Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Access Controlled Highway Of 4 Lane With Paved Shoulders From Walajapet/ Ranipet (Design Chainage Km 106.800) To Tn/ Ap Border (Design Km 134.879) Of Nh40 In Tamil Nadu On Hybrid Annuity Mode (Project Length 28.079 Kms)
|
| Description |
Access Controlled Highway Of 4 Lane With Paved Shoulders From Walajapet/ Ranipet (Design Chainage Km 106.800) To Tn/ Ap Border (Design Km 134.879) Of Nh40 In Tamil Nadu On Hybrid Annuity Mode (Project Length 28.079 Kms)
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2024_NHAI_201864_1 |
|
Reference Number |
TNDIV-21018/17/ 2024-Tamil Nadu Division |
| Tender Fee | 90000 |
| EMD | 8.38 Crore |
| Tender Value | - |
| Place | NHAI HQ |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=220870 |
| Start Date | July 19, 2024 17:30 |
| End Date |
Expired
09/01/2025
Expired 645 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Onm of nh30 old nh221 from ibrahimpatnam circle km.0.000) to ap telangana border km.70.190 of two lane with paved shoulders n four lane with paved shoulders in the state of andhra pradesh
Onm of nh30 old nh221 from ibrahimpatnam circle km.0.000) to ap telangana border km.70.190 of two lane with paved shoulders n four lane with paved shoulders in the state of andhra pradesh
Read moreUpgradation to four lane with paved shoulders of sadhuwali-banwala section from design km. 00.000 to km. 42.900 of nh-954 and banwala-hanumangarh section from design km 42.900 to km 68.140 of nh-54 in the state of rajasthan on hybrid annuity mode
Upgradation to four lane with paved shoulders of sadhuwali-banwala section from design km. 00.000 to km. 42.900 of nh-954 and banwala-hanumangarh section from design km 42.900 to km 68.140 of nh-54 in the state of rajasthan on hybrid annuity mode
Read moreUpgradation to 4 lane with paved shoulders with divided carriageway from design km 0.000 to km 37.087 of pardi nh 48 junction sukesh nanapondha kaprada section of nh 848 in the state of gujarat on hybrid annuity mode.
Upgradation to 4 lane with paved shoulders with divided carriageway from design km 0.000 to km 37.087 of pardi nh 48 junction sukesh nanapondha kaprada section of nh 848 in the state of gujarat on hybrid annuity mode.
Read moreConsultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Read moreUpgradation of existing two- lane with paved shoulders carriageway of nagaur-bikaner section of nh-62 from design km 161/000 to km 270/245 to four lane with paved shoulder in state of rajasthan on bot (toll) mode
Upgradation of existing two- lane with paved shoulders carriageway of nagaur-bikaner section of nh-62 from design km 161/000 to km 270/245 to four lane with paved shoulder in state of rajasthan on bot (toll) mode
Read moreUpgradation of chitrod-rapar-balasar section of nh-927c to two-lane with paved shoulders from design km 0.00 to km 57.848 in the state of gujarat on epc mode.
Upgradation of chitrod-rapar-balasar section of nh-927c to two-lane with paved shoulders from design km 0.00 to km 57.848 in the state of gujarat on epc mode.
Read moreUpgradation to 2 lane with paved shoulders of naliya narayan sarovar section from design km 220.773 to km 288.987 of nh 41 in the state of gujarat on epc mode.
Upgradation to 2 lane with paved shoulders of naliya narayan sarovar section from design km 220.773 to km 288.987 of nh 41 in the state of gujarat on epc mode.
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreWidening and upgradation of existing highway from khagaria (design ch. 270.000) to purnea (design ch. 413.529) section of nh 31 and nh 231 to 4 lane with paved shoulders under nh (o) on bot (toll) in the state of bihar (2 nd call)
Widening and upgradation of existing highway from khagaria (design ch. 270.000) to purnea (design ch. 413.529) section of nh 31 and nh 231 to 4 lane with paved shoulders under nh (o) on bot (toll) in the state of bihar (2 nd call)
Read moreEngagement of user fee agency on the basis of eq through e-tender for rangamatia fp located at design km 190.050 for the use of two lane with paved shoulders of adenigada-maichheli section in odisha
Engagement of user fee agency on the basis of eq through e-tender for rangamatia fp located at design km 190.050 for the use of two lane with paved shoulders of adenigada-maichheli section in odisha
Read moreof your Industry type