Tender Details
Particulars | Details |
---|---|
Title |
Mtps I Mill Plant Unit I Clearing The Mill Rejects From Unit I And Ii Mill Feeder Area Weighing In Departmental Weighbridge And Transporting To Reject Yard G Switch Yard Area Coal Yard By Using Contractors Vehicle And Unloading The Same And
|
Description |
Mtps I Mill Plant Unit I Clearing The Mill Rejects From Unit I And Ii Mill Feeder Area Weighing In Departmental Weighbridge And Transporting To Reject Yard G Switch Yard Area Coal Yard By Using Contractors Vehicle And Unloading The Same And
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_522756_1 |
Reference Number |
CE / MTPS-I / SE / M-I / MP /OT.289/ 2024-25 |
Tender Fee | 0 |
EMD | 20700 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=622313 |
Start Date | February 04, 2025 22:30 |
End Date |
18/02/2025 ( Expired 84 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtps i mill plant ac plant unit i aoh 2025 26 air washer system epoxy painting of blowers discharge duct spray system replacement of damaged duct area and renewal of bellows w type eliminator chemical cleaning overhauling the awcw pumps
Mtps i mill plant ac plant unit i aoh 2025 26 air washer system epoxy painting of blowers discharge duct spray system replacement of damaged duct area and renewal of bellows w type eliminator chemical cleaning overhauling the awcw pumps
Read moreWork contract for removal and transportation of coal mill reject from mill bay area and dumping of the same at specified area of reject yard on biennial basis at atps mppgcl chachai.
Work contract for removal and transportation of coal mill reject from mill bay area and dumping of the same at specified area of reject yard on biennial basis at atps mppgcl chachai.
Read moreTtps operation circle mpm ii unit-iv collecting of coal mill rejects from the mill chute, dumping in the specified area, cleaning the same, loading, transporting and dumping as a heap in a specified area at ttps from 01.04.2025 to 31.03.2026
Ttps operation circle mpm ii unit-iv collecting of coal mill rejects from the mill chute, dumping in the specified area, cleaning the same, loading, transporting and dumping as a heap in a specified area at ttps from 01.04.2025 to 31.03.2026
Read moreTtps operation circle mpm ii unit-v collecting of coal mill rejects from the mill chute, dumping in the specified area, cleaning the same, loading, transporting and dumping as a heap in a specified area at ttps from 01.04.2025 to 31.03.2026
Ttps operation circle mpm ii unit-v collecting of coal mill rejects from the mill chute, dumping in the specified area, cleaning the same, loading, transporting and dumping as a heap in a specified area at ttps from 01.04.2025 to 31.03.2026
Read moreTtps operation circle mpm i unit i collecting of coal rejects from the mill chute, dumping in the specified area, clearing the same, loading, transporting and dumping in a specified area of ttps for a period from 01.04.2025 to 31.03.2026
Ttps operation circle mpm i unit i collecting of coal rejects from the mill chute, dumping in the specified area, clearing the same, loading, transporting and dumping in a specified area of ttps for a period from 01.04.2025 to 31.03.2026
Read moreTtps operation circle mpm i unit ii collecting of coal rejects from the mill chute, dumping in the specified area, clearing the same, loading, transporting and dumping in a specified area of ttps for a period from 01.04.2025 to 31.03.2026
Ttps operation circle mpm i unit ii collecting of coal rejects from the mill chute, dumping in the specified area, clearing the same, loading, transporting and dumping in a specified area of ttps for a period from 01.04.2025 to 31.03.2026
Read moreTtps operation circle mpm i unit iii collecting of coal rejects from the mill chute, dumping in the specified area, clearing the same, loading, transporting and dumping in a specified area of ttps for a period from 01.04.2025 to 31.03.2026
Ttps operation circle mpm i unit iii collecting of coal rejects from the mill chute, dumping in the specified area, clearing the same, loading, transporting and dumping in a specified area of ttps for a period from 01.04.2025 to 31.03.2026
Read moreManual cleaning, collection and removal of mill rejects, ash, clinkers, other coal spillage in the basement areas, coal feeder areas, boiler furnace areas, silo area and other areas of unit no.7 and 8 of dpps for a period of 02(two) years.
Manual cleaning, collection and removal of mill rejects, ash, clinkers, other coal spillage in the basement areas, coal feeder areas, boiler furnace areas, silo area and other areas of unit no.7 and 8 of dpps for a period of 02(two) years.
Read moreMtps i mill plant unit i clearing the mill rejects from unit i and ii mill feeder area weighing in departmental weighbridge and transporting to reject yard g switch yard area coal yard by using contractors vehicle and unloading the same and
Mtps i mill plant unit i clearing the mill rejects from unit i and ii mill feeder area weighing in departmental weighbridge and transporting to reject yard g switch yard area coal yard by using contractors vehicle and unloading the same and
Read moreMtps i mill plant unit i removal of worn out thinned out wall plates of coal bunkers 1a 1b 1c and erection of new wall plates of 12 mm thick ms plates and supporting beams and other related works
Mtps i mill plant unit i removal of worn out thinned out wall plates of coal bunkers 1a 1b 1c and erection of new wall plates of 12 mm thick ms plates and supporting beams and other related works
Read moreof your Industry type