Tender Details

Particulars Details
Title
Construction Of Ramp At Slope Of River Bank At Naubatpur Pump Canal Including All Cost Of Material (Excluding Cement ), Labour, T And P Used Complete In All Respects As Per Drawing Provided By Department. As Directed By Engineer In Charge.
Description
Construction Of Ramp At Slope Of River Bank At Naubatpur Pump Canal Including All Cost Of Material (Excluding Cement ), Labour, T And P Used Complete In All Respects As Per Drawing Provided By Department. As Directed By Engineer In Charge.
Organisation Government of Uttar Pradesh
Tender Id 2023_UPIDM_844870_2
Reference
Number
09/EE/MLCD/VNS/2023-24
Tender Fee 766
EMD 10000
Tender Value
Place Executive Engineer Minor lift canal division vns
Link https://etender.up.nic.in
Start Date October 03, 2023 17:30
End Date

10/10/2023 ( Expired 579 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Renovation of store-1at work of tubewell division lucknow including all material labour t and p as per specifications of boq

Renovation of store-1at work of tubewell division lucknow including all material labour t and p as per specifications of boq

Read more
Renovation of store-2 at work of tubewell division lucknow including all material labour t and p as per specifications of boq

Renovation of store-2 at work of tubewell division lucknow including all material labour t and p as per specifications of boq

Read more
Investigation and survey on gis basis of the project area including soil investigation engineering design hydraulic and structural as required procurement of all labour and material t and p etc and construction of various components complete

Construction of 0.6 mld stp pumping station conveyance system and other associated sewerage works and drain works in patelpuram gaytri shaktipeeth, gomti nagar vistar sector1 district lucknow up india

Read more
First class brick lining work 1 3 cm in mawai minor from chainage 0.725 to 1.075 at kundakala pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as direc

First class brick lining work 1 3 cm in mawai minor from chainage 0.725 to 1.075 at kundakala pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as direc

Read more
Repair and renovation work of main adminstrative building of tubewell division lucknow including all material labour t and p as per specifications of boq

Repair and renovation work of main adminstrative building of tubewell division lucknow including all material labour t and p as per specifications of boq

Read more
Bank protection work of river bank right side of barge from 0.00 to 22.50 m at balua pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed by e

Bank protection work of river bank right side of barge from 0.00 to 22.50 m at balua pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed by e

Read more
Ktps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 (or from actual date of utilization) to 31 -03 - 2026-reg.

Ktps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 (or from actual date of utilization) to 31 -03 - 2026-reg.

Read more
Strenthaning of uruwa minor by renovation of old brick lining 1 4 c.m. in between 0.000 km to 0.850 km at reruwa pump canal including all cost of material, (excluding cement and brick ) labour, t and p used, complete in all respect as per drawing p

Strenthaning of uruwa minor by renovation of old brick lining 1 4 c.m. in between 0.000 km to 0.850 km at reruwa pump canal including all cost of material, (excluding cement and brick ) labour, t and p used, complete in all respect as per drawing p

Read more
Strenthaning of main canal by stone boulder piching from 0.400 km to 0.564 km at dhankuwari pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed

Strenthaning of main canal by stone boulder piching from 0.400 km to 0.564 km at dhankuwari pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed

Read more
Laying of interlocking tiles with kerb stone complete with all material labour, t and p (as per specification of boq)

Laying of interlocking tiles with kerb stone complete with all material labour, t and p (as per specification of boq)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise