects at dhankuwari pump canal including all cost of material as directed by engineer in charge

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise