Tender Details
Particulars | Details |
---|---|
Title |
Maintenance/ Repairing/ Dismantling/ Lying Of 6inch, 8 Inch And 10 Inch Dia 3 Ranges Pipe Line Installed At Mine For Dewatering Purpose For Monsoon Preparation At Tapin North Open Cast Project Under Hazaribagh Area
|
Description |
Maintenance/ Repairing/ Dismantling/ Lying Of 6inch, 8 Inch And 10 Inch Dia 3 Ranges Pipe Line Installed At Mine For Dewatering Purpose For Monsoon Preparation At Tapin North Open Cast Project Under Hazaribagh Area
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_309492_1 |
Reference Number |
GM(H)/EnM/Tender/24-25/04 |
Tender Fee | 0 |
EMD | 6300 |
Tender Value | |
Place | Tapin North OCP |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=320676 |
Start Date | June 01, 2024 16:30 |
End Date |
11/06/2024 ( Expired 337 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Labour charges for dismantling and relaying of 6 and 8 dia. pipe line in quarry for dewatering of water (hdpe, ms) at ikocp for the year 2025-26 in srirampur area, mancherial (dist), t.s.
Labour charges for dismantling and relaying of 6 and 8 dia. pipe line in quarry for dewatering of water (hdpe, ms) at ikocp for the year 2025-26 in srirampur area, mancherial (dist), t.s.
Read moreDrilling of 03 nos. 8 inch (eight inch) dia borehole for dewatering of mine water at shiwani ug mine under bhatgaon area
Drilling of 03 nos. 8 inch (eight inch) dia borehole for dewatering of mine water at shiwani ug mine under bhatgaon area
Read moreDismantling laying pipe cutting jointing (welding) etc of 6 inch-300 mtr 8 inch dia-200 mtr 4 inch- 150 mtr. pipeline for shifting of pumps at main sump firefighting locations and others as and whenever required under ttk ocp rajhara area
Dismantling laying pipe cutting jointing (welding) etc of 6 inch-300 mtr 8 inch dia-200 mtr 4 inch- 150 mtr. pipeline for shifting of pumps at main sump firefighting locations and others as and whenever required under ttk ocp rajhara area
Read moreOperation of pumps, regulation of control valves of pumps installed and running maintenance of pumps and pipe line installed for dewatering of mine at block-b project.
Operation of pumps, regulation of control valves of pumps installed and running maintenance of pumps and pipe line installed for dewatering of mine at block-b project.
Read moreLaying of 8 inch(200mm) diameter pipeline (approx 700m) before upcoming monsoon for mine dewatering at old potanga quarry under urimari ocp.
Laying of 8 inch(200mm) diameter pipeline (approx 700m) before upcoming monsoon for mine dewatering at old potanga quarry under urimari ocp.
Read moreRelocation of ms,hdpe pipe line of size 8 inch ,10 inch dia from mines sump to north discharge point near kalvat at quarry lajkura ocp, ib valley area
Relocation of ms,hdpe pipe line of size 8 inch ,10 inch dia from mines sump to north discharge point near kalvat at quarry lajkura ocp, ib valley area
Read moreMaintenance n repairing of 11 kv grade oh line from parej substation to tapin north substation for monsoon preparation at tapin north ocp under hazaribagh area.
Maintenance n repairing of 11 kv grade oh line from parej substation to tapin north substation for monsoon preparation at tapin north ocp under hazaribagh area.
Read moreMaintenance /repairing /dismantling / laying of 6 inch, 8 inch and 10 inch dia 3 ranges pipe line installed at mine for dewatering purpose for monsoon preparation at tapin north open cast project
Maintenance/ repairing /dismantling / laying of 6 inch, 8 inch and 10 inch dia 3 ranges pipe line installed at mine for dewatering purpose for monsoon preparation at tapin north open cast project under hazaribagh area
Read moreRepairing fabrication n painting of 02 nos. old pontoon to install 1000 gpm pump- motor for quick dewatering and smooth activities of pump for coming monsoon 2025 at tapin north open cast project.
Repairing fabrication n painting of 02 nos. old pontoon to install 1000 gpm pump- motor for quick dewatering and smooth activities of pump for coming monsoon 2025 at tapin north open cast project.
Read moreDismantling, repairing and laying of the 8 inch dia m.s. pipes of the delivery pipeline of the 2000 g.p.m. pump motor set, in operation at the h patch in mine, w.r.t. karo ocp, under bnk area
Dismantling, repairing and laying of the 8 inch dia m.s. pipes of the delivery pipeline of the 2000 g.p.m. pump motor set, in operation at the h patch in mine, w.r.t. karo ocp, under bnk area
Read moreof your Industry type