Particulars | Details |
---|---|
Title |
Laying And Dismantling Of Ms Pipeline And Pvc Lay Flat, Along With Shifting Of Pump Motor In Turra Coal Seam (Central And East) Entry On An As And When Required Basis During The Monsoon Season At Dudhichua Project
|
Description |
Laying And Dismantling Of Ms Pipeline And Pvc Lay Flat, Along With Shifting Of Pump Motor In Turra Coal Seam (Central And East) Entry On An As And When Required Basis During The Monsoon Season At Dudhichua Project
|
Organisation | Northern Coalfields Limited | Central Govt. Ministry/Department |
Tender Id | 2024_NCL_775655_1 |
Reference Number |
DCH/EnM/Quotation/24-25/10 |
Tender Fee | 0 |
EMD | 2500 |
Tender Value | |
Place | DUDHICHUA, NCL |
Link | https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1079684 |
Start Date | October 21, 2024 18:00 |
End Date |
26/10/2024 ( Expired 254 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Laying pvc di 160 mm od pipeline 8 inch and 6 inch ms pipeline polder type pump along with pumping machinery at booster phase 10 and booster for flats infront of manav mangal school phase 10 to improve pressure in the area h no 891 to 1100 of phase 9
Laying pvc di 160 mm od pipeline 8 inch and 6 inch ms pipeline polder type pump along with pumping machinery at booster phase 10 and booster for flats infront of manav mangal school phase 10 to improve pressure in the area h no 891 to 1100 of phase 9
Read moreShifting, erection and dismantling of ht overhead line feeder f2, f5, f7 at central pump house coal section to provide power to pumps operation during monsoon period
Shifting, erection and dismantling of ht overhead line feeder f2, f5, f7 at central pump house coal section to provide power to pumps operation during monsoon period
Read moreWork of 8 inch ms/gi pipeline with dismantling, laying, pipe cutting, jointing etc work for pump shifting at coal face as well as 32 no. sump including repairing of old damaged delivery pipelines as when where req as per advancement of mine
Work of 8 inch ms/gi pipeline with dismantling, laying, pipe cutting, jointing etc work for pump shifting at coal face as well as 32 no. sump including repairing of old damaged delivery pipelines as when where req as per advancement of mine
Read moreInstallation of 01 no. pump-motor sets at kcc coal patch along with laying and jointing of pipeline at dipka expansion project.
Installation of 01 no. pump-motor sets at kcc coal patch along with laying and jointing of pipeline at dipka expansion project.
Read moreDismantling of 150mm dia pipeline and laying of pipeline (refer deion of work as per nit) and time to time shifting of 1000 gpm pump motor complete including all accessories in various location as and when req for a period of one year
Dismantling of 150mm dia pipeline and laying of pipeline (refer deion of work as per nit) and time to time shifting of 1000 gpm pump motor complete including all accessories in various location as and when req for a period of one year
Read moreLaying and dismantling of pipeline installation dismantling and shifting of pump motor of amlai ocm sohagpur area secl
Laying and dismantling of pipeline installation dismantling and shifting of pump motor of amlai ocm sohagpur area secl
Read moreDismantling and laying of 250/300mm dia ms pipeline in main sump (turra) and purewa bottom coal face as when required during monsoon 2025 at bina project.
Dismantling and laying of 250/300mm dia ms pipeline in main sump (turra) and purewa bottom coal face as when required during monsoon 2025 at bina project.
Read moreDismantling, laying and di of 3 range x 390m of 8 and 10 inch dia. pipeline with all electrical accessories for multiple shifting of pump-motor for a period of 12 months running for dewatering at quarry no. 03 under ktc.
Dismantling, laying and di of 3 range x 390m of 8 and 10 inch dia. pipeline with all electrical accessories for multiple shifting of pump-motor for a period of 12 months running for dewatering at quarry no. 03 under ktc.
Read moreCarrying , laying, jointing and dismantling of pipeline of different sizes and installation, dismantling and shifting of pumps and its accessories during monsoon 25 26 at block-b project.
Carrying , laying, jointing and dismantling of pipeline of different sizes and installation, dismantling and shifting of pumps and its accessories during monsoon 25-26 at block-b project.
Read moreCommissioning 11 sets of pontoon with pump and motor during monsoon at coal and east section of dudhichua
Commissioning 11 sets of pontoon with pump and motor during monsoon at coal and east section of dudhichua