Tender Details

Particulars Details
Title
Mtps I Mill Plant Unit I Clearing The Mill Rejects From Unit I And Ii Mill Feeder Area Weighing In Departmental Weighbridge And Transporting To Reject Yard G Switch Yard Area Coal Yard By Using Contractors Vehicle And Unloading The Same And
Description
Mtps I Mill Plant Unit I Clearing The Mill Rejects From Unit I And Ii Mill Feeder Area Weighing In Departmental Weighbridge And Transporting To Reject Yard G Switch Yard Area Coal Yard By Using Contractors Vehicle And Unloading The Same And
Organisation TNEB Limited | State Govt. and UT
Tender Id 2025_EB_522756_1
Reference
Number
CE / MTPS-I / SE / M-I / MP /OT.289/ 2024-25
Tender Fee 0
EMD 20700
Tender Value
Place Mettur Thermal Power Station-I / Mettur Dam
Link https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=622313
Start Date February 04, 2025 22:30
End Date

18/02/2025 ( Expired 84 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Mtps i mill plant ac plant unit i aoh 2025 26 air washer system epoxy painting of blowers discharge duct spray system replacement of damaged duct area and renewal of bellows w type eliminator chemical cleaning overhauling the awcw pumps

Mtps i mill plant ac plant unit i aoh 2025 26 air washer system epoxy painting of blowers discharge duct spray system replacement of damaged duct area and renewal of bellows w type eliminator chemical cleaning overhauling the awcw pumps

Read more
Work contract for removal and transportation of coal mill reject from mill bay area and dumping of the same at specified area of reject yard on biennial basis at atps mppgcl chachai.

Work contract for removal and transportation of coal mill reject from mill bay area and dumping of the same at specified area of reject yard on biennial basis at atps mppgcl chachai.

Read more
Ttps operation circle mpm ii unit-iv collecting of coal mill rejects from the mill chute, dumping in the specified area, cleaning the same, loading, transporting and dumping as a heap in a specified area at ttps from 01.04.2025 to 31.03.2026

Ttps operation circle mpm ii unit-iv collecting of coal mill rejects from the mill chute, dumping in the specified area, cleaning the same, loading, transporting and dumping as a heap in a specified area at ttps from 01.04.2025 to 31.03.2026

Read more
Ttps operation circle mpm ii unit-v collecting of coal mill rejects from the mill chute, dumping in the specified area, cleaning the same, loading, transporting and dumping as a heap in a specified area at ttps from 01.04.2025 to 31.03.2026

Ttps operation circle mpm ii unit-v collecting of coal mill rejects from the mill chute, dumping in the specified area, cleaning the same, loading, transporting and dumping as a heap in a specified area at ttps from 01.04.2025 to 31.03.2026

Read more
Ttps operation circle mpm i unit i collecting of coal rejects from the mill chute, dumping in the specified area, clearing the same, loading, transporting and dumping in a specified area of ttps for a period from 01.04.2025 to 31.03.2026

Ttps operation circle mpm i unit i collecting of coal rejects from the mill chute, dumping in the specified area, clearing the same, loading, transporting and dumping in a specified area of ttps for a period from 01.04.2025 to 31.03.2026

Read more
Ttps operation circle mpm i unit ii collecting of coal rejects from the mill chute, dumping in the specified area, clearing the same, loading, transporting and dumping in a specified area of ttps for a period from 01.04.2025 to 31.03.2026

Ttps operation circle mpm i unit ii collecting of coal rejects from the mill chute, dumping in the specified area, clearing the same, loading, transporting and dumping in a specified area of ttps for a period from 01.04.2025 to 31.03.2026

Read more
Ttps operation circle mpm i unit iii collecting of coal rejects from the mill chute, dumping in the specified area, clearing the same, loading, transporting and dumping in a specified area of ttps for a period from 01.04.2025 to 31.03.2026

Ttps operation circle mpm i unit iii collecting of coal rejects from the mill chute, dumping in the specified area, clearing the same, loading, transporting and dumping in a specified area of ttps for a period from 01.04.2025 to 31.03.2026

Read more
Manual cleaning, collection and removal of mill rejects, ash, clinkers, other coal spillage in the basement areas, coal feeder areas, boiler furnace areas, silo area and other areas of unit no.7 and 8 of dpps for a period of 02(two) years.

Manual cleaning, collection and removal of mill rejects, ash, clinkers, other coal spillage in the basement areas, coal feeder areas, boiler furnace areas, silo area and other areas of unit no.7 and 8 of dpps for a period of 02(two) years.

Read more
Mtps i mill plant unit i clearing the mill rejects from unit i and ii mill feeder area weighing in departmental weighbridge and transporting to reject yard g switch yard area coal yard by using contractors vehicle and unloading the same and

Mtps i mill plant unit i clearing the mill rejects from unit i and ii mill feeder area weighing in departmental weighbridge and transporting to reject yard g switch yard area coal yard by using contractors vehicle and unloading the same and

Read more
Mtps i mill plant unit i removal of worn out thinned out wall plates of coal bunkers 1a 1b 1c and erection of new wall plates of 12 mm thick ms plates and supporting beams and other related works

Mtps i mill plant unit i removal of worn out thinned out wall plates of coal bunkers 1a 1b 1c and erection of new wall plates of 12 mm thick ms plates and supporting beams and other related works

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise