Tender Details

Particulars Details
Title
Transferred From Sugarcane Department Under Mankapur Assembly 1. Work Of Tiwari Link Road From Chauri Sikandarpur Road. 2.Nagwa Rewa Road Via Mirpur Yusuf To Chaksivarha Link Road.
Description
Transferred From Sugarcane Department Under Mankapur Assembly 1. Work Of Tiwari Link Road From Chauri Sikandarpur Road. 2.Nagwa Rewa Road Via Mirpur Yusuf To Chaksivarha Link Road.
Organisation Chief Engineer Devipatan (Gonda) Zone PWD Gonda | State Govt. and UT
Tender Id 2024_CEDPW_898957_1
Reference
Number
562/98Com-Gonda Circle/23-24 Dt. 09.02.24
Tender Fee 2600
EMD 6.55 Lakh
Tender Value
Place GONDA
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1546858
Start Date February 17, 2024 18:00
End Date

24/02/2024 ( Expired 456 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Widening and improvement of shangshak-tengnoupal road pkg-3 (from km. 78.250 to km. 126.250) of nh-102a into 2 lane with hard shoulder in the state of manipur under annual plan 2024-25 through epc mode (job no. 102a/mn/2024-25/42)

Widening and improvement of shangshak-tengnoupal road pkg-3 (from km. 78.250 to km. 126.250) of nh-102a into 2 lane with hard shoulder in the state of manipur under annual plan 2024-25 through epc mode (job no. 102a/mn/2024-25/42)

Read more
Wbpwd(r)/se/ chc/nit-01/ 25-26/1 / kandi bharatpur salar road from ch. 9.544 km to 10.644 km, widening and strengthening work under murshidabad highway division ii in the district of murshidabad, project id pd252632356s000.

Kandi bharatpur salar road from ch. 9.544 km to 10.644 km, widening and strengthening work under murshidabad highway division ii in the district of murshidabad, project id pd252632356s000.

Read more
Upgradation of rural road from nh-04 to kalsi village ward no. 1 at rangat north and middle andaman under pmgsy-iii - re-call

Upgradation of rural road from nh-04 to kalsi village ward no. 1 at rangat north and middle andaman under pmgsy-iii - re-call

Read more
Improvement and asphalting work from thal satsiling motor road to rin in constituency didihat of district pithoragarh (stage-2) under the state plan.

Improvement and asphalting work from thal satsiling motor road to rin in constituency didihat of district pithoragarh (stage-2) under the state plan.

Read more
Ie services for construction of new six lane access controlled capital region ring road from rameshwar (nh 16) to bilipada from km. 0.000 to km. 40.700 in the state of odisha under nh(o) on hybrid annuity mode (package 1)

Ie services for construction of new six lane access controlled capital region ring road from rameshwar (nh 16) to bilipada from km. 0.000 to km. 40.700 in the state of odisha under nh(o) on hybrid annuity mode (package 1)

Read more
Construction of new six lane access controlled capital region ring road from rameshwar (nh 16) to bilipada from km 0.000 to km 40.700 in the state of odisha under nh(o) on hybrid annuity mode (package 1)

Construction of new six lane access controlled capital region ring road from rameshwar (nh 16) to bilipada from km 0.000 to km 40.700 in the state of odisha under nh(o) on hybrid annuity mode (package 1)

Read more
Wbpwd/pw(r)/sepd/piu-i/nit-10 of 2025-2026,sl-1

Widening and strengthening of bankura khatra road (sh-2) from 11.20 km to 45.00 kmp under bankura sub-division no.-ii under bankura division in the district of bankura.

Read more
Development work of road from ambedkar tiraha to delhi chungi via jhandewala shop and sharda road under cm grid scheme

Development work of road from ambedkar tiraha to delhi chungi via jhandewala shop and sharda road under cm grid scheme

Read more
Constrcution of 200 feet wide concrete road from malerkotla road to sidhwan canal lohara bridge missing link 2 part c, ludhiana. including civil, public health, horticulture and electrical works including 05 years 1 plus 4 maintenance.

Constrcution of 200 feet wide concrete road from malerkotla road to sidhwan canal lohara bridge missing link 2 part c, ludhiana. including civil, public health, horticulture and electrical works including 05 years 1 plus 4 maintenance.

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise