Tender Details

Particulars Details
Title
Dismantling, Transportation, Laying, Line Packing And Cleaning Of Haulage Track Line Of 28 Ls Working Of Seam C At Kurja Ug Mine Quantity. Laying 1290m, Dismantling 1590m, Line Packing 193.5m3 And Cleaning Work 812.7m3 For The Ten Month Time Period
Description
Dismantling, Transportation, Laying, Line Packing And Cleaning Of Haulage Track Line Of 28 Ls Working Of Seam C At Kurja Ug Mine Quantity. Laying 1290m, Dismantling 1590m, Line Packing 193.5m3 And Cleaning Work 812.7m3 For The Ten Month Time Period
Organisation South Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2025_SECL_327611_1
Reference
Number
AGM/HSD/SO(M)/e-Tend/24-25/143 dtd 01.02.2025
Tender Fee 0
EMD 28400
Tender Value
Place SECL Hasdeo Area
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=339561
Start Date February 01, 2025 23:30
End Date

13/02/2025 ( Expired 67 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Installation of 03 (three) nos. endless haulage at (9r/16xcut, 41r/25xcut and 49r/25xcut) mk seam and two-time complete pulley shifting of haulage installed at 49r/25xcut in every 200m at bhadra 7/8 ug mine, bhadra sub-area, jamuna kotma area.

Installation of 03 (three) nos. endless haulage at (9r/16xcut, 41r/25xcut and 49r/25xcut) mk seam and two-time complete pulley shifting of haulage installed at 49r/25xcut in every 200m at bhadra 7/8 ug mine, bhadra sub-area, jamuna kotma area.

Read more
Transportation, laying and fixing of 4 inch dia. pipeline for supplying water for cm machine operation in proposed depillaring panel cm-4a, cm-4b and cm-5 panel at vindhya ug mine, pinoura sub area, johilla area

Transportation, laying and fixing of 4 inch dia. pipeline for supplying water for cm machine operation in proposed depillaring panel cm-4a, cm-4b and cm-5 panel at vindhya ug mine, pinoura sub area, johilla area

Read more
Dismantling, loading, unloading, laying of track line its accessories and dismantling, loading, unloading, transportation of pvc belt and its accessories from 25 lw panel then installation in proposed depillaring panel 40le.

Dismantling, loading, unloading, laying of track line its accessories and dismantling, loading, unloading, transportation of pvc belt and its accessories from 25 lw panel then installation in proposed depillaring panel 40le.

Read more
Electrical maintenance of lt(440v) and ht(3.3kv 33kv) overhead line and sub stations, electrification of netaji subhashchndra bose stadium kapildhara colony, wiring of shramik sadan, pre monsoon for kurja ug mine of kurja sub area

Electrical maintenance of lt(440v) and ht(3.3kv 33kv) overhead line and sub stations, electrification of netaji subhashchndra bose stadium kapildhara colony, wiring of shramik sadan, pre monsoon for kurja ug mine of kurja sub area

Read more
Maintenance /repairing /dismantling / laying of 6 inch, 8 inch and 10 inch dia 3 ranges pipe line installed at mine for dewatering purpose for monsoon preparation at tapin north open cast project

Maintenance/ repairing /dismantling / laying of 6 inch, 8 inch and 10 inch dia 3 ranges pipe line installed at mine for dewatering purpose for monsoon preparation at tapin north open cast project under hazaribagh area

Read more
Erection of 3.3 kv o/h line from kali mandir sub-station to pumping statio of hired patch-c and dismantling and erection of 11kv o/h line for clearing working area of proposed patch-c of abg colliery under govindpur area

Erection of 3.3 kv o/h line from kali mandir sub-station to pumping statio of hired patch-c and dismantling and erection of 11kv o/h line for clearing working area of proposed patch-c of abg colliery under govindpur area

Read more
Installation of 01 no. endless haulage, 01 no. direct haulage and laying of haulage track line with packing to facilitate material transportation for depillaring of cm-4a, cm-4b, cm-5 panel of l-1b seam at vindhya ug mine, pinoura sub area, johilla

Installation of 01 no. endless haulage, 01 no. direct haulage and laying of haulage track line with packing to facilitate material transportation for depillaring of cm-4a, cm-4b, cm-5 panel of l-1b seam at vindhya ug mine, pinoura sub area, johilla

Read more
Laying of track line in mk seam of including transportation of line, sleeper from surface or old working of mine, providing dog nail mafish plates, nut bolts for fish plate, grading and line packing and repair/ maintenance of existing track line.

Laying of track line in mk seam of including transportation of line, sleeper from surface or old working of mine, providing dog nail mafish plates, nut bolts for fish plate, grading and line packing and repair/ maintenance of existing track line.

Read more
Dismantling, laying, periodical shortening, line packing and cleaning of haulage track along 15ls from -22rise to 40dip and -40dip from 15ls to 28l roadway in propose (-)39dip dep. panel in seam c at kurja sheetaldhara ug mine. quantity laying 995.0

Dismantling, laying, periodical shortening, line packing and cleaning of haulage track along 15ls from -22rise to 40dip and -40dip from 15ls to 28l roadway in propose (-)39dip dep. panel in seam c at kurja sheetaldhara ug mine. quantity laying 995.0

Read more
Spec.no.71-ii/24-25,rate contract for erection, maintenance and dismantling of electrical networks (oh line and ug cable) including sub-stations maintenance in construction/adyar subdivision of it corridor division for a period of one year.

Rate contract for erection, maintenance and dismantling of electrical networks (oh line and ug cable) including sub-stations maintenance in construction/adyar subdivision of it corridor division for a period of one year.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise