Tender Details

Particulars Details
Title
E 75 (24 25) Modular Ot 1, 2 And Recovery Room
Description
E 75 (24 25) Modular Ot 1, 2 And Recovery Room
Organisation Director Medical Education and Research Department Mumbai | State Govt. and UT
Tender Id 2024_MERDM_1068477_1
Reference
Number
e-75 (24-25) Modular OT 1, 2 and Recovery Room
Tender Fee 20000
EMD 7.1 Lakh
Tender Value -
Place DMER Mumbai
Link
View Original Tender Notice

https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1864062

Start Date August 10, 2024 22:15
End Date
Expired 30/08/2024

Expired 772 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Establishment of modular ot

Establishment of modular ot

Read more
Supply of slurry duty dewatering pumps for utilization at various locations of ash water recovery system and zero discharge system

Supply of slurry duty dewatering pumps for utilization at various locations of ash water recovery system and zero discharge system

Read more
Consultancy services for preparation of detailed project report (dpr) for flood management, embankment strengthening, river training, land recovery and development of the ganga river corridor in bihar.

Consultancy services for preparation of detailed project report (dpr) for flood management, embankment strengthening, river training, land recovery and development of the ganga river corridor in bihar.

Read more
Emergency repairs to mechanical gate of ot sluice and right side dp at 0.070 km of aragundala anicut near thalladharmaram (v), beerpur (m), jagtial dist.

Emergency repairs to mechanical gate of ot sluice and right side dp at 0.070 km of aragundala anicut near thalladharmaram (v), beerpur (m), jagtial dist.

Read more
Design, build, construct, install adn commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years.

Design, build, construct, install adn commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years.

Read more
Design, build, construct, install, and commissioning of material recovery facility (mrf) of 05 tpd for dry waste along with operation and maintenance of the plant for 5 years.

Design, build, construct, install, and commissioning of material recovery facility (mrf) of 05 tpd for dry waste along with operation and maintenance of the plant for 5 years.

Read more
Consultancy services for preparation of detailed project report (dpr) for flood management, embankment strengthening, river training, land recovery and development of the kosi and gandak river corridor in bihar.

Consultancy services for preparation of detailed project report (dpr) for flood management, embankment strengthening, river training, land recovery and development of the kosi and gandak river corridor in bihar.

Read more
Design, build, construct, install and commissioning of material recovery facility (mr f) of 05 tpd for dry waste along with operation and maintenance of the plant for 5 year s

Design, build, construct, install and commissioning of material recovery facility (mr f) of 05 tpd for dry waste along with operation and maintenance of the plant for 5 year s

Read more
Procurement and supply of ot lights high end and surgical diathermy with vessel sealing to vascular access centres in telangana state under rate contract for a period of 2 years

Procurement and supply of ot lights high end and surgical diathermy with vessel sealing to vascular access centres in telangana state under rate contract for a period of 2 years

Read more
Design, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years on epc mode under nagar parishad khagaria

Design, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years on epc mode under nagar parishad khagaria

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise