Tender Details
About Tender
🚚🏭 Mtps I Mill Plant Operations Rejects Handling And Transportation Services 🚨 Tneb Limited, A State Government Undertaking, Is Seeking Bids For The Service Of Clearing Mill Rejects From Unit I And Ii Of The Mettur Thermal Power Station I/Mettur Dam. The Successful Bidder Will Be Responsible For Weighing The Rejects At The Departmental Weighbridge And Transporting Them To The Rejects Yard At The G Switch Yard Area, Coal Yard, Using Contractors' Vehicles. 📅 Bid Submission Deadline: July 17, 2024, 2:00 Pm Bid Security: Inr 19,600 Interested Contractors Must Provide Detailed Proposals, Including Methodology, Pricing, And Capacity To Handle The Specified Tasks. This Is An Opportunity To Contribute To The Efficient Operation Of One Of India's Leading Power Stations. Keywords: Mtps I, Mill Plant, Rejects Handling, Transportation Services, Tneb Limited, Power Station, State Govt. And Ut, Bid, EmdParticulars | Details |
---|---|
Title |
Mtps I Mill Plant Unit I And Ii Clearing The Mill Rejects From Unit I And Ii Mill Feeder Area Weighing In Departmental Weighbridge And Transporting To Rejects Yard G Switch Yard Area Coal Yard By Using Contractors Vehicle
|
Description |
Mtps I Mill Plant Unit I And Ii Clearing The Mill Rejects From Unit I And Ii Mill Feeder Area Weighing In Departmental Weighbridge And Transporting To Rejects Yard G Switch Yard Area Coal Yard By Using Contractors Vehicle
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_459768_1 |
Reference Number |
CE / MTPS-I / SE / M-I / MP /OT.41 / 2024-25 |
Tender Fee | 0 |
EMD | 19600 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=546493 |
Start Date | July 03, 2024 23:30 |
End Date |
17/07/2024 ( Expired 324 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtps i mill plant unit i dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and then assembling the reconditioned bends in an appropriate manner in the coal flow system
Mtps i mill plant unit i dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and then assembling the reconditioned bends in an appropriate manner in the coal flow system
Read moreMtps i mill plant unit i dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in mill 1a to 1f during annual overhaul 2025 26
Mtps i mill plant unit i dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in mill 1a to 1f during annual overhaul 2025 26
Read moreMtps i mill plant unit i removal of accumulated ash from the horizontal portions of the mill inlet hot air duct at 4 5 mtr 18 mtr level welding of eroded and worn out portion of hot air duct joints and providing guard plates for the expansion
Mtps i mill plant unit i removal of accumulated ash from the horizontal portions of the mill inlet hot air duct at 4 5 mtr 18 mtr level welding of eroded and worn out portion of hot air duct joints and providing guard plates for the expansion
Read moreMtps i mill plant unit i removal of worn out thinned out wall plates of coal bunkers 1d 1e 1f and erection of new wall plates of 12 mm thick ms plates and supporting beams and other related works
Mtps i mill plant unit i removal of worn out thinned out wall plates of coal bunkers 1d 1e 1f and erection of new wall plates of 12 mm thick ms plates and supporting beams and other related works
Read moreMtps i mill plant unit i dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2025 26
Mtps i mill plant unit i dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2025 26
Read moreTtps mech ii ahp di of various materials from uppur stpp site stores to ttps stores by segregation of materials from various locations in the materials dump yard leading lifting and restore the materials to the vehicle loading area loading tr
Ttps mech ii ahp di of various materials from uppur stpp site stores to ttps stores by segregation of materials from various locations in the materials dump yard leading lifting and restore the materials to the vehicle loading area loading tr
Read moreMtps i mill plant unit iv dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in coal mill 4a to 4f during capital overhaul 2025 26
Mtps i mill plant unit iv dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in coal mill 4a to 4f during capital overhaul 2025 26
Read moreMtps i mp unit iv overhauling of gravimetric feeders and clean out conveyor and cleaning clearing the coal dust and ash deposited from bunker platforms feeder floor feeder discharge platforms coal pipes mill floor and mill gearbox of mill 4a to 4f
Mtps i mp unit iv overhauling of gravimetric feeders and clean out conveyor and cleaning clearing the coal dust and ash deposited from bunker platforms feeder floor feeder discharge platforms coal pipes mill floor and mill gearbox of mill 4a to 4f
Read moreMtps i mill plant ac plant unit i aoh 2025 26 air washer system epoxy painting of blowers discharge duct spray system replacement of damaged duct area and renewal of bellows w type eliminator chemical cleaning overhauling the awcw pumps
Mtps i mill plant ac plant unit i aoh 2025 26 air washer system epoxy painting of blowers discharge duct spray system replacement of damaged duct area and renewal of bellows w type eliminator chemical cleaning overhauling the awcw pumps
Read moreTtps operation circle mpm i units i and ii emptying of coal from rc bunkers 1a to 1f and 2a to 2f, clearing collecting, loading, transporting and dumping the coal at coal yard ttps
Ttps operation circle mpm i units i and ii emptying of coal from rc bunkers 1a to 1f and 2a to 2f, clearing collecting, loading, transporting and dumping the coal at coal yard ttps
Read moreof your Industry type