Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Cleaning Of Electrical Appliances Installed At Tapin Substation For The Period Of One Year At Tapin North Ocp Under Hazaribagh Area.
|
| Description |
Cleaning Of Electrical Appliances Installed At Tapin Substation For The Period Of One Year At Tapin North Ocp Under Hazaribagh Area.
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_CCL_311005_1 |
|
Reference Number |
PE(EnM)/TNOCP/Tender/24-25/09 |
| Tender Fee | 0 |
| EMD | 4500 |
| Tender Value | - |
| Place | Tapin North OCP |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=322261 |
| Start Date | June 22, 2024 17:30 |
| End Date |
Expired
02/07/2024
Expired 834 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of approach road to tapin basantpur washery under hazaribagh area
Construction of approach road to tapin basantpur washery under hazaribagh area
Read moreComprehensive annual maintenance of electrical equipments installed at 2x 10 mva main murpa substation under gm unit kuju area for a period of 01 year.
Comprehensive annual maintenance of electrical equipments installed at 2x 10 mva main murpa substation under gm unit kuju area for a period of 01 year.
Read moreProviding and fixing of 02 nos. variable electric field balance veb at weighbridge and substation of lajkura ocp, ib valley area.
Providing and fixing of 02 nos. variable electric field balance veb at weighbridge and substation of lajkura ocp, ib valley area.
Read moreBiennial maintenance contract for micom areva alstom ge relays installed at switchyard substation grp and switchgears of ntpc bgtpp
Biennial maintenance contract for micom areva alstom ge relays installed at switchyard substation grp and switchgears of ntpc bgtpp
Read moreRe-arrangement of bus bar structure, proper gravelling work of main substation for kugp and amc works of 11kv/3.3kv/550v/440v oh lines under kedla ugp, hazaribagh area.
Re-arrangement of bus bar structure, proper gravelling work of main substation for kugp and amc works of 11kv/3.3kv/550v/440v oh lines under kedla ugp, hazaribagh area.
Read moreMaint and repairs to winter appliances solar water heater, geysers and connected works under age e/m no 1 of ge (north) meerut cantt
Maint and repairs to winter appliances solar water heater, geysers and connected works under age e/m no 1 of ge (north) meerut cantt
Read moreFor independent power supply for reliable operation of the controlling circuit of different switchgear installed of 6.6kv,7/8 substation at tmc.
For independent power supply for reliable operation of the controlling circuit of different switchgear installed of 6.6kv,7/8 substation at tmc.
Read moreAmc for cabin air conditioners of 500tph feeder breakers and hemm working at khairagura ocp, bpa for a period of 3 years
Amc for cabin air conditioners of 500tph feeder breakers and hemm working at khairagura ocp, bpa for a period of 3 years
Read moreRepair of power supply unit (psu) card of vermont make flowmeter installed in the top loading system at diesel pump station, unit store, ilbl ocp
Repair of power supply unit (psu) card of vermont make flowmeter installed in the top loading system at diesel pump station, unit store, ilbl ocp
Read moreFor dismantling of ocp substation shed of size 50 ft x 50 and dismantling shifting, loading unloading of 1.5mva,6.6kv/3.3kv, transformer of badeopur colliery under sijua area
For dismantling of ocp substation shed of size 50 ft x 50 and dismantling shifting, loading unloading of 1.5mva,6.6kv/3.3kv, transformer of badeopur colliery under sijua area
Read moreof your Industry type