Tender Details
Particulars | Details |
---|---|
Title |
Maintenance N Repairing Of 11 Kv Grade Oh Line From Parej Substation To Tapin North Substation For Monsoon Preparation At Tapin North Ocp Under Hazaribagh Area.
|
Description |
Maintenance N Repairing Of 11 Kv Grade Oh Line From Parej Substation To Tapin North Substation For Monsoon Preparation At Tapin North Ocp Under Hazaribagh Area.
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 6300 |
Tender Value | |
Place | Tapin North OCP |
Link |
AAAAAAAAAA Login to view |
Start Date | April 12, 2025 20:30 |
End Date |
24/04/2025 ( 4 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read morePreparation of dpr including land acquisition and forest clearance for construction of road tungri samchung tsela mago from new to nhsl specifications (indicative length 60 kms) under project vartak in state of arunachal pradesh
Preparation of dpr including land acquisition and forest clearance for construction of road tungri samchung tsela mago from new to nhsl specifications (indicative length 60 kms) under project vartak in state of arunachal pradesh
Read moreDeployment of contract labours to attend day to day petty maintenance works related to masonry carpentry finishing works in quarter and public buildings under north zone at btps dvc bokaro
Deployment of contract labours to attend day to day petty maintenance works related to masonry carpentry finishing works in quarter and public buildings under north zone at btps dvc bokaro
Read moreConstruction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.
Construction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.
Read moreSupply of wcl security, category ii, listed and listed i for watch and ward services under oil operational area under oil pipeline services in the state of assam for a period of 04 years from 01.07.2025 to 30.06.2029.
Supply of wcl security, category ii, listed and listed i for watch and ward services under oil operational area under oil pipeline services in the state of assam for a period of 04 years from 01.07.2025 to 30.06.2029.
Read moreProviding lying and jointing of lateral sewer line with construction of manhole adjoining area of prn north zone 7 for nevta stp under jurisdiction phe i jda jaipur
Providing lying and jointing of lateral sewer line with construction of manhole adjoining area of prn north zone 7 for nevta stp under jurisdiction phe i jda jaipur
Read moreTermination of the lilo of 220 kv sherpur jhajra at 120 mw vyasi hep ujvnl for direct at 400 kv substation sherpur pgcil with a line length of apx 2.5 km partially o h approx. 1.5 km with multi-circuit towers and partially with ug apx length 1 km
Termination of the lilo of 220 kv sherpur jhajra at 120 mw vyasi hep ujvnl for direct at 400 kv substation sherpur pgcil with a line length of apx 2.5 km partially o h approx. 1.5 km with multi-circuit towers and partially with ug apx length 1 km
Read moreUpgradation of rural road from nh-04 to nimbutala, ward 3 at rangat, north and middle andaman under pmgsy-iii, batch-i, 2024-25.
Upgradation of rural road from nh-04 to nimbutala, ward 3 at rangat, north and middle andaman under pmgsy-iii, batch-i, 2024-25.
Read moreCs for preparation of detailed project report for cons of 6lane prayagraj southern bypass phase2 l34.4 km section from km 0.000 to km 34.400 in uttar pradesh cons. of new bridge at yamuna river parallel to naini cable stayed bridge in uttar pradesh
Cs for preparation of detailed project report for cons of 6lane prayagraj southern bypass phase2 l34.4 km section from km 0.000 to km 34.400 in uttar pradesh cons. of new bridge at yamuna river parallel to naini cable stayed bridge in uttar pradesh
Read moreContract for loading of coal at colliery colliery pit head stack yard and transportation of coal by road with dumpers tippers hyva from different collieries coal washeries of bccl ecl ccl any other coal company to rtps coal yard under distance.
Contract for loading of coal at colliery colliery pit head stack yard and transportation of coal by road with dumpers tippers hyva from different collieries coal washeries of bccl ecl ccl any other coal company to rtps coal yard under distance.
Read moreof your Industry type