Tender Details

Particulars Details
Title
Lying 550 Mtrs Approx. 200 Mm Dia. Pipe With All Accessories To Complete Third Range Pipe Line 200 Mm Dia And 250 Mm Dia Combination For Ing One Additional Pump For Effective N Quick Dewatering At Tapin North Open Cast Project Under Hazaribagh
Description
Lying 550 Mtrs Approx. 200 Mm Dia. Pipe With All Accessories To Complete Third Range Pipe Line 200 Mm Dia And 250 Mm Dia Combination For Ing One Additional Pump For Effective N Quick Dewatering At Tapin North Open Cast Project Under Hazaribagh
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2024_CCL_321934_1
Reference
Number
PE(EnM)/TNOCP/Tender/24-25/32
Tender Fee 0
EMD 6200
Tender Value
Place Tapin North OCP
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=333713
Start Date November 25, 2024 20:30
End Date

05/12/2024 ( Expired 137 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Maintenance /repairing /dismantling / laying of 6 inch, 8 inch and 10 inch dia 3 ranges pipe line installed at mine for dewatering purpose for monsoon preparation at tapin north open cast project

Maintenance/ repairing /dismantling / laying of 6 inch, 8 inch and 10 inch dia 3 ranges pipe line installed at mine for dewatering purpose for monsoon preparation at tapin north open cast project under hazaribagh area

Read more
Repairing fabrication n painting of 02 nos. old pontoon to install 1000 gpm pump- motor for quick dewatering and smooth activities of pump for coming monsoon 2025 at tapin north open cast project.

Repairing fabrication n painting of 02 nos. old pontoon to install 1000 gpm pump- motor for quick dewatering and smooth activities of pump for coming monsoon 2025 at tapin north open cast project.

Read more
Towards extension di and repairing anywhere and whenever is damaged and required as n when basis including all three existing ranges 6inch dia 8inch dia and 10inch dia pipes for smooth pumping at tapin north open cast project under hzb area

Towards extension di and repairing anywhere and whenever is damaged and required as n when basis including all three existing ranges 6inch dia 8inch dia and 10inch dia pipes for smooth pumping at tapin north open cast project under hzb area

Read more
Installation of one motorpump at pond near excavation workshop laying 700 mtrs dwchdpe 63 mm pipe 50 mm internal dia to provide water to coal stock to blow out fire caught in coal on urgent basis at tapin north open cast project under hzb area

Installation of one motorpump at pond near excavation workshop laying 700 mtrs dwchdpe 63 mm pipe 50 mm internal dia to provide water to coal stock to blow out fire caught in coal on urgent basis at tapin north open cast project under hzb area

Read more
Lying 550 mtrs approx. 200 mm dia. pipe with all accessories to complete third range pipe line 200 mm dia and 250 mm dia combination for ing one additional pump for effective n quick dewatering at tapin north open cast project under hazaribagh

Lying 550 mtrs approx. 200 mm dia. pipe with all accessories to complete third range pipe line 200 mm dia and 250 mm dia combination for ing one additional pump for effective n quick dewatering at tapin north open cast project under hazaribagh

Read more
Supplying and welding 200 mm dia. and 250 mm dia. flange with200 mm dia. and 250 mm dia. pipe for lying 3rd range pipe line at tapin north open cast project under hazaribagh area

Supplying and welding 200 mm dia. and 250 mm dia. flange with200 mm dia. and 250 mm dia. pipe for lying 3rd range pipe line at tapin north open cast project under hazaribagh area

Read more
Extension of existing all three ranges pipe lines ( two ranges are of 6 inch dia. and one range is the combination of 8inch and 10inch dia.) approximate 150 meter each from existing sump area to newly advanced sump area at tapin north open cast

Extension of existing all three ranges pipe lines ( two ranges are of 6 inch dia. and one range is the combination of 8inch and 10inch dia.) approximate 150 meter each from existing sump area to newly advanced sump area at tapin north open cast

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise