Tender Details

Particulars Details
Title
Construction Of 132 K V Lilo From 132 K V S/C Khinvsar To Gogelaw Line For 132 K V Kharnal Tejaji (Nagaur)
Description
Construction Of 132 K V Lilo From 132 K V S/C Khinvsar To Gogelaw Line For 132 K V Kharnal Tejaji (Nagaur) (Approx. Line Length 03 Kms) On Labour Contract Basis
Organisation RRVPN - CMD | State Govt. and UT
Tender Id 2024_RRVPN_436716_1
Reference
Number
RVPN/SE/TNC/MERTA/ BN 2810002413/2024-25
Tender Fee 5310
EMD 1.51 Lakh
Tender Value
Place MERTA CITY
Link
View Original Tender Notice

https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=784864

Start Date December 23, 2024 16:30
End Date
Expired 02/01/2025

Expired 564 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp

Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp

Read more
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode

Read more
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Read more
Supervision consultancy services for existing nh-312 of janipur to bashirhat upto ghojadanha section from km 0.000 to km 327.920 in the state of wb

Supervision consultancy services for existing nh-312 of janipur-omarpur-krishnagar-bongaon-bashirhat upto ghojadanha section from km 0.000 to km 327.920 in the state of west bengal

Read more
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam

Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam

Read more
Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electro hydraulic governing system in cpp turbines

Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electrohydraulic governing system in cpp turbines.

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Construction of 132 kv s/c sankhwas to kharnal tejaji line for 132 kv kharnal tejaji (nagaur)

Construction of 132 kv s/c sankhwas to kharnal tejaji line for 132 kv kharnal tejaji (nagaur)

Read more
Construction of 132 kv gss kharnal tejaji and 01 no. 132 kv bay at 132 kv gss sankhwas

(i) construction of 132 kv gss at kharnal tejaji, (ii) construction of 01 no. 132 kv kharnal tejaji bay at 132 kv gss sankhwas, (iii) construction of 01 no. 33 kv capacitor bank at 132 kv gss kharnal tejaji on labour contract basis

Read more
Construction of lilo 132 kv s/c tinwari-balesar line

Construction of lilo 132 kv s/c tinwari-balesar line for new proposed 132kv gss, shivnagar

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise