Tender Details

Particulars Details
Title
Construction And Commissioning Of New Tube Odex Method With Pipe Line At Meena Dhani, Singod Road Rwss Khejroli Block Govindgarh Jaipur
Description
Construction And Commissioning Of New Tube Odex Method With Pipe Line At Meena Dhani, Singod Road Rwss Khejroli Block Govindgarh Jaipur
Organisation PHED-Chief Engineer(HQ),Jaipur | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 1500
EMD 34820
Tender Value
Place SHAHPURA
Link

AAAAAAAAAA

Login to view
Start Date June 21, 2025 14:30
End Date

04/07/2025 ( 12 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Read more
Rejuvenation of sankat mochan lake with construction, installation and commissioning of 100 kld stp under amrut 2.0 scheme at chhatarpur

Rejuvenation of sankat mochan lake with construction, installation and commissioning of 100 kld stp under amrut 2.0 scheme at chhatarpur

Read more
Const of 1 no 66kv line bay at 66kv s/s hsp road phagwara under rdss

Construction of additional foundations for 1no. 66kv line bay and allied civil works like trenches, gravel spreading at 66kv s/s hoshiarpur road phagwara (under op. circle jalandhar) (twl no. 165/nz/2023-24/annex-e) under rdss

Read more
Raising strengthening and construction of flexible pavement road on esml total length 31.985 km with restoration of 7 nos. stud and construction of 13 nos. new studs from km 14.00 to km 26.275 of esml under bwsimp.

Raising, strengthening and construction of flexible pavement road on esml total length 31.985 km with restoration of 7 nos. stud and construction of 13 nos. new studs from km 14.00 to km 26.275 of esml under bwsimp.

Read more
Construction of fob at km 382.510 and construction of service road from km.410/680 to km 411.260 along with new minor bridge on bhs in dindigul to samayanallaur section of nh-44 in the state of tamil nadu on item rate basis (3rd call)

Construction of fob at km 382.510 and construction of service road from km.410/680 to km 411.260 along with new minor bridge on bhs in dindigul to samayanallaur section of nh-44 in the state of tamil nadu on item rate basis (3rd call)

Read more
Rectification of 01 nos. blackspots (bhutpura) on chittorgarh udaipur section and construction of new 2l elevated ramp at debari interchange on chittorgarh udaipur road section to provide connection from chittorgarh to pindwara

Rectification of 01 nos. blackspots (bhutpura) on chittorgarh udaipur section and construction of new 2l elevated ramp at debari interchange on chittorgarh udaipur road section to provide connection from chittorgarh to pindwara

Read more
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Read more
Construction of g plus 2 storied linac building and proposed horizontal and vertical extension up to (g plus 9) with provision of 10 storied of linac building (g plus 2) at 1 harish mukherjee road at ipgmer - sskm hospital, kolkata - sitc of lift

Construction of g plus 2 storied linac building and proposed horizontal and vertical extension up to (g plus&amp#x0d 9) with provision of 10 storied of linac building (g plus 2) at 1 harish mukherjee road at ipgmer - sskm&amp#x0d hospital, kolkata - sitc of lift

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise