Tender Details

Particulars Details
Title
Fabrication And Erection Of Steel Base Frame With Pcc Foundation For 28 Lps Pump Motor At Filter Plant Of Township, Rajrappa Area
Description
Fabrication And Erection Of Steel Base Frame With Pcc Foundation For 28 Lps Pump Motor At Filter Plant Of Township, Rajrappa Area
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2025_CCL_333962_1
Reference
Number
GM(R)/ SO(ENM)/Rjp/25-26/Et/03 dt 09.04.25
Tender Fee 0
EMD 3100
Tender Value -
Place RAJRAPPA
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=346199

Start Date April 12, 2025 23:30
End Date
Expired 21/04/2025

Expired 544 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Fabrication and erection along with rcc foundation of vertical stacking racks for stacking of diesel/electrical locomotives overhauled spares at dls/vskp contract period - one year).

Fabrication and erection along with rcc foundation of vertical stacking racks for stacking of diesel/electrical locomotives overhauled spares at dls/vskp contract period - one year).

Read more
Mechanical repairing/ overhauling of gear box and gear coupling including fabrication and installation of gear box and motor base frame of conveyor unit 401 at moonidih coal washery.

Mechanical repairing/ overhauling of gear box and gear coupling including fabrication and installation of gear box and motor base frame of conveyor unit 401 at moonidih coal washery.

Read more
35 m motorized three-section flag mast system with integrated hoisting, control & aviation lighting,flag mast civil foundation, structural erection & integrated system installation service,skilled fabrication, rigging, mechanical & electrical installation labour for motorized flag mast sy

35 m motorized three-section flag mast system with integrated hoisting, control & aviation lighting,flag mast civil foundation, structural erection & integrated system installation service,skilled fabrication, rigging, mechanical & electrical installation labour for motorized flag mast sy

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Base frame fabrication

Rc for base frame fabrication on finish basis of various drawings

Read more
Pcc foundation and support welding at base of ht/lt o/h lines electric pole for making its root mechanically robust at township of rajrappa area

Pcc foundation and support welding at base of ht/lt o/h lines electric pole for making its root mechanically robust at township of rajrappa area

Read more
Pcc foundation and support welding at base of ht/lt o/h lines electric pole for making its root mechanically robust at township of rajrappa area

Pcc foundation and support welding at base of ht/lt o/h lines electric pole for making its root mechanically robust at township of rajrappa area

Read more
Demolishing of damaged concrete rcc base, dismantling of m.s foundation frame and casting of new concrete rcc base with fabrication of new m.s foundation frame for pump-motor no-3 of phase-ii along with anticorrosive painting of all foundation frame

Demolishing of damaged concrete rcc base, dismantling of m.s foundation frame and casting of new concrete rcc base with fabrication of new m.s foundation frame for pump-motor no-3 of phase-ii along with anticorrosive painting of all foundation frame

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise