Tender Details
This tender closed on 12 Mar 2024. 10 tenders like it are open now.
| Particulars | Details |
|---|---|
| Title |
Earthwork &Amp Blanketing In Embankment /Cutting In Formation Of New Bg Line Including Yards, Bridge Approaches Etc., Construction Of Bridge Work (Minor/Rub Foundation, Sub Structure And Super Structure) As Per Railway S Approved Design And Drawing, Construction Of Retaining/Boundary/Toe Wall. And Supply &Amp Spreading Of Machine Crushed Stone Ballast, Laying And Linking Of Bg Track For Main Line, Loop Lines And Points &Amp Crossing Etc In Section/Yards, Transportation Of P.Way Mater
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 72886196 |
|
Reference Number |
IND-DINL-DyCE-C-II-124 |
| Tender Fee | 0 |
| EMD | 1 Crore |
| Tender Value | - |
| Place | Mumbai |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/032024/72886196/viewNitPdf_4441765.pdf |
| Start Date | February 12, 2024 16:37 |
| End Date |
Expired
12/03/2024
Expired 970 days ago |
Bidding on tenders like this?
Partners, bid preparation, supplier quotes and GeM registration, from our team and partners.
Get alerts for tenders like this
This one has closed. Tell us what you supply and we'll send you new tenders like it.
Free tender checklists for your industry →Open tenders like this
-
Jeypore - nabarangpur new bg railway line project: design & construction of new bg railway line between ambaguda(excluding) (13.60 km) to nabarangpur(including) (43.996km) involving earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridges(excluding bridge no. 85 at km. 37.080 i.e. indravati bridge), road over bridges (robs), road under bridges (rubs), protection works, p.way track works with contractor s own material suppl
For complete description and other details, please refer to tender document.
Ministry of Railways Closes 10/11/2026
View tender -
Earthwork, construction of balanced major and minor bridges and protection works, trolley refuge, diversion of road in rub between chainage 117404m to 124830m in connection with construction of jiribum-tupul-imphal new bg railway line project.
For complete description and other details, please refer to tender document.
Ministry of Railways Closes 18/11/2026
View tender -
Construction of 4th bg line from itarsi (km 745.130) to bina (km 982.130) including earthwork, tunnels, bridges, road over bridge (rob), road under bridge (rub), station buildings, track works, electrification, signaling & telecommunication works, and allied miscellaneous works in connection with itarsi - bina 4th line project under west central railway in the state of madhya pradesh.
For complete description and other details, please refer to tender document.
Ministry of Railways Closes 14/12/2026
View tender -
Construction of new bg double line from kharsia (km 0.00) to balodabazar (km 110.500) and y-connectivity from jharadih including earthwork in formation, bridges, ror (rail over rail), rob (road over bridge), rub (road under bridge), service buildings, staff quarters, p-way works (including supply of ballast, p-way material exept rail), electrification (2x25 kv ohe, psi, plc & electrical general work), and signalling & telecommunication works, along with allied and associated miscellan
For complete description and other details, please refer to tender document.
Ministry of Railways Closes 11/11/2026
View tender -
Earthwork for construction of embankment and protection work from paniyahwa up to important bridge no. 50 (right bank approach of gandak river) in connection with gorakpur cantt - paniyahwa doubling project of varanai division of n. e. railway.
For complete description and other details, please refer to tender document.
Ministry of Railways Closes 10/11/2026
View tender -
Engineering procurement and construction (epc) of construction of new bg line work including earthwork, blanketing, minor bridges, major bridges, lhs/rubs, robs, track works, platform work, station building, fobs, other buildings, and associated miscellaneous works for 25t indian railway standard loading from ch. 1.350 km (excluding jhajha) to 22.000 km (including batia station) (total- 20.650 route km, 27.888 track km) in connection with the jhajha batia new line project
For complete description and other details, please refer to tender document.
Ministry of Railways Closes 11/02/2027
View tender -
Engineering procurement and construction (epc) of construction of viaducts, ror/rfo, major bridges, minor bridges, animal underpass, rub/lhs, tunnel/cut-cover, earthwork, blanketing, trolley refuge, turfing, buildings, retaining wall, toe wall etc. and other associated worksfor construction of new double line track for dfcc loading from ch.158.00 to ch.184 in koderma detour section in sonnagar-andal 3rd and 4th line project on epc mode in dhanbad division of east central railway.
For complete description and other details, please refer to tender document.
Ministry of Railways Closes 05/01/2027
View tender -
Construction of new railway line between deshalpar - hajipir - luna (82.38kms) (including all yards falling in the section) covering all works of earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs all p. way works (including laying and linking), supply of all types of sleepers, p. way fittings (excluding rails, steel girder), other civil engineering works, signal, telecom and electrical (general services and trd) complete works i
For complete description and other details, please refer to tender document.
Ministry of Railways Closes 09/02/2027
View tender -
Construction of 2nd new railway line (doubling works) between section kanalus(including) - okha (including) from km:853.36 to km:994.35 (including all yards and stations falling in the section) covering all works that are earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs, all p. way works (including laying and linking), supply of all types of sleepers, all p. way fittings, other civil engineering works, signal & telecommunica
For complete description and other details, please refer to tender document.
Ministry of Railways Closes 11/02/2027
View tender -
Construction of new railway line between vayor - lakhpat (including all yards falling in the section) covering all works of earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs all p. way works (including laying and linking), supply of all types of sleepers, p. way fittings (excluding rails, steel girder), other civil engineering works, signal, telecom and electrical (general services and trd) complete works in ahmedabad division
For complete description and other details, please refer to tender document.
Ministry of Railways Closes 10/02/2027
View tender