Tender Details

Particulars Details
Title
Construction Of Shed In Bc Chaupal At Village Bhangarh Block Kairu Mplad
Description
Construction Of Shed In Bc Chaupal At Village Bhangarh Block Kairu Mplad
Organisation Haryana Government | State Govt. and UT
Tender Id 2026_HRY_494701_1
Reference
Number
20260DDE3668 E7BD 46F2 8FB3 4B2B651C1062688DEV
Tender Fee 2180
EMD 8060
Tender Value
Place BHANGARH
Link
View Original Tender Notice

https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=573162

Start Date January 03, 2026 23:30
End Date
Expired 09/01/2026

Expired 197 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Read more
Licensing of kiosk spaces at metro stations of n-s corridor of upmrc network in lucknow.

Licensing of kiosk spaces at metro stations of n-s corridor of upmrc network in lucknow.

Read more
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam

Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam

Read more
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp

Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp

Read more
Construction of boundary wall of bc chaupal at village hetampura block kairu mplad

Construction of boundary wall of bc chaupal at village hetampura block kairu mplad

Read more
Construction of sc chaupal at village keharpura block kairu mplad

Construction of sc chaupal at village keharpura block kairu mplad

Read more
Construction of boundary wall of sc chaupal at village golagarh block kairu mplad

Construction of boundary wall of sc chaupal at village golagarh block kairu mplad

Read more
Bhiwani khera,scheme-mplad,...

Bhiwani khera,scheme-mplad, construction of iron/tin shed in bc chaupal at village bhiwani khera

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise