Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Klmbp 2022 23 Project No 120/23 (156/24) (239/25) Vpty Compound Wall, Gate Maintenance And Drainage In Varapetty Chc
|
| Description |
Klmbp 2022 23 Project No 120/23 (156/24) (239/25) Vpty Compound Wall, Gate Maintenance And Drainage In Varapetty Chc
|
| Organisation | Local Self Government Department | State Govt. and UT |
| Tender Id | 2024_LSGD_683395_1 |
|
Reference Number |
ET1/2024-25/AE/LSGD/KLM-02 |
| Tender Fee | 2760 |
| EMD | 37077 |
| Tender Value | - |
| Place | Kothamangalam BP Office |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1071054 |
| Start Date | August 30, 2024 16:30 |
| End Date |
Expired
06/09/2024
Expired 768 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
45 w led street light fittings pin type,45 watts led street light fittings,constant current led driver is 15885, r-71012530,4 core x 50 sqmm pvc insulated ug aluminium armoured cable,4 core x 25 sqmm pvc insulated ug aluminium armoured cable,2 core x 10 sqmm pvc insulated ug aluminium armoured cable 90 m coil,4 core x 4 sqmm pvc insulated copper cable 100 m coil,16 sqmm. 3.5 core aluminum armored cable,16 sqmm. 4 core unarmored copper cable,120 sqmm. trailing copper cable 4 core,25 sqmm. welding copper cable, 250amps.,10 hp star delta motor starter 3 wire,7.5 hp star delta motor starter 3 wire,d.o.l starter for 5 hp 3 phase electric water pump,star-delta er for 25 hp 3 phase electric water pump,6 liter 5 star geyser,12 v, 200 ah battery for invertor,18 watts solar gate light,12 watts solar compound wall light,6 watts solar wall washer light up and dowm,9 watts 18 m, 12 mm width tiranga rope light,250 amps pcc control panel, 415 v,750 va wall mounted type ups,smps with battery for intercom system,universa
45 w led street light fittings pin type,45 watts led street light fittings,constant current led driver is 15885, r-71012530,4 core x 50 sqmm pvc insulated ug aluminium armoured cable,4 core x 25 sqmm pvc insulated ug aluminium armoured cable,2 core x 10 sqmm pvc insulated ug aluminium armoured cable 90 m coil,4 core x 4 sqmm pvc insulated copper cable 100 m coil,16 sqmm. 3.5 core aluminum armored cable,16 sqmm. 4 core unarmored copper cable,120 sqmm. trailing copper cable 4 core,25 sqmm. welding copper cable, 250amps.,10 hp star delta motor starter 3 wire,7.5 hp star delta motor starter 3 wire,d.o.l starter for 5 hp 3 phase electric water pump,star-delta er for 25 hp 3 phase electric water pump,6 liter 5 star geyser,12 v, 200 ah battery for invertor,18 watts solar gate light,12 watts solar compound wall light,6 watts solar wall washer light up and dowm,9 watts 18 m, 12 mm width tiranga rope light,250 amps pcc control panel, 415 v,750 va wall mounted type ups,smps with battery for intercom system,universa
Read moreKlmbp 2022-23 project no-119/23 (178/24) (238/25) vpty-renovation and laying paving blocks in varapetty chc court yard
Klmbp 2022-23 project no-119/23 (178/24) (238/25) vpty-renovation and laying paving blocks in varapetty chc court yard
Read moreNnual plan-klmbp 2023-24, 114/24, vpty varapetty grama panchayath ward 10, construction of cultural centre at ambedkar colony
Civil works
Read moreAnnual plan-klmbp 2024-25 project no 304/25 vpty-ambedkar cultural centre construction phase 2 in varapetty grama panchayathgeneral civil work
Annual plan-klmbp 2024-25 project no&#x0d 304/25 vpty-ambedkar cultural&#x0d centre construction phase 2 in&#x0d varapetty grama panchayathgeneral civil work
Read moreAnnual plan-klmbp 2022-23, 217/23 (209/24), plmgm-completion of drainage work at pallarimangalam chc-
Civil works
Read moreConstruction of compound wall along with gate at chc maddur
Construction of compound wall along with gate in the premises of community health centre maddur (v and m) at narayanpet in narayanpet district
Read moreAnnual plan-klmbp 2022-23, 227/23 (201/24) - krpa-completion of erumpuram sc cemetery compound wall
Civil works
Read moreAnnual plan-klmbp 2023-24, 120/24, krpa -keerampara grama panchayath ward 12, completion of nedumpara sc cemetery compound wall
Civil works
Read moreAnnual plan-klmbp 2023-24_ 63/24_pdmn_ pindimana grama panchayath ward 03_construction of play ground compound wall and gate at chenkara govt lp school
Civil works
Read moreP no -120/24, construction of compound wall and gate in kombankallu glps in w- 14
P no -120/24, construction of compound wall and gate in kombankallu glps in w- 14
Read moreof your Industry type