Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Shed In Bc Chaupal At Village Bhangarh Block Kairu Mplad
|
| Description |
Construction Of Shed In Bc Chaupal At Village Bhangarh Block Kairu Mplad
|
| Organisation | Haryana Government | State Govt. and UT |
| Tender Id | 2026_HRY_494701_1 |
|
Reference Number |
20260DDE3668 E7BD 46F2 8FB3 4B2B651C1062688DEV |
| Tender Fee | 2180 |
| EMD | 8060 |
| Tender Value | |
| Place | BHANGARH |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=573162 |
| Start Date | January 03, 2026 23:30 |
| End Date |
Expired
09/01/2026
Expired 197 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreLicensing of kiosk spaces at metro stations of n-s corridor of upmrc network in lucknow.
Licensing of kiosk spaces at metro stations of n-s corridor of upmrc network in lucknow.
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreConstruction of boundary wall of bc chaupal at village hetampura block kairu mplad
Construction of boundary wall of bc chaupal at village hetampura block kairu mplad
Read moreConstruction of sc chaupal at village keharpura block kairu mplad
Construction of sc chaupal at village keharpura block kairu mplad
Read moreConstruction of boundary wall of sc chaupal at village golagarh block kairu mplad
Construction of boundary wall of sc chaupal at village golagarh block kairu mplad
Read moreBhiwani khera,scheme-mplad,...
Bhiwani khera,scheme-mplad, construction of iron/tin shed in bc chaupal at village bhiwani khera
Read moreof your Industry type