Tender Details
Particulars | Details |
---|---|
Title |
Electrical Wiring Along With Modification Work For Installation Of 6 Kva Ups In Existing Insatallation In Building Of Computer Science
|
Description |
Electrical Wiring Along With Modification Work For Installation Of 6 Kva Ups In Existing Insatallation In Building Of Computer Science
|
Organisation | Banaras Hindu University | Central Govt. Ministry/Department |
Tender Id | 2025_BHU_786435_1 |
Reference Number |
BHU/UWD/WO/2024-25/133 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Office of the Superintending Engineer, UWD, BHU |
Link | https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1090763 |
Start Date | January 24, 2025 20:30 |
End Date |
27/01/2025 ( Expired 112 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreE-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
E-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
Read moreWork of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.
Work of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Read moreBalance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read morePre-qualification for appointment of hvac consultant for replacement of existing 360 tr (12 compressors of 30 tr each) chiller based central ac plant of lho patna building and existing 480 tr (4 compressor of 120 tr each) chiller based central ac plant of patna main branch building with energy efficient chiller ac plant
Pre-qualification for appointment of hvac consultant for replacement of existing 360 tr (12 compressors of 30 tr each) chiller based central ac plant of lho patna building and existing 480 tr (4 compressor of 120 tr each) chiller based central ac plant of patna main branch building with energy efficient chiller ac plant
Read moreHiring of services for drilling directional wells with rss sdmm plus mwd lwd plus jar including mud services along with personnel in the northeastern states of india
Hiring of services for drilling directional wells with rss sdmm plus mwd lwd plus jar including mud services along with personnel in the northeastern states of india
Read moreIe for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreConstruction of 6 lane vup at km. 264.237 along with service road in village kherika on hisar - dabwali section of nh-09 in the state of haryana on epc mode
Construction of 6 lane vup at km. 264.237 along with service road in village kherika on hisar - dabwali section of nh-09 in the state of haryana on epc mode
Read moreof your Industry type